Loading...
HomeMy WebLinkAboutFile Documents.200 S Aspen St.0007.2017 (11).ACBKZoning Markup Summary Plan Set.2017.01 4-11-2017 Page: Z-001 Author: claudes Date: 4/11/2017 10:00:53 AM File Name: Plan Set.2017.01.pdf Zoning comment : General Comments Zoning Compliance Verification Policy will be required. The following sheets will be part of the verification process: Sheet Z-201, Z-202, Z-203, Z-204 Heights, Z-205 Height over Topography, Z-008 Setbacks/Projections and A-001 Proposed Site Plan, ZEO (zoning enforcement officer) to calculate impact fee and verify Section 3 of Planning & Zoning Commission Resolution No. 9, (Series of 2017) Section 3: Affordable Housing Affordable housing mitigation was calculated and outlined in P&Z Resolution No. 20 (Series of 15). Due to potential minor changes to the interior layout of the project,. the mitigation requirements shall be confirmed at building permit application. Plan Set.2017.01.pdf (22) Land Value Summary Actual Land $4,500, Improvements $2,133, Total $6,633, Allowable Floor Area Unique Approvals Variances Exemptions n/a See She n/a Concep City Cou Final Co P&Z Final Commercial Design Review - Conditio 200 S Aspen Section 3: Affordable Housing Section 6: Representations Preserved Section 7: Vested Rights All material representations and commitme Applicant shall provide site protection and Section 4: Building Permit Submission Requirements Applicant shall provide a copy of the two P A letter from the primary contractor stating Development approvals granted herein sha Civil Engineering that is compliant with all s Section 5: Building Permit Issuance Requirements Applicant shall pay all impact fees and sch Applicant shall provide sufficient evidence Section 2: Plan Set and Development Agreement Owners shall prepare, execute and record a Must be approved by the Community Devel No building permit submission shall be per Mitigation requirements shall be confirmed All approved Transportation Mitigation Req Conditions per Resolution No. 9 (Series 2016) Minor changes to the floor plans to meet di Final Landscaping to be approved at buildin Final Landscaping to be approved at buildin Section 1: Approvals Zoning comment : General Comments Zoning Compliance Verification Policy will be required. The following sheets will be part of the verification process: Sheet Z-201, Z-202, Z-203, Z-204 Heights, Z-205 Height over Topography, Z-008 Setbacks/Projections and A-001 Proposed Site Plan, ZEO (zoning enforcement officer) to calculate impact fee and verify Section 3 of Planning & Zoning Commission Resolution No. 9, (Series of 2017) Section 3: Affordable Housing Affordable housing mitigation was calculated and outlined in P&Z Resolution No. 20 (Series of 15). Due to potential minor changes to the interior layout of the project,. the mitigation requirements shall be confirmed at building permit application. Comment Responses from Forum Phi April 24, 2017 Zoning Compliance Verification Policy form was signed and submitted with Permit. Affordable Housing Mitigation Requirements have been updated and added to Sheet Z-001. City of Aspen Received 4/24/17 Building Department Page: Z-001 Author: claudes Date: 4/10/2017 1:53:26 PM File Name: Plan Set.2017.01.pdf Zoning comment: 1. Please verify the financial requirements have been funded Development Agreement for the Hotel Lenado Article IV, Financial Assurances and Performance Bonds 4.1 Financial Assurance and Letters of Credit 4.2 Site Protection Guarantee 4.3 Site Enhancement Guarantee 4.4 Landscape Guarantee 4.5 Public Facilities and Infrastructure Guarantee 2. Planning & Zoning Commission Resolution No. 9, (Series of 2017), Section 4: Please verify a -d have been submitted with the permit: Section 4: Building Permit Submission Requirements In addition to the standard submission requirements for a building permit, the Applicant shall submit the following: a. A signed copy of the two Planning and Zoning resolutions and the Development Agreement granting land use approvals. b. A letter from the primary contractor stating that the resolutions and the Development Agreement have been read and understood. c. Civil engineering for the project that is compliant with all sections of the City of Aspen Municipal Code, Title 21, Urban Runoff Management plan, and all construction and excavation standards published by the Engineering Department. d. All approved Transportation Mitigation Requirements shall be included as part of the building permit application. 