Loading...
HomeMy WebLinkAboutMaster Permit.506 E Main St.0054.2019.ACBK 11/30/24, 10:07AM 0054.2019.ACBK-Salesforce-Enterprise Edition 41P • Close Window . Print This Page . Expand All I Collapse All 0054.2019.ACBK Number 0054.2019.ACBK Record Type Building- Imported Address 506 E MAIN ST Owner Fernando Cruz Original Number 0054.2019.ACBK Status Closed-Final Type Building Reason for Cancel or Compl.Review Fail Applicant Brady Blackmer Aspen Internal? Account FCI CONSTRUCTORS INC Required Bond Amount Project Total Available Bond Amount Land Use Planning Is This Associated w/a Application Building Permit? Permit Contractor FCI CONSTRUCTORS INC Master Building Permit Valid Business License Bluebeam Project Id 302-315-897 on Account Imported j HPC-ZON-EH-UTIL HPC Rev, Review Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Eng Review Eng-CMP Rev,Eng-Dev Rev,Eng-ES Resubmitted Rev,Util Rev,Eng-Wtr Rev, Approved Covid-19 Parks-Prkng-San Parks Rev,Parks Fee,Water-LSE Plan Review Rev,Parking Rev,San Rev, Conditional HPC Insp,Parks Insp, Inspections Conditional Final Insp HPC Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parking Final,Parks Final,Water-LSE Final,San Final, Action Items Hold All Reviews Create Fees .4/ Hold Reason Create Fees 2 Utility Review Type Minor Price Book EDEN Conditional Flat Fee Applicant is a Formula Nonprofit? Conditional Tiered Fee Eligible for Small Formula Lodge Program? Conditional Tiered MAC, Discount All Fees(%) SqFt Fee Formula Fee Discount Reason CO/LOC? CO Status if Applicable Issued Queue Score https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 1/23 11/30/24, 10:07AM 0054.2019.ACBK-Salesforce-Enterprise Edition Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received Milestone-Total Days from Applicant in Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 9/6/2019 TCO Issuance Date Application Complete 9/6/2019 Close/CO Issuance 1/26/2022 Date Date Application Accepted 6/20/2019 Expiration Date 1/3/2022 Date Issue Date 9/6/2019 Override Expiration Date Last Activity Date 12/15/2021 Basic Information Description Applicant: Census Code 437-Additions Alterations and Brady Blacker Conversion-Nonresidential and Non- FCI housekeeping REHABILITATE THE EXISTING COURTHOUSE RECONFIGURE INTERIOR WALLS RESTROOMS ACCESSIBILITY UPGRADES TO COURTROOMS PUBLIC SPACE AND OFFICES. INSTALLATION OF NEW ACCESSIBLE LIFT AT SOUTH ENTRANCE FOR SINGLE POINT PUBLIC ACCESS AND NEW SECURITY CHECK POINT//P Use of Building Commercial Interior Remodel Only Use Class Commercial Class of Work Alteration Permit Comments Job Location Address 506 E MAIN ST,ASPEN : 273707347851 Lot 1 Site Address Display on Map Legal Description Historic Property? No Eden Address 506 E MAIN ST Historic District? Yes HPC - Planning -Zoning Details Zone District PUB HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of Yes Appropriateness? ADU Sq Ft Work Involves a Land No Use Approval? Deed Restricted? No Located in a PD? Yes https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 2/23 11/30/24, 10:07AM 0054.2019.ACBK-Salesforce-Enterprise Edition #of Dwellings Adds/Changes Floor Yes Area? Category of Zoning Commercial Occupancy or Use No Fee Change? Zoning Work Level Major Zoning Fee Work Affects Exterior Yes of Building? Building Project Details Valuation $4,212,666.00 Lot Size Sq.Ft. 62,291 Reason for Valuation Soil Disturbance Sq Ft 7,355 Change Unit Sq.Ft. 16,168 Affected Area Sq Ft 7,355 Building Footprint Sq Existing Hardscape Ft Footprint Sq Ft Sq Ft of Building Work 16,168 Existing Hardscape% 0% Area of Lot Building Fire Area Sq 16,168 Con Mit Sq Ft Total 23,523 Ft Utility Review Sq.Ft. 7,355 Utility Review Sq Ft 7,355 Total %of Interior being 50% Altered New Sq.Ft. 0 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Yes Footprint? Line? Work Changes Yes Located Within City No Fenestration/Thrml Mall Boundaries? Envelop? Requires Asbestos Yes Adjacent to City Open No Test? Space? Photovoltaic Installation No Impacts City NO Trails/Parks? Work Yes Work Subject to Water No Adds/Removes/Changes Efficient L.O.? Plumbing Fixt? Restaurant/Food No Involves Impact on Yes Service Involved? Sewer? Change of Restaurant No Prevents Access to No Ownership? Sewer Main? Affects Yes Sewer Easements No Parking/Alleys/Loading? Affected? Building Description Code Editions 2015 IBC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type IIIA Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Fire Sprinkler Amount of Onsite Existing? Renewable Generation? https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 3/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition Fire Sprinkler Yes CO Description Required? Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor #Wood Fireplaces 2nd Floor #Gas Log Fireplaces 3rd Floor #Gas Appliances Additional Open Text Field For Comments Financials Total Fees $0.00 Total Payments Fees Due at Current Total Balance $0.00 Status System Information Number 0054.2019.ACBK Community Visibility Created By Ruth Kinney, 7/27/2019 1:49 PM Contact IDs 0033s00000yN6IAAA0,0033s00000yN61AAA0 IsTestData? Last Modified By Fernando Cruz, 11/30/2024 10:07 AM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Certificate of Occupancy -506 E Main St-0054.2019.ACBK- Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 9/16/2020 Days in Applicant's Hands Comments To: bblackmer@fciol.com CC: BCC: Attachment: Notice_to_Contractor_506 E Main St-0054.2019.ACBK.pdf, 1-City Final Return_Use Tax.pdf, 506 E Main st-0054.2019.ACBK_CO.pdf, City_Use_Tax_to_Owner_506 E Main St- 0054.2019.ACBK.pdf, 1-County Use Tax Final Return Template(PDF).pdf Subject: Certificate of Occupancy-506 E Main St-0054.2019.ACBK-Issued Body: Good Morning, Please find attached your issued Certificate of Occupancy for the project at 0054.2019.ACBK Additionally you will find your City Use tax letter and tax reconciliation forms and the City use tax https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 4/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition letter for the owner of the property. If you have any questions please let us know. Kind regards, Lilly Culver Email: Updated Temporary Certificate of Occupancy-issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/20/2020 Days in Applicant's Hands To: bblackmer@fciol.com CC: BCC: Attachment: TCO_506 E Main St-0054.2019.ACBK.pdf Subject: Updated Temporary Certificate of Occupancy-issued Body: Comments Good afternoon, Please find attached the updated TCO for the project at 506 E Main St. Please let me know if you have any questions. Kind regards, Lilly Culver Email: COVID-19 Safety Plan Approval Type Billable Assigned To Steve Feder Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/26/2020 Days in Applicant's Hands To: bblackmer@fciol.com CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200426.pdf Subject: COVID-19 Safety Plan Approval Body: Comments Dear Brady Blackmer, Thank you for submitting a COVID-19 Site Safety Plan for 0054.2019.ACBK at 506 E MAIN ST.City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re-commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan,as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe,and please let us know if you have any further questions. Email: Temporary Certificate of Occupancy-0054.2019.ACBK-506 E Main St-Issued Type https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 5/23 11/30/24, 10:07AM 0054.2019.ACBK—Salesforce-Enterprise Edition Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/3/2020 Days in Applicant's Hands To: bblackmer@fciol.com CC: sjones@fciol.com BCC: Attachment: TCO_506 E Main St-0054.2019.ACBK.pdf Subject: Temporary Certificate of Occupancy-0054.2019.ACBK-506 E Main St-Issued Body: Comments Good afternoon, Please find attached your issue Temporary certificate of occupancy for 506 E Main st. Please let us know if you have any questions. Kind regards, Lilly Culver Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Sophie Varga Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/24/2019 Days in Applicant's Hands Comments To: bblackmer@fciol.com CC: BCC: Attachment: --none-- Subject: Important!Your City of Aspen permit has been moved to new permitting system Body: Dear Brady Blackmer, As you may know,the City of Aspen has been transitioning to a new online-based permitting system, Salesforce.Thank you for your patience during this transition,which is now complete.Your permit is now operational in Salesforce.Your project located at 506 E MAIN ST,ASPEN : 273707347851 will retain its original permit number, 0054.2019.ACBK and you will use this number to find your permit in Salesforce. If you have not already done so,you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidld= If you have additional questions that are not addressed at the above links,you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 6/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition Sincerely, Phil LeHue City of Aspen Sophie Varga Zoning Enforcement Officer Community Development 130 S. Galena St. Aspen, CO 81611 p: 970.429.2778 c: 970.274.7256 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable,the information and opinions contained in the email are based on current zoning,which is subject to change in the future, and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 7/24/2020 Days in Applicant's Hands Comments Permit Review Type Building Billable Assigned To Mike Metheny Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 4/3/2020 Days in Applicant's Hands Comments Permit Review Type Building Billable Assigned To Mike Metheny Number of Hours 3.00 Total Cost $975.00 Fee Generated Date Start Date https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 7/23 11/30/24, 10:07AM 