HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0044-2020-BCHO (4) 0044-2020-BCHO_BuildingCommentl
Change Order 3 Landscape Plan.1419 Crystal Lake.2020.06.pdf(3)
Subject: PlanCheck Changes should be bubbled in
/ Page: L-1.09 OUTLYING BOULDER& PLANTING BED PLAN g
Author:justinh all change orders.
K' ----% Color: ■_
File Name: Change Order 3 Landscape Plan.1419 Crystal
Changes should be bubbled in all change orders.
Lake.2020.06.pdf
I
Subject: PlanCheck
g� - - Page: L.4.01 UPPER LEVEL ENLARGEMENTS Upper level deck is not shown
- 0Author:justinh on the original REMP worksheet
or— Color: •7:-,----- -.I,6
and I cannot find any specs that
I F . File Name: Change Order 3 Landscape Plan.1419 Crystal demonstrate it is exempt from
Lake.2020.06.pdf REMP. Provide specs on the
proposed spa and cover and
L 7 update the REMP form to either
_� u — include it as either exempt or
o non-exempt spa square footage.
I' -. rr,111
Previously approved REMP
worksheet attached for
reference.
Subject: PlanCheck
Page: L.5.03 LANDSCAPE DETAILS Is the spa surround being built
" Author:justinh out 20"wide at the skirt or is this
Color: • just a wrap? If it is being built
- :_:. ___�'.- out 20"wide you are creating a
___-. _ File Name: Change Order 3 Landscape Plan.1419 Crystal walking surface above the stairs
' , E�' Lake.2020.06.pdf
s� and a full height guard is
IL I 11E.Em� - required per our spa safety rail
policy(attached). Clarify or
= - revise to comply. Structural plan
seems to be more in line with
what was shown in the original
master permit so I'm a little
confused what this is actually
showing.