Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0054.2019 (2).ACBK 0054.2019.ACBK_BuildingComments_1_Markup Summary 2019.05.29 Mechanical.pdf(1) • ._n File Name: 2019.05.29 Mechanical.pdf _= a_=___ - rPv Author: bonniem Thermostat heights to comply _-®=w -�-�=w with reach ranges in ICC " Subject: PlanCheck =_ -• •--„- Color: •■ A117.1-2009 308. 2019.05.29 Pitkin Permit Electrical.pdf(1) =.t= i :-° 1 1 File Name: 2019.05.29 Pitkin Permit Electrical.pdf .. ' ° W Author: mitchm 620.22 Branch Circuits for Car 04' m �2 o w Subject: Electrical Code Lighting, n,R Heating,ept and), z Lu Color: ■ Ventilation, o w = . Air-Conditioning. ® U co . (A)Car Light Source.A separate YO ? e 1Ex i< ' branch circuit shall supply ������ � 0 the car lights, receptacle(s), .rriF17 p0.1 auxiliary lighting power source, == and -- ventilation on each elevator car. The overcurrent device protecting the branch circuit shall be located in the elevator machine room or control room/machinery space or control space. Required lighting shall not be connected to the load side of a ground-fault circuit interrupter 2019.06.14 Pitkin Permit-Architectural.pdf(5) File Name: 2019.06.14 Pitkin Permit-Architectural.pdf Author: bonniem Provide the full installation IN---2-`:- 0 instructions from the Gypsum Subject: PlanCheck ® Manual for WP 1072,WP 3510, ac.:AII Color: ■ s�. WP 6800, FC3510 in the plan 1, set for reference at inspection. l•ii I.I il' I; File Name: 2019.06.14 Pitkin Permit-Architectural.pdf Per information provided on the Author: bonniem Subject: PlanCheck asbesos verification checklist Per information provided on the asbesos verification :J an asbestos checklist this project requires an asbestos test. Color: ■ this projectrequires Provide an asbestos test report that includes the following: test. Provide an asbestos test 1.Inspector's narrative including sampling locations 2.Inspectors certificate -- report that includes the following: 3 Lab data And 1.Inspector's narrative including If asbestos is found,a final air clearance report must be provided prior to building permit issuance x.�., sampling locations K 2. Inspector's certificate ' 3. Lab data 7. If asbestos is found, a final air clearance report must be provided prior to building permit issuance. :.-..•n . File Name: 2019.06.14 Pitkin Permit-Architectural.pdf Author: bonniem Include U-factor requirements for Mr_�a �� ..__. Subject: PlanCheck new windows per Table C402.4 Color: • Ea File Name: 2019.06.14 Pitkin Permit-Architectural.pdf Author: bonniem The special inspection Subject: PlanCheck agreement needs to be Color: • completed and signed by all 41(Thes sins inspection agreement to bepartiesprior to permit issuance. peed p greemen - imp e[ed and signed by all parties prior to permit - �'.- "' P a : _ '.i File Name: 2019.06.14 Pitkin Permit-Architectural.pdf ® " I u Author: bonniem Occupant load of the gardenrrr�rr� *ti' level courtroom exceeds 50, ,� Subject: PlanCheck Color • Doors to swing in the direction of egress travel per 2015 IEBC q,, ® r - t m 805.4.2 IIIIIIIoi'wy �