3. Please provide existing floor area calculation of the existing lodge and AH units for the purposes of impact fee calculations pursuant Planning & Zoning Commission Resolution No. 9, (Series of 2017), Section 5. Section 5: Building Permit Issuance Requirements In addition to the standard requirements for issuance of a building permit, the following conditions must be met prior to issuance of a building permit: a. The Applicant shall pay all impact fees and school lands dedication fees applicable and per the fee schedule in place at the time of building permit submission, payable upon issuance of the full building permit. b. The Applicant shall provide sufficient evidence of financing and any required performance guarantees, as required in Section 2. c. The Applicant shall provide site protection and enhancement escrow funds, as required in Section 2. 4. Please provide Public Amenity Space pursuant Planning and Zoning Commission Resolution No. 20 (Series of 2015), Section 10: Public Amenity Spaces The Applicant has committed to providing 2,215.5 sq ft of ground floor public amenity spaces. These spaces shall be permanently accessible by the public. Zoning Allowance & Project Summary 200 S. Aspen Street Proposed Development Lodge | Full Replacement Parcel #273707337001 Zone District Mixed Use (MU) & Lodge Preserva Project Summary Replace Existing Lodge Setbacks Existing Allowe Front 10'10' Rear 5'5' Side 5'5' Distance between Buildings n/a 10' Corner Lot yes Land Value Summary Actual Value Land $4,500,000 Improvements $2,133,600 Total $6,633,600 Allowable Floor Area Unique Approvals Variances Exemptions Affordable Housing Unit Credits req Public Amenity Space increased fro Nine Parking Spaces Required / Ei Nine Proposed Lodge Units Two Proposed Free Market Units Two Proposed On-Site Affordable H See Sheets Z-006 through Z-012 n/a Conceptual Commercial Design Re City Council Approval per Resolutio Final Commercial Design Review A Zoning comment: 1. Please verify the financial requirements have been funded Development Agreement for the Hotel Lenado Article IV, Financial Assurances and Performance Bonds 4.1 Financial Assurance and Letters of Credit 4.2 Site Protection Guarantee 4.3 Site Enhancement Guarantee 4.4 Landscape Guarantee 4.5 Public Facilities and Infrastructure Guarantee 2. Planning & Zoning Commission Resolution No. 9, (Series of 2017), Section 4: Please verify a -d have been submitted with the permit: Section 4: Building Permit Submission Requirements In addition to the standard submission requirements for a building permit, the Applicant shall submit the following: a. A signed copy of the two Planning and Zoning resolutions and the Development Agreement granting land use approvals. b. A letter from the primary contractor stating that the resolutions and the Development Agreement have been read and understood. c. Civil engineering for the project that is compliant with all sections of the City of Aspen Municipal Code, Title 21, Urban Runoff Management plan, and all construction and excavation standards published by the Engineering Department. d. All approved Transportation Mitigation Requirements shall be included as part of the building permit application. 3. Please provide existing floor area calculation of the existing lodge and AH units for the purposes of impact fee calculations pursuant Planning & Zoning Commission Resolution No. 9, (Series of 2017), Section 5. Section 5: Building Permit Issuance Requirements In addition to the standard requirements for issuance of a building permit, the following conditions must be met prior to issuance of a building permit: a. The Applicant shall pay all impact fees and school lands dedication fees applicable and per the fee schedule in place at the time of building permit submission, payable upon issuance of the full building permit. b. The Applicant shall provide sufficient evidence of financing and any required performance guarantees, as required in Section 2. c. The Applicant shall provide site protection and enhancement escrow funds, as required in Section 2. 