0054.2019.ACBK-Salesforce-Enterprise Edition Completed Date 4/3/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/25/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/23/2020 Days in Applicant's Hands Comments Permit inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/3/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 1/23/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 8/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/10/2020 Days in Applicant's Hands Comments Contacts STEVEN JONES Account FCI CONSTRUCTORS INC Type Applicant Active Contractor License Count 1.00 Number 0022472 STEVEN JONES Account FCI CONSTRUCTORS INC Type Contractor Active Contractor License Count 1.00 Number 0024189 Files 1-County Use Tax Final Return Template 1-City Final Return_Use Tax (PDF) Last Modified 9/16/2020 7:04 AM Last Modified 9/16/2020 7:04 AM Created By Lilly Culver Created By Lilly Culver Notice_to_Contractor_506 E Main St-0054.2019.ACBK City_Use_Tax_to_Owner_506 E Main St- Last Modified 9/16/2020 7:03 AM 0054.2019.ACBK Created By Lilly Culver Last Modified 9/16/2020 7:03 AM Created By Lilly Culver City_Use_Tax_-_FRR_Transmittal_to_Owner 20200916.docx Last Modified 9/16/2020 6:53 AM City_Use_Tax_- FRR Notice to Contractor 20200916.docx Created By Lilly Culver Last Modified 9/16/2020 6:54 AM UCP Water Final 20200903.docx Created By Lilly Culver — — Last Modified 9/3/2020 1:10 PM 506 E Main st-0054.2019.ACBK CO Created By Steve Wilson Last Modified 9/16/2020 6:52 AM APPROVAL —NOTICE—COVID-19—SITE—SAFETY—PLAN 20200426.pdf Created By Lilly Culver Last Modified 4/26/2020 12:38 PM TCO 506 E Main St-0054.2019.ACBK Created By Steve Feder Last Modified 5/20/2020 3:03 PM TCO - Created By Lilly Culver _City_of_Aspen_Temporary_Certificate_of Occupancy_20200403.docx Last Modified 4/3/2020 6:16 AM IBC TCO Letter 20200403.docx Created By Lilly Culver Last Modified 4/3/2020 6:20 AM Created By Lilly Culver inspections 0054.2019.acbk Last Modified 11/22/2019 9:54 AM permit fee estimate 0054.2019.acbk Created By Sophie Varga Last Modified 11/22/2019 9:54 AM Created By Sophie Varga Inspections https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 9/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0005985-19 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 7/29/2020 Owner Last Name Radeck Permit Inspection Round Initial Inspection Closed TRUE INS-0005989-19 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date Scheduled Start Date 1/6/2020 Completed Date 1/6/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005990-19 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 1/10/2020 6:45 AM Scheduled Start Date 1/10/2020 Completed Date 1/10/2020 Owner Last Name Parry Permit Inspection Round Initial Inspection Closed TRUE INS-0005993-19 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 1/20/2020 3:06 PM Scheduled Start Date 1/21/2020 Completed Date 1/21/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0005995-19 Status Partial/Non-Complete Type Building Subtype Final Building Requested Date 4/3/2020 12:37 PM Scheduled Start Date 4/3/2020 Completed Date 4/3/2020 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 10/23 11/30/24, 10:07AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0006006-19 Status Pass/Accepted Type Zoning Subtype Requested Date 9/9/2020 1:01 PM Scheduled Start Date 9/9/2020 Completed Date 9/9/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0006008-19 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 3/24/2020 10:49 AM Scheduled Start Date 3/25/2020 Completed Date 3/25/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006010-19 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 1/23/2020 11:00 AM Scheduled Start Date 1/23/2020 Completed Date 1/23/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006013-19 Status Pass/Accepted Type Fire Subtype Requested Date Scheduled Start Date Completed Date 8/31/2020 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0000284-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 2/3/2020 11:45 AM Scheduled Start Date 2/3/2020 Completed Date 2/3/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 11/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0001496-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 2/14/2020 10:00 AM Scheduled Start Date 2/14/2020 Completed Date 2/14/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0006498-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/24/2020 3:58 PM Scheduled Start Date 4/26/2020 Completed Date 4/26/2020 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0008899-20 Status Pass/Accepted Type Building Subtype Rough Framing Requested Date 6/12/2020 9:00 AM Scheduled Start Date 6/12/2020 Completed Date 6/12/2020 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0009125-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 6/16/2020 7:00 PM Scheduled Start Date 