Loading...
HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0044-2020-BCHO (4) 0044-2020-BCHO_BuildingCommentl Change Order 3 Landscape Plan.1419 Crystal Lake.2020.06.pdf(3) Subject: PlanCheck Changes should be bubbled in / Page: L-1.09 OUTLYING BOULDER& PLANTING BED PLAN g Author:justinh all change orders. K' ----% Color: ■_ File Name: Change Order 3 Landscape Plan.1419 Crystal Changes should be bubbled in all change orders. Lake.2020.06.pdf I Subject: PlanCheck g� - - Page: L.4.01 UPPER LEVEL ENLARGEMENTS Upper level deck is not shown - 0Author:justinh on the original REMP worksheet or— Color: •7:-,----- -.I,6 and I cannot find any specs that I F . File Name: Change Order 3 Landscape Plan.1419 Crystal demonstrate it is exempt from Lake.2020.06.pdf REMP. Provide specs on the proposed spa and cover and L 7 update the REMP form to either _� u — include it as either exempt or o non-exempt spa square footage. I' -. rr,111 Previously approved REMP worksheet attached for reference. Subject: PlanCheck Page: L.5.03 LANDSCAPE DETAILS Is the spa surround being built " Author:justinh out 20"wide at the skirt or is this Color: • just a wrap? If it is being built - :_:. ___�'.- out 20"wide you are creating a ___-. _ File Name: Change Order 3 Landscape Plan.1419 Crystal walking surface above the stairs ' , E�' Lake.2020.06.pdf s� and a full height guard is IL I 11E.Em� - required per our spa safety rail policy(attached). Clarify or = - revise to comply. Structural plan seems to be more in line with what was shown in the original master permit so I'm a little confused what this is actually showing.