4. Please provide Public Amenity Space pursuant Planning and Zoning Commission Resolution No. 20 (Series of 2015), Section 10: Public Amenity Spaces The Applicant has committed to providing 2,215.5 sq ft of ground floor public amenity spaces. These spaces shall be permanently accessible by the public. Financial requirements have been provided and are being reviewed by the City Attorney. Signed Copy of the two Resolutions were provided with the Permit submission. A signed letter from the contractor was provided with the Permit submission. Civil Engineering, compliant with Title 21, was provided with the Permit submission. Transportation Mitigation was provided with the Permit Submission. Existing Gross and Floor Area calcs have been added to the Z Set. - These are shown on Sheet Z-112 through Z-115. City of Aspen Received 4/24/17 Building Department Page: Z-009 Author: claudes Date: 4/10/2017 4:29:16 PM File Name: Plan Set.2017.01.pdf Provide all stair detail, same level of detail as provided for the Architectural sheets. Provide square footage of stair, every stair, every exemption Page: Z-009 Author: claudes Date: 4/10/2017 4:28:04 PM File Name: Plan Set.2017.01.pdf Gross Area has no exceptions for shafts; please amend the square footage and all associated charts. Section 26.104.100.Definitions. Gross floor area. For the purposes of calculating non-unit space, gross floor area is the total floor area considering all inclusions and exclusions as calculated herein plus gross area of all subgrade levels measured from interior wall to interior wall. Page: Z-010 Author: claudes Date: 4/11/2017 9:35:14 AM File Name: Plan Set.2017.01.pdf Zoning The area in front of the "game Lounge Bar" room 203 shall be non-unit, please amend 1,577.75 sq ft 2,076.00 sq ft 1,027.50 sq 1,111.50 sq ft FRONT SETBACK FRONT PROPERTY LINE MAIN ENTRY101 LODGE 1 BED104 LODGE 2 BED106 LODGE 1 BATH105 LODGE 2 BATH107 LODGE 11 LODGE 3 BED108 LODGE 4 BED110 HOUSEKEEPIN112 AH 1 HALL & STAIRS117 AH 1 BATH121 LIBRARY116 HALL 1115 AH 1 BED 1118 AH 1 BED 2119 STAIR 1113 STAIR 2103 ELEV114 MECH MECH MECH M WATER CLOSET WATER CLOSETWATER CLOSETWATER CLOSET STORAGE WATER CLOSET MECH MECH WATER CLOSET LODGE 7 BATH134 LODGE 3 BATH109 LODGE 6 BED131 LODGE 6 BATH132 LODGE 7 BED133 OPEN OPENTOBELOW OPENTOBELOW OPEN OPENTOBELOW MGMNT VALET102 CLOSET Lodge AHU Free Market Non-Unit 782.75 ------178.50 4,284.25 549.00 ------------------ 1,331.75 0.00 178.50 4,284.25 LOWER LEVEL Provide all stair detail, same level of detail as provided for the Architectural sheets. Provide square footage of stair, every stair, every exemption FRONT SETBACK FRONT PROPERTY LINE STAIR 2003 WATER/FIRE004 1,577.75 sq ft 2,076.00 sq ft 1,027.50 sq ft 1,111.50 sq ft 223.75 sq ft FRONT SETBACK FRONT PROPERTY LINE MAIN ENTRY101 LODGE 1 BED104 LODGE 2 BED106 LODGE 1 BATH105 LODGE 2 BATH107 LODGE 4 BATH111 LODGE 3 BED108 LODGE 4 BED110 HOUSEKEEPING 1112 AH 1 HALL & STAIRS117 AH 1 BATH121 AH 2 HALL & STAIRS122 LIBRARY116 AH 2 STORAGE 2127 HALL 1115 AH 1 BED 1118 AH 1 BED 2119 AH 1LAUNDRY120 AH 2 BED 1123 STAIR 1113 STAIR 2103 CAR LIFT128 ELEV114 MECH MECH MECH MECH WATER CLOSET WATER CLOSETWATER CLOSETWATER CLOSET STORAGE MECH CLOSET WATER CLOSET ACCESSIBLE LODGE 5 BED129 WATER CLOSET MECH MECH WATER CLOSET LODGE 7 BATH134 LODGE 3 BATH109 LODGE 6 BED131 LODGE 6 BATH132 LODGE 7 BED133 OPEN OPENTOBELOW OPENTOBELOW OPEN OPEN OPENTOBELOW OPEN TOBELOW OPENTOBELOW MGMNT VALET102 CLOSET CLOSET CLOSET AHU Free Market Non-Unit ------178.50 4,284.25 ------------------ 0.00 178.50 4,284.25 AHU Free Market Non-Unit 027.50 ------1,111.50 ------------223.75 027.50 0.00 1,335.25 AHU Free Market Non-Unit 056.75 148.75 1,104.00 ------------233.75 ------------------ 056.75 148.75 1,337.75 N LEVEL ER LEVEL K LEVEL Gross Area has no exceptions for shafts; please amend the square footage and all associated charts. Section 26.104.100.Definitions. Gross floor area. For the purposes of calculating non-unit space, gross floor area is the total floor area considering all inclusions and exclusions as calculated herein plus gross area of all subgrade levels measured from interior wall to interior wall. 2,615.25 sq ft 1,104.00 sq ft ETBACK ROPERTY LINE DECK AH 1 DECK LODGE 8 BED201 HALL 2 205 ELEV206 WATER CLOSET WATER CLOSET WATER CLOSET LODGE 8 BATH 202 GAME LOUNGE / BAR RR204 GAME LOUNGE/ BAR 203 STAIR 1 PARK ENTRY 207 OPEN OPEN OPEN TOBELOW Zoning The area in front of the "game Lounge Bar" room 203 shall be non-unit, please amend Stair Detail has been added. Gross Area has been updated. This area has been updated. City of Aspen Received 4/24/17 Building Department Page: Z-010 Author: claudes Date: 4/11/2017 9:34:54 AM File Name: Plan Set.2017.01.pdf Zoning Comment Provide all stair detail, same level of detail as provided for the Architectural sheets. A -104 illustrates a door in this stair tower. Verify the following: 1.Is the door in the stair tower permitted by the IBC? if permitted by the IBC: half the stair tower will be non-unit attributed to the residential use; and allocated accordingly. see 26.575.020(D)(14) 14.Allocation of Non-Unit Space in a mixed-use building "Garages, including subgrade garages, and