6/16/2020 Completed Date 6/16/2020 Owner Last Name Permit Inspection Round Closed TRUE INS-0009126-20 Status Pass/Accepted Type Building Subtype Rough Framing Requested Date 7/23/2020 4:15 PM Scheduled Start Date 7/24/2020 Completed Date 7/24/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 12/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0012249-20 Status Pass/Accepted Type HPC Subtype Requested Date 9/2/2020 12:06 PM Scheduled Start Date Completed Date 9/2/2020 Owner Last Name Simon Permit Inspection Round Final Inspection Closed TRUE INS-0012280-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 9/3/2020 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0012375-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date 9/9/2020 1:05 PM Scheduled Start Date 9/9/2020 Completed Date 9/14/2020 Owner Last Name Roedel -On Maternity Leave-please chatter @Kyla Smits Permit Inspection Round Final Inspection Closed TRUE INS-0012376-20 Status Pass/Accepted Type Engineering Erosion&Sediment Subtype Requested Date 9/9/2020 1:13 PM Scheduled Start Date 9/9/2020 Completed Date 9/24/2020 Owner Last Name Out of Office for the season, message @TimRohe for help. Permit Inspection Round Final Inspection Closed TRUE INS-0012377-20 Status Pass/Accepted Type Parking Subtype Requested Date 9/9/2020 1:14 PM Scheduled Start Date 9/9/2020 Completed Date 7/7/2021 Owner Last Name Permit Inspection Round Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 13/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0012379-20 Status Scheduled Type Sanitation Subtype Requested Date 9/9/2020 1:16 PM Scheduled Start Date 9/9/2020 Completed Date Owner Last Name Strait Permit Inspection Round Closed FALSE INS-0012742-20 Status Pending Type Parks Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0012743-20 Status Pending Type Water Efficient Landscaping Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007982-21 Status Pending Type Water Efficient Landscaping Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007983-21 Status Pending Type HPC Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 14/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0007984-21 Status Pending Type Engineering Erosion &Sediment Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007985-21 Status Pending Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007986-21 Status Pending Type Parks Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007987-21 Status Pending Type Parking Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007988-21 Status Pending Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 15/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0007989-21 Status Pending Type Engineering Dev Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007990-21 Status Pending Type Utilities Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE I N S-0007991-21 Status Pending Type Building&Referral Inspection Status Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE I N S-0007992-21 Status Pending Type Zoning Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0007993-21 Status Pending Type Fire Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE MEP Permit Inspections https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 16/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0006053-19 Type Mechanical Subtype Mechanical Ventilation Status Partial/Non-Complete Permit 0210.2019.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006057-19 Type Mechanical Subtype Rough Mechanical Status Partial/Non-Complete Permit 0210.2019.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006059-19 Type Mechanical Subtype Final Mechanical Status Partial/Non-Complete Permit 0210.2019.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006062-19 Type Mechanical Subtype In-Floor Heat Status Partial/Non-Complete Permit 0210.2019.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006063-19 Type Fire Subtype Status Pending Permit 0106.2019.afsr Due Date Priority 2 Normal Owner Alias Fire-Inspection Closed FALSE INS-0006387-19 Type Electric Subtype Rough Electrical Status Partial/Non-Complete Permit 0177.2019.AELE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 17/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006392-19 Type Electric Subtype Final Electrical Status Partial/Non-Complete Permit 0177.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006396-19 Type Plumbing Subtype Final Plumbing Status Partial/Non-Complete Permit 0126.2019.ASPL Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0008232-20 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0177.