Loading...
HomeMy WebLinkAboutFile Documents.754 Moore Dr.0193.2019 (4).ARBK 0193 Revised Electrical Set.pdf(2) �i Page: E1.1 �� Y Checkmark: Unchecked These are note allowed outside of the . 1■ activity envelope. s�� Author:jimp i�= l�`jii� File Name: Revised Electrical Set.pdf 'r ��w�� i_ Electrical outlets have been relocated to the nearby planter wall VA' within the activity envelope. -Mark Hardeman, R+B Page: E1.1 Checkmark: Unchecked This should be integrated into the already Author:jimp approved address marker wall. A k AL File Name: Revised Electrical Set.pdf separate free standing door opener outside of the activity envelope is not a� "��as a*;, Gate and gate controller have been removed from allowed. . �'�:',V:o,.��W '''' Ea the project. -Mark Hardeman, R+B Revised Landscape Set.pdf(1) Page: L6 01 rk These are not allowed outside of the _ _-,,-- • Checkmark: Unchecked activity envelope. , Author:jimp File Name: Revised Landscape Set.pdf Electrical outlets have been relocated to the nearby planter wall , � --- within the activity envelope. -Mark Hardeman, R+B RECEIVED 02/11/2020 ASPEN BUILDING DEPARTMENT