carports in mixed use buildings that contain residential units are considered non-unit space. When a feature is used exclusively by one use, the space shall be attributed to the floor area for that use. " Page: Z-010 Author: claudes Date: 4/11/2017 9:30:48 AM File Name: Plan Set.2017.01.pdf Zoning Comment Please amend the 436 Square feet of free market non-unit to allocate to the Free Market Use. see 26.575.020(D)(14) 14.Allocation of Non-Unit Space in a mixed-use building "Garages, including subgrade garages, and carports in mixed use buildings that contain residential units are considered non-unit space. When a feature is used exclusively by one use, the space shall be attributed to the floor area for that use. " Page: Z-013 Author: claudes Date: 4/9/2017 5:09:44 PM File Name: Plan Set.2017.01.pdf Zoning comment: The fill pattern shall be amended for the proposed lower level. Please keep the square footage numbers, and change fill pattern to 'Exempt', gray. 2,615.25 sq ft 1,056.75 sq ft 1,104.00 sq ft FRONT SETBACK FRONT PROPERTY LINE DECK AH 1 LIVING / KITCHEN209 AH 1STORAGE210 DECK LODGE 8 BED201 HALL 2205 ELEV206 WATER CLOSET WATER CLOSET WATER CLOSET WATER CLOSET DECK LODGE 8 BATH202 GAME LOUNGE / BAR RR204 GAME LOUNGE/ BAR203 STAIR 1208 LODGE 9 BED222 LODGE 9 BATH223 PARK ENTRY207 OPEN OPENTOBELOW OPENTOBELOW OPEN OPENTOBELOW OPEN TOBELOW SKI STORAGE221 GROSS FLOOR AREA (LAND USE CODE) For the purposes of calculating non-unitspace, gross floor area is the total floorarea considering all inclusions andexclusions as calculated herein plus grossarea of all subgrade levels measured frominterior wall to interior wall. NON-UNIT GROSS AREA PLAN LEGEND DECK EXEMPT AFFORDABLE HOUSING LODGE FREE MARKET FLOOR AREA (LAND USE CODE) The sum total of the gross horizontal areasof each story of the building measuredfrom the exterior walls of the building.(See, Supplementary Regulations —Section 26.575.020, Calculations andmeasurements). 436.75 sq ft HALL 3307 RESIDENCE 2 KITCHEN310 DINING RESIDENCE 1 BATH305 RESIDENCE 1 SITTING304 DECK STAIR 1309 ELEV308 RESIDENCE 1 ENTRY302 SHOWER DECK WATER CLOSET WATER CLOSET RESIDENCE 1 BEDROOM303 OPENTOBELOW OPENTOBELOW OPENTOBELOW OPEN OPEN CHEN SIDENCE 2 BAR317 DRAWING SETS: NAME PERMIT SUBMITTAL ID ISSUED DATE - STEVENWILSON402127 STAT E OF COLOR A DO LI C ENSED ARCHITECT STRUCTURAL CONSULTANTS SURVEYOR MECHANICAL CONTRACTOR CIVIL INTERIOR DESIGNER 200 South Aspen Aspen CO81611 200 S Aspen 715 West Main Street, Suite 204Aspen, Colorado 81611P: 970.279.4157 F: 866.770.5585 1/26/17 Tuttle Surveying727 Blake AveGlenwood Springs, CO 81601(970) 928-9708jeff@tss-us.com Roaring Fork Engineering0123 Emma Road, Suite 200bBasalt, CO 81621(970) 948-7474richardg@rfeng.biz Architectural Engineering Consultants40801 US-6 #214Avon, CO 81620(970) 748-8520taylor@aec-vail.com Madigan + CompanyPO Box 9682Aspen, CO 81612(970) 319-2232chris@madiganco.co KL&A215 N. 12th Street, Unit ECarbondale, CO 81623(970) 927-5174mlyons@klaa.com dg+a interiors5401 N Central Expressway, Suite 305Dallas, TX 75205(214) 522-6716, Ext 12donna@dgainteriors.com 1/26/17 Zoning Comment Provide all stair detail, same level of detail as provided for the Architectural sheets. A -104 illustrates a door in this stair tower. Verify the following: 1.Is the door in the stair towerpermitted by the IBC? if permitted by the IBC: half the stair tower will be non-unit attributed to the residential use; and allocated accordingly. see 26.575.020(D)(14) 14.Allocation of Non-Unit Space in a mixed-use building "Garages, including subgrade garages, and carports in mixed use buildings that contain residential units are considered non-unit space. When a feature is used exclusively by one use, the space shall be attributed to the floor area for that use. " 3,599.25 sq ft 436.75 sq ft DECK FRONT SETBACK FRONT PROPERTY LINE DECK HALL 3307 RESIDENCE 1 DINING306 RESIDENCE 1 BATH 305 RESIDENCE 1 SITTING304 STAIR 1309 ELEV308 RESIDENCE 1 ENTRY302 SHOWER WATER CLOSET WATER CLOSET RESIDENCE 1 BEDROOM303 OPENTOBELOW OPENTOBELOW OPENTOBELOW OPEN RESIDENCE 1 LIVING/KITCHEN301 Zoning Comment Please amend the 436 Square feet of free market non-unit to allocate to the Free Market Use. see 26.575.020(D)(14) 14.Allocation of Non-Unit Space in a mixed-use building "Garages, including subgrade garages, and carports in mixed use buildings that contain residential units are considered non-unit space. When a feature is used exclusively by one use, the space shall be attributed to the floor area for that use. " 878.50 sq ftEMPLOYEE RR 008MECHANICAL 1 EMPLOYEE LOUNGE