Loading...
HomeMy WebLinkAboutFile Documents.536 Walnut St.0118.2019.ARBK DATE:4/10/19 MASTER PERMIT: PERMIT NUMBER:0118.2019.ARBK • COMMUNITY DEVELOPMENT DEPARTMENT �� BUILDING PERMIT APPLICATION ��O ` CITY OF ASPE N PROPERTY INFORMATION 1 ADDRESS 536 Walnut St. UNIT#A PARCEL ID# 273707396001 TRACT Fox Crossing LOT 9 BLOCK OR SUBDIVISION OWNER NAME Les&Lynn Bider CELL(310)998-7248 EMAIL lesbider@yahoo.com BEST CONTACT Delvon Nemechek CELL(970)429-8711 EMAIL delvon@rowlandbroughton.com NAME PROJECT DETAILS (READ DEFINITIONS BELOW) THISSECTIONIMUSTBE COMPLETED IN ITS ENTIRETY 1 OF WORK INION D TAIL Interior remodel to an existing Fox Crossing home, including removal of an elevator and powder room and the addition of a small office. PROJECT 1,528,860.22 Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical ❑ New 5 Toilets,Bidets Major Engineering Review SQFTOF 0 Multi-Family ❑■ Addition 2 Bathtub •Projects involving less than 50% BUILDING GEA 3649 ❑■ Single Family ❑ Alteration 6 Lavatory(Wash Basin) hardscape area and work affecting W AR ❑ Mixed-Use 0 Repair ' Shower 75%or greater of unit sq ft 3649Kitchen Sink(+Disposal) •Projects involving greater than UNIT SQ FT 0 0 IFFR R 1 Dishwasher 50%hardscape area and work LOT SIZE ID Tenant Finish 2 Laundry Bar,Utility Sink affecting 50%or greater of unit (SQFT) 4132 Will there be 0 Demolition 1 Clothes Washer sq ft 503FTOFSOIL 50 any roof/wall ❑ Change Order _Floor Sink •Projects involving 1,000+sq ft of DI TURBANCE penetrations? 0 9 Floor Drain soil disturbance area I] Yes i Water Heater(Pan Req) NEW SQ FT 50 0 No 4 #Gas Outlets Water Efficient Landscaping Water Treatment •Projects that trigger a major BUILDING 1019 Other engineering review FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior or construction authorized is not commenced within affecting 50%or more HARDSCAPE n/a 180 days,or if construction or work is suspended or alterations e ngross square footage AREA abandoned for a period of 180 days at any time after g q g ZONE R6 work is commenced. DISTRICT Project Valuation:Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit. H Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved w Building Footprint:Grade floor square footage of the permitted structure. PC x PL 5.6.19 0 Hardscape Area:Square footage of impervious lot surface. Zone District:Underlying zone district of permitted parcel. Zoning x BN 6.28.19 HPC Building x TF 8.22.19 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire x TF 8/22/19 Building 19 147.64 Building 29 457.90 Parks Impact 0 Engineering x JD 6/19/19 Review Permit Fee CMP x CK 8.21.19 Engineering 17703.21 Zoning 27827.98 School Lands 0 Water x SW 8.7.19 Review Review(50%) Dedication Stormwater Zoning 2,827 98 CMP(50%) 1 ,952 22 TDM Impact 0 Sanitation x Cs 6.20.19 Review(50%) Energy Code REMP Pedestrian Env. Health Review 4,418.69 Payment Amenity 0 Parks x Dr 8/21/19 CMP(50%) 1,952.22 GIS 500.00 Housing Cash in Lieu 0 Landscape Parks Review 123.96 City Use 15 003.03 Water Tap Efficiency Tax Approved _AM / /`1;T,_• Utility Review County Use To Issue x I ;, / I; ; "" • t, 630.00 Tax 3,822.15 Sanitation Issuance WI ( CITY OF ASPEN January2019 130 S. GALENA ST I ASPEN, CO i6111 a 536 Walnut Street ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET THE CI FY OF ASPEN • FOR PLAN REVIEW QUESTIONS Name Delvon Nemechek Phone ', - E-mail • V• •7 •W , i i •U•" • • " FOR INSPECTION QUESTIONS Name Ben Allen/I.A.Sedgwick inc. Phone 1' g E-mail • 41.TY r •► • ••. • OWNER •Name Phone �' �' , Cell Phone �' • '� Maili 1017 N Roxbury Dr City Beverly Hills State CA ZIP 90210 Address E-mail Address lesbider@gmail.com OWNER'S AUTHORIZED AGENT Name Delvon Nemechek Phone v' • Cell Phone �' Mailing 500 W. Main St. Aspen CO 81611 Address City State ZIP E-mail Address alison.agley@rowlandbroughton.com APPLICATION BEST CONTACT Name Delvon Nemechek Phone U. • Cell Phone �' Mailing 500 W. Main St. Aspen CO 81611 Address City State ZIP E-mail Address delvon@rowlandbroughton.com ARCHITECT OR DESIGNER OF RECORD 11. Name Sarah Broughton/Delvon Nemechek Phone • U. , , ...le •',• Cell Phone • , • Mailing 500 W. Main St. Aspen CO 81611 Address City State ZIP E-mail Address delvon@rowlandbroughton.com CIVIL ENGINEER OF RECORD Name Phone Cell Phone Mailing Address City State ZIP E-mail Address STRUCTUAL ENGINEER OF RECORD Name Evolve Engineering Phone •' �' •• Cell Phone •' �' I. Mailing 1040 Main Street Carbondale CO 81623 Address City State ZIP E-mail Address steve@evolvestruct.com GENERAL CONTRACTOR Name I.A.Sedgwick Inc. Phone • g • •g Cell Phone • g •A • •g Mailing Address PO Box 10251 City Aspen State CO ZIP 81612 E-mail Address beniasedgwick@yahoo.corn INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Contractor 01/06/2019 Signature Date aJVE D ❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/b I� Ing