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0012378-20 Type Water Efficient Landscaping Subtype Status Pass/Accepted Permit Due Date Priority 2 Normal Owner Alias rmagi Closed TRUE INS-0001594-22 Type Building Subtype Rough Framing Status Pass/Accepted Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias BClin Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 18/23 11/30/24, 10:07AM 0054.2019.ACBK-Salesforce-Enterprise Edition INS-0001704-22 Type Building Subtype Special Building Inspection Status Pass/Accepted Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias BCIin Closed TRUE INS-0001764-22 Type Building Subtype Special Building Inspection Status Re-Inspection Required Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0001804-22 Type Building Subtype Drywall Status Pass/Accepted Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias BClin Closed TRUE INS-0002333-22 Type Building Subtype Rough Framing Status Pass/Accepted Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0002585-22 Type Building Subtype Drywall Status Pass/Accepted Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias BCIin Closed TRUE INS-0003655-22 Type Concrete Subtype Pads Status Accepted as Noted Permit 0010-2022-BCOM https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 19/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0004409-22 Type Building Subtype Special Building Inspection Status Pass/Accepted Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias BClin Closed TRUE INS-0004419-22 Type Building Subtype Final Building Status Re-Inspection Required Permit 0010-2022-BCOM Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE Milestones Review Round 1 -0054.2019.ACBK Status Approved Due Date Created Date 11/22/2019 Permit History 11/30/2024 10:07 AM User Fernando Cruz Action Changed Owner from Emmy Garrigus to Fernando Cruz. Related Permits 0177.2019.AELE Type Electrical Address 506 E MAIN ST Work Type New Status Closed -Final Applicant Kevin Messerschmidt Issue Date 10/14/2019 Last Activity Date 6/30/2020 0126.2019.ASPL Type Plumbing Address 506 E MAIN ST Work Type New Status Closed -Final Applicant RYAN BUTLER Issue Date 10/17/2019 Last Activity Date 7/23/2020 0210.2019.AMEC https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 20/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition Type Mechanical Address 506 E MAIN ST Work Type New Status Closed -Final Applicant RYAN BUTLER Issue Date 10/21/2019 Last Activity Date 7/23/2020 0106.2019.afsr Type Fire Address 506 E MAIN ST Work Type New Status Expired Applicant SPENCER BOOTHE Issue Date 10/28/2019 Last Activity Date 11/22/2019 0030-2020-BCHO Type Change Order Address 506 E MAIN ST Work Type New Status Closed -Final Applicant ANDY DUCKETT-EMKE Issue Date 8/13/2020 Last Activity Date 0010-2022-BCOM Type Building Address 506 E MAIN ST Work Type New Status Closed -Final Applicant ANDY DUCKETT-EMKE Issue Date 3/7/2022 Last Activity Date 5/2/2023 Reviews REV-009221 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Parks Due Date Completed Date 11/22/2019 9:55 AM Owner Alias DRade On Hold Created Date 11/22/2019 REV-009223 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 11/22/2019 9:58 AM Owner Alias rmagi On Hold Created Date 11/22/2019 https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 21/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition REV-009224 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Sanitation Due Date Completed Date 11/22/2019 9:59 AM Owner Alias Sanitation-Review On Hold Created Date 11/22/2019 REV-009225 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Engineering Water Due Date Completed Date 11/22/2019 10:01 AM Owner Alias SWilson On Hold Created Date 11/22/2019 REV-009226 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Engineering CMP Due Date Completed Date 11/22/2019 10:04 AM Owner Alias PHarr On Hold Created Date 11/22/2019 REV-009227 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Engineering Dev Due Date Completed Date 11/22/2019 10:04 AM Owner Alias JDann On Hold Created Date 11/22/2019 REV-009228 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Engineering Erosion&Sediment Due Date Completed Date 11/22/2019 10:06 AM Owner Alias PHarr On Hold Created Date 11/22/2019 REV-009229 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Fire https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 22/23 11/30/24, 10:07 AM 0054.2019.ACBK-Salesforce-Enterprise Edition Due Date Completed Date 11/22/2019 10:07 AM Owner Alias DMurr On Hold Created Date 11/22/2019 REV-009230 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Zoning Due Date Completed Date 11/22/2019 10:05 AM Owner Alias Zoning-Review On Hold Created Date 11/22/2019 REV-009231 Milestone Review Round 1 -0054.2019.ACBK Status Approved Type Building Due Date Completed Date 11/22/2019 10:09 AM Owner Alias BMuhi On Hold Created Date 11/22/2019 Submissions Pitkin County Courthouse COA COVID-19 Plan .pdf Actions Submission Date 4/24/2020 3:56 PM Status Required Description Copyright©2000-2024 salesforce.com, inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000kZro8AAC/p 23/23