The sum total of the gross horiz of each story of the building me from the exterior walls of the bu (See, Supplementary Regulatio Section 26.575.020, Calculatio measurements). wed Garage Exemption wer Level n Level k Level age Exemption 1,000 SF 277.75 238.75 483.50 1,000 SF Zoning comment: The fill pattern shall be amended for the proposed lower level. Please keep the square footage numbers, and change fill pattern to 'Exempt', gray. Stair Detail has been added. Fire separation door is required by the IBC. There is no internal separation within the stair well restricting access to the upper floors. The hallway has been added to free market floor area. This has been updated. City of Aspen Received 4/24/17 Building Department Page: Z-013 Author: claudes Date: 4/11/2017 9:41:02 AM File Name: Plan Set.2017.01.pdf Zoning Comment Provide calculations in this order 1. Provide Gross Floor area; no deductions, sheets Z-009-011 amend them to get accurate gross numbers, see previous note. 2. Provide % of Gross Floor Area based on Use, update due to changes in Gross 3. General floor area exemptions are applied prior to the sub grade exemption. Please provide clear stair detail complete with square footage numbers. 4. sub grade exemptions applied. 5. allocate non-unit 6. provide floor area totals Page: Z-013 Author: claudes Date: 4/9/2017 5:10:37 PM File Name: Plan Set.2017.01.pdf Page: Z-014 Author: claudes Date: 4/9/2017 5:22:05 PM File Name: Plan Set.2017.01.pdf Zoning comment: Amend fill pattern, this garage area is exempt Page: Z-014 Author: claudes Date: 4/9/2017 5:19:33 PM File Name: Plan Set.2017.01.pdf Zoning Comment: There is no exemptions for chase in the calculation of Floor Area. Please amend the plans and chart totals. 1,628.50 sq ft FRONT SETBACK FRONT PROPERTY LINE LODGE 1 BED 104 LODGE 2 BED 106 LODGE 3 BED 108 LODGE 4 B 110STAIR 2103 OPEN OPENTOBELOW NON-UNIT DECK EXEMPT AFFORDABLE HOUSING LODGE FREE MARKET Zoning Comment Provide calculations in this order 1. Provide Gross Floor area; no deductions, sheets Z-009-011 amend them to get accurate gross numbers, see previous note. 2. Provide % of Gross Floor Area based on Use, update due to changes in Gross 3. General floor area exemptions are applied prior to the sub grade exemption. Please provide clear stair detail complete with square footage numbers. 4. sub grade exemptions applied. 5. allocate non-unit 6. provide floor area totals 4,300.25 sq ft 617.25 sq ft 878.50 sq ft 218.50 sq ft 277.75 sq ft * FRONT SETBACK FRONT PROPERTY LINE MECHANICAL 2016 STAIR 2003 EMPLOYEE RR008 PREP AREA009 MECHANICAL 1005 ELEV MACHINEROOM011 UNIT 302STORAGE015 WATER/FIRE004 ELEV012 UNIT 301STORAGE014 CAR LIFT017 LOBBY 2002 PARKING GARAGE018 LOBBY 1001 LODGESTORAGE006 EMPLOYEE LOUNGE007 LAUNDRY010 STAIR 1013 q ft 1,127.00 sq ft 5 sq ft* sq ft DGE 2 BATH107 LODGE 4 BATH111 LODGE 3 BED108 LODGE 4 BED110 HOUSEKEEPING 1112 AH 1 HALL & STAIRS117 AH 1 BATH121 AH 2 HALL & STAIRS122 AH 2 BATH126 ARY6 AH 2 STORAGE 2127 AH 1 BED 1118 AH 1 BED 2119 AH 1LAUNDRY120 AH 2 BED 1123 AH 2 BED 2124AH 2LAUNDRY125 STAIR 1113 LIFT28 ELEV114 MECH MECH MECH WATER CLOSET WATER CLOSETCLOSET STORAGE LODGE 3 BATH109 OPENTOBELOW OPENTOBELOW OPEN ENOOW CLOSET CLOSET CLOSET CLOSET EXEMPT (See, Supplementary Regulations —Section 26.575.020, Calculations andmeasurements). feature shall not be counted as Floor Areaon the top-most interior level served by theelement. Main LevelPark LevelGarage Exemption 238.75483.501,000 SF N PROPOSED LOWER LEVEL FLOOR AREA 1/8" = 1'-0"R AREA 1/8" = 1'-0" 4 8 161 DRAWING SETS: NAME PERMIT SUBMITTAL ID ISSUED DATE - STEVENWILSON402127 STAT E OF COLOR A DO LI C ENSED ARCHITECT STRUCTURAL CONSULTANTS SURVEYOR MECHANICAL COPYRIGHT CONTRACTOR CIVIL INTERIOR DESIGNER PROJECT NO: DRAWN BY:LG, CF, ES FORUM PHI LLC PARCEL ID # 273707337001 LEGAL DESCRIPTION 1/26/17 CITY AND TOWNSITE OF ASPEN Block: 75 Lot: A AND:Lot: Thru C ZONE DISTRICT Mixed Use 1404 DATE OF PUBLICATION Z-013 FLOOR AREA CALCULATIONS Tuttle Surveying727 Blake AveGlenwood Springs, CO 81601(970) 928-9708jeff@tss-us.com Roaring Fork Engineering0123 Emma Road, Suite 200bBasalt, CO 81621(970) 948-7474richardg@rfeng.biz Architectural Engineering Consultants40801 US-6 #214Avon, CO 81620(970) 748-8520taylor@aec-vail.com Madigan + CompanyPO Box 9682Aspen, CO 81612(970) 319-2232chris@madiganco.co KL&A215 N. 12th Street, Unit ECarbondale, CO 81623(970) 927-5174mlyons@klaa.com 1/26/17 dg+a interiors5401 N Central Expressway, Suite 305Dallas, TX 75205(214) 522-6716, Ext 12donna@dgainteriors.com 1/26/17 250.00 sq ft * 35.25 sq ft 64.50 