a I (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file 0 0119 ( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO1816�11j /�vl L_I4 BUILDING DEPARTMENT ADDRESS: 536 Walnut St. PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST THECnorASPL, LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? ElPart of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District • Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high non-unit space water mark ❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure ❑ Work involves exterior of structure ❑ Changes to elevator or stair configuration ElChanging the number of residential units Changes to the use of existing structure or space ❑ Changes to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? • Exterior lighting added or changed ❑ Work involves exterior wall penetrations ElWork involves roof penetrations ❑ Work involves digging or excavation Work adds, removes, or changes ❑ Work involves restaurant or food service plumbing fixtures ElDisturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys 12 months ❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines ❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries dripline of a tree • RECEIVE 1,9 ( CITY OF ASPEN _August130 S. GALENA ST I ASPEN, CO/81611J BUILDING DEPARTMENT PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC THEC,rYOPASPEN BUILDING CODE INFORMATION ❑■ 2015 IRC ❑ 2015 IBC 0 2015 IEBC 0 Other (Please Explain) Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted and Amended) Fire Sprinkler System I Existing? 0 No I Required? 0 No I Type 0 NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D Type Of Construction ❑ VA ■❑ VB❑ IV 0 IIIA ❑ IIIB ❑ IIA ❑ IIB 0 IA 0 IB Fire Alarms Installed ■❑ Yes No Required Special Inspections ❑ High-Strength Bolting 0 Epoxy Anchors ■❑ Structual Steel Welding ❑ Permanent Micropiles 0 Sprayed Fire-Resistants ❑ Other Energy Code Compliance ❑■ Prescriptive Table ❑ Other ❑ RESCheck UA Alternative ❑ COMCheck UA Alternative Exterior Energy Use Total Approved On-Site Snowmelt Spa 64 existing Pool (Existing + New) Building Type/ I ❑ A ❑ B ❑ F ❑ E ❑ R_ I ❑■ One Family ❑ Two Family Occupancy Group g ❑ B (A<50) ❑ H_ ❑M ❑ S_ R C ❑ I ❑ U C ❑ Townhouse UNIT DESCRIPTION AS PROPOSED Gross Area of Building: 3957 Gross Area of Unit: ADU BUILDING DESCRIPTION Occupant Load: Is there an ADU? 0 Yes ■❑ No # Stories Above Grade 2 # Stories Below Grade 1 # Living Rooms Attached Garage Detached Garage Carport # Kitchens Parking Spaces a Parking Spaces Parking Spaces # Full Baths # Bedrooms 4 # Full Baths 2 Deck Area 294 # 3/4 Baths # 1/2 Baths # 3/4 Baths 2 # 1/2 Baths 1 # Bedrooms # Kitchens 1 #Wood Fireplaces ° #Other Rooms (List) # Gas Appliances 3 # Gas Logs° BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement laundry,mechanical,storage,3 bedrooms,3 full baths,family room with fireplace Main Level garage,office,entry,mudroom,master bedroom and bath 2nd Floor kitchen,dining,powder room,living room,2 decks 3rd Floor Additional RECFIrEP Reviewed By: TF Date:8/8/2019 04( CITY OF ASPEN January2018 130 S. GALENA ST I ASPEN, CO/81611 J BUILDING DEPARTMENT ADDRESS: 536 Walnut St. PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ,`;►►. VALUATION AFFIDAVIT p� CITY OF ASPEN • AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: Date: Owner Printed Name: or, Authorized Agent Signature: Date:4/10/19 Authorized Agent Printed Name: Delvon Nemechek RECEIVE 1,9 ( CITY OF ASPENJanuary2019 130 S. GALENA ST I ASPEN, CO 81611J �_l 1 y I BUILDING DEPARTMENT ADDRESS: 536 Walnut St. PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST THE Cif Y OF ASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST 1 Yes❑ No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes❑ No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and complete. Owner Les & Lynn Bider Phone #(310) 998-7248 Applicant (print name) Delvon Nemechek Phone #(970) 544-9006 Applicant Signature Date 4/9/19 //��►►C` Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you h FIVE %' Et about asbestos, interpreting your test results, or other matters. 0419 ( CITY OF ASPENAugust2ol7 130 S. GALENA ST I ASPEN, CO�81611j l ADDRESS: 536Wa see PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THE Cif Y OF ASPEN Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed measurement. Additional roof plans showing location of measurements may be necessary. CITY OF ASPEN August2o17 130 S19 . GALENA ST I ASPEN, CO/81611j l 1 PERMIT NUMBER: ADDRESS: 536 Walnut Street COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY THECMCTASPL, 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) Ben Allen understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: Date: 01 /06/2019 RECEIVE 10 ( CITY OF ASPENAugust2o17 130 S. GALENA ST I ASPEN, CO/81611j _i L_IH BUILDING DEPARTMENT