sq ft143.50 sq ft 223.75 sq ft 233.50 sq ft * GARAGE 217 CAR LIFT 216 AH 1 POWDER 211 AH 2 LIVIN STORAGE 218 STAIR 3 219 OPENTOBELOW OPENTOBELOW OPEN TOBELOW HOUSEKEEPING 2 220 PROPOSED PARK LEVEL FLOOR AREA 1/8" = 1'-0" Zoning comment: Amend fill pattern, this garage area is exempt 250.00 sq ft * 35.25 sq ft 64.50 sq ft143.50 sq ft 223.75 sq ft 2 GARAGE 217 A STORAGE 218 STAIR 3219 OPEN TOBELOW HOUSEKEEPING 2 220 DECK TING PROPOSED PARK LEVEL FLOOR AREA1/8" = 1'-0" Zoning Comment: There is no exemptions for chase in the calculation of Floor Area. Please amend the plans and chart totals. A Summary of calculations in this order has been provided on Sheet Z-001. This has been updated. This has been updated. City of Aspen Received 4/24/17 Building Department Page: Z-014 Author: claudes Date: 4/9/2017 5:23:25 PM File Name: Plan Set.2017.01.pdf Zoning comment: Please explain the 35.25 square feet?? Page: Z-014 Author: claudes Date: 4/9/2017 5:18:23 PM File Name: Plan Set.2017.01.pdf Zoning Comment: As previously noted, the fill pattern and floor area shall be non unit in front of game room. Page: Z-014 Author: claudes Date: 4/11/2017 9:42:17 AM File Name: Plan Set.2017.01.pdf Zoning Comment: 448 Square feet, fill pattern correct; allocation shall be amended. Page: Z-015 Author: claudes Date: 4/11/2017 9:36:31 AM File Name: Plan Set.2017.01.pdf Zoning comment: Provide stair detail, please add square footage too Page: Z-016 Author: claudes Date: 4/9/2017 5:44:00 PM File Name: Plan Set.2017.01.pdf Zoning comment: Chart needs to only proof the net livable of the Affordable housing and the Free Market. Please amend as necessary. the AH does not illustrate any chases in the spaces; is that correct? 250.00 sq ft * 226.50 sq ft 35.25 sq ft 64.50 sq ft0 sq ft ft 233.50 sq ft * GARAGE 217 CAR LIFT 216 TRASH ENCLOSURE 215 AH 1 POWDER 211 AH 2 LIVING / KITCHEN 212 AH 2 POWDER213 OPENTOBELOW OPENTOBELOW OPENTO BELOW OPEN AH 2 STORAGE214HOUSEKEEPING 2 220 ROPOSED PARK LEVEL FLOOR AREA 1/8" = 1'-0" 4 8 161 Zoning comment: Please explain the 35.25 square feet?? 819.00 sq ft 2,560.75 sq ft FRONT SETBACK FRONT PROPERTY LINE DECK AH 1 STORAGE DECK LODGE 8 BED201 HALL 2 205 ELEV206 WATER CLOSET WATER CLOSET WATER CLOSET DECK LODGE 8 BATH202 GAME LOUNGE / BAR RR204 GAME LOUNGE/ BAR203 STAIR 1208 PARK ENTRY 207 OPEN OPENTOOPENTO OPEN OPEN TOBELOW from the exterior walls of the building. (See, Supplementary Regulations — Section 26.575.020, Calculations and measurements). at the area of the counted as Floor Area rior level served by the Lower Level Main Level Park Level Garage Exemption 277.75 238.75 483.50 1,000 SF Zoning Comment: As previously noted, the fill pattern and floor area shall be non unit in front of game room. FRONT SE FRONT PR L DECK STA2 448.00 sq ft 3,533.00 sq ft DECK FRONT SETBACK FRONT PROPERTY LINE RESIDENCE 2 BATH315 DECK HALL 3307 RESIDENCE 2 KITCHEN310 RESIDENCE 1 DINING306 RESIDENCE 1 BATH305 RESIDENCE 1 SITTING304 DECK RESIDENCE 2 DINING RESIDENCE 2 CLOSET316 STAIR 1309 STAIR 3 ELEV308 RESIDENCE 1 ENTRY302 SHOWER DECK WATER CLOSET WATER CLOSET RESIDENCE 1 BEDROOM303 OPENTOBELOW OPENTOBELOW OPENTOBELOW OPEN OPEN OPENTO RESIDENCE 1 LIVING/KITCHEN301 RESIDENCE 2 BAR317 DECK EXEMPT FREE MARKET e Market Non-Unit 218.50 3,828.00 -------277.75 218.50 -3,550.25 0.00 0.00 e Market Non-Unit ------1,337.50 -------238.75 -------856.43 0.00 242.32 e Market Non-Unit 143.50 1,564.25 -------483.50 143.50 1,080.75 e Market Non-Unit 533.00 448.00 533.00 448.00 e Market Non-Unit ------57.75 0.00 57.75 EL CAR ELEVATOR EXEMPTION PCHAPTER 26.575.020.D When a stairway or elevator connect multiple levels, the area of the featurshall be counted on all levels as if it wsolid floor except that the area of thefeature shall not be counted as Floor on the top-most interior level served element.Zoning Comment: 448 Square feet, fill pattern correct; allocation shall be amended. 57.75 sq ft STAIR 1 402 DECK 406 MECH 407 ELEV 401 OPEN TOBELOW OPEN TOBELOW ST C SU M CO CI IN Tu 72 Gl (97 jef Ro 01 Ba (97 ric Ar 40 Av (97 tay Ma PO As (97 ch KL 21 Ca (97 ml dg 54 Zoning comment: Provide stair detail, please add square footage too 316.00 sq ft 364.25 sq ft351.00 sq ft FRONT SETBACK FRONT PROPERTY LINE LODGE 1 BED104 LODGE 2 BED106 LODGE 3 BED108STAIR 2 103 OPENTOBELOW Zoning comment: Chart needs to only proof the net livable of the Affordable housing and the Free Market. Please amend as necessary. the AH does not illustrate any chases in the spaces; is that correct? This has been removed. This has been updated. This has been allocated to Free Market. Stair Detail and square footage has been added. This has been amended. AH 1 and 2 each have one chase (each in the North/East corner of the unit) for dryer vents. This is shown on the net livable with an "open" note. City of Aspen Received 4/24/17 Building Department Page: Z-204 Author: claudes Date: 4/10/2017 3:04:38 PM File Name: Plan Set.2017.01.pdf Zoning Comment: Please explain this projection into setback. Page: Z-205 Author: claudes Date: 4/11/2017 9:37:48 AM File Name: Plan Set.2017.01.pdf Zoning Comment: Provide compliant mechanical and venting area. Please provide equipment schedule, location Please provide detailed venting information Page: Z-205 Author: claudes Date: 4/10/2017 4:08:51 PM File Name: Plan Set.2017.01.pdf Zoning comment: Please provide comprehensive chart for 'Allowed Exception to Height Limitations' items. Please label the items, provide measurement lines to verify distances from street facing facades, provide height information of individual items and list the exceptions. For example, permanent roof top amenities, mechanical, venting, solar, elevator and stair tower, roof top railings, guards, venting, etc. Provide a separate chart for measuring the 15' in from facade; a.k.a. roof over topography. b)Measuring height within the footprint of the building. For the purposes of measuring height within the footprint of a building, areas of the building within 15 horizontal feet of the building’s perimeter shall be measured using the perimeter measurement, as described above. In all other areas, the natural grade of the site shall be projected up to the allowable height and the height of the structure shall be measured using this projected topography. 3' - 6 " 121'-0" T.O. SLAB @ NORTH PENTHOUSE 131'-2 1/2"T.O. SLAB @ LOWER ROOF DECK 110'-6" T.O. SLAB @ PARK LEVEL Zoning Comment: Please explain this projection into setback. T.O. SLAB = 7906'-2" FLAT DECK DA S H E D L I N E IN D I C A T E S 1 / 3 P O I N T DA S H E D L I N E IN D I C A T E S 1 / 3 P O I N T DA S H E D LI N E IN D I C A T E S 1/ 3 P O I N T MECHANICAL X = 7927'-2 1/2" H = 7928'-10 1/4" J = 7928'-7 1/4"K = 7928'-7 1/4" 8:12 8:128:12 8:12 8:12 1/4:12 1/4:12 790 3790 1 Zoning Comment: Provide compliant mechanical and venting area. Please provide equipment schedule, location Please provide detailed venting information 790 1 to the greatest extent practicable. Zoning comment: Please provide comprehensive chart for 'Allowed Exception to Height Limitations' items. Please label the items, provide measurement lines to verify distances from street facing facades, provide height information of individual items and list the exceptions. For example, permanent roof top amenities, mechanical, venting, solar, elevator and stair tower, roof top railings, guards, venting, etc. Provide a separate chart for measuring the 15' in from facade; a.k.a. roof over topography. b)Measuring height within the footprint of the building. For the purposes of measuring height within the footprint of a building, areas of the building within 15 horizontal feet of the building’s perimeter shall be measured using the perimeter measurement, as described above. In all other areas, the natural grade of the site shall be projected up to the allowable height and the height of the structure shall be measured using this projected topography. This is the awning over the front entry. It is 1’-5 ¼” into the setback. This is dimensioned on sheet Z-202. The dimension has been added to sheet Z-204 as well. Mechanical venting has been adjusted and are now shown on sheet Z-206. This has been updated. City of Aspen Received 4/24/17 Building Department Page: Z-205 Author: claudes Date: 4/10/2017 4:06:14 PM File Name: Plan Set.2017.01.pdf Zoning comment: Why is the 15' setback from facade other than a straight line? 3.Height Measurement Method. In measuring a building for the compliance with height restrictions, the measurement shall be the maximum distance measured vertically from the ground to the specified point of the building located above that point, as further described below: a)Measuring height along the perimeter of the building. At each location where the exterior perimeter of a building meets the ground, the measurement shall be taken from the lower of natural or finished grade. Building permit plans must depict both natural and finished grades. b)Measuring height within the footprint of the building. For the purposes of measuring height within the footprint of a building, areas of the building within 15 horizontal feet of the building’s perimeter shall be measured using the perimeter measurement, as described above. In all other areas, the natural grade of the site shall be projected up to the allowable height and the height of the structure shall be measured using this projected topography. T.O. SLAB = 7916'-9" FLAT DECK DASHED LINE INDICATES 1/3 POINT DASHED LINE INDICATES 1/3 POINT A = 7916'-9" L = 7916'-9" X = 7927'-2 1/2" B = 7911'-5 5/8" J = 7928'-7 1/4"K = 7928'-7 1/4" 8:128:12LINE OF PERIMETERAT GRADE 15' OFFSET FROMPERIMETER LINE OF WALLBELOW 790178997897 PROPERTY LINE SETBACK t over phy Actual Roof Height over Most Restrictive "20'-8" /8"15'-4 5/8" "9'-7 7/8" /2"27'-11 3/4" /2"27'-8 7/8" "15'-5 5/8" 1/4"27'-11 5/8" 1/4"27'-11 5/8" /4"27'-11 3/4" /4"27'-11 3/4" "19'-9" "10'-3" /2"26'-0 1/4" /2"22'-7 5/8" /8"23'-3" "22'-5" "24'-6" /4"23'-0 3/8" /2"26'-1 7/8" Zoning comment: Why is the 15' setback from facade other than a straight line? 3.Height Measurement Method. In measuring a building for the compliance with height restrictions, the measurement shall be the maximum distance measured vertically from the ground to the specified point of the building located above that point, as further described below: a)Measuring height along the perimeter of the building. At each location where the exterior perimeter of a building meets the ground, the measurement shall be taken from the lower of natural or finished grade. Building permit plans must depict both natural and finished grades. b)Measuring height within the footprint of the building. For the purposes of measuring height within the footprint of a building, areas of the building within 15 horizontal feet of the building’s perimeter shall be measured using the perimeter measurement, as described above. In all other areas, the natural grade of the site shall be projected up to the allowable height and the height of the structure shall be measured using this projected topography. City of Aspen Received 4/24/17 Building Department Page: Z-205 Author: claudes Date: 4/10/2017 3:37:09 PM File Name: Plan Set.2017.01.pdf Zoning Comment: provide the entire exception and illustrate the project meets the exception: e)Mechanical Equipment. Heating, ventilation, and air conditioning systems, and similar mechanical equipment or utility apparatus located on top of a building may extend up to six (6) feet above height of the building at the point the equipment is attached. This allowance is inclusive of any pad the equipment is placed on, as well as any screening. Mechanical equipment shall be screened, combined, and co-located to the greatest extent practicable. On structures other than a single-family or duplex residential building or an accessory building, all mechanical equipment shall be set back from any Street facing façade of the building a minimum of fifteen (15) feet. Z 7904'-3"N/A HISTORIC 7937'-9" AA 7903'-7"N/A HISTORIC 7931'-4" BB 7904'-2"N/A HISTORIC 7931'-4" CC 7902'-6"N/A HISTORIC 7927'-0 1/2" MECH SCREENING (LAND USE CODE) PER CHAPTER 26.575.020.F.4.E Mechanical Equipment. Heating, ventilation, and air conditioning systems, and similar mechanical equipment or utilityapparatus located on top of a building may extend up to six (6) feet above height of the building at the point the equipment isattached. This allowance is inclusive of any pad the equipment is placed on, as well as any screening. ELEVATOR AND (LAND U PER CHAPTER Elevator and Stair E structures other than duplex residential bubuilding, elevator ov stair enclosures may feet above the speclimit. Elevator and s extend up to ten (10 specified maximum from any Street facin building a minimum the footprint of the eenclosures are minim to the greatest exten Zoning Comment: provide the entire exception and illustrate the project meets the exception: e)Mechanical Equipment. Heating, ventilation, and air conditioning systems, and similar mechanical equipment or utility apparatus located on top of a building may extend up to six (6) feet above height of the building at the point the equipment is attached. This allowance is inclusive of any pad the equipment is placed on, as well as any screening. Mechanical equipment shall be screened, combined, and co-located to the greatest extent practicable. On structures other than a single-family or duplex residential building or an accessory building, all mechanical equipment shall be set back from any Street facing façade of the building a minimum of fifteen (15) feet. Entire exception has been added. All Mech equipment is within the building. Venting has been updated per previous comment. City of Aspen Received 4/24/17 Building Department