Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Master Permit.210 E Cooper Ave.0215.2017 (2).ARBK
12/1/24,2:39 PM 0215.2017.ARBK—Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0215.2017.ARBK Number 0215.2017.ARBK Record Type Building- Imported Address 210 E COOPER AVE 2E Owner Fernando Cruz Original Number 73804 Status Closed- Final Type Building- Repair Reason for Cancel or Comp!.Review Fail Applicant SCOTT STRICKLAND Aspen Internal? Account S&S General CONSTRUCTION LLC Required Bond Amount Project Total Available Bond Amount Land Use Planning Is This Associated w/a Application Building Permit? Permit Contractor S&S General CONSTRUCTION LLC Master Building Permit Valid Business Bluebeam Project Id 400-803-045 License on Account Imported HPC-ZON-EH-UTIL Review Required HPC-ZON-EH-UTIL Submissions Review-2 Documents Eng Review Eng-CMP Rev, Resubmitted Approved Covid-19 Parks-Prkng-San Parks Rev,Parks Fee, Plan Review Conditional Parks Insp, Inspections Conditional Final Insp Parks Final, Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 ,/ Utility Review Type None Price Book EDEN Conditional Flat Fee Applicant is a Formula Nonprofit? Conditional Tiered Fee Eligible for Small Formula Lodge Program? Conditional Tiered Discount All Fees(%) SqFt Fee Formula Fee Discount Reason CO/LOC? CO Status if Issued Applicable Queue Score https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 1/10 12/1/24,2:39 PM 0215.2017.ARBK-Salesforce-Enterprise Edition Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received Milestone-Total Days from Applicant in Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 9/6/2017 TCO Issuance Date Application Complete 9/6/2017 Close/CO Issuance 6/17/2021 Date Date Application Accepted 9/6/2017 Expiration Date 11/3/2021 Date Issue Date 11/17/2017 Override Expiration Date Last Activity Date 5/7/2021 Basic Information Description Applicant: Census Code 434-Additions,Alterations, and Scott Strickland Conversions to Residential Buildings S&S REPAIR//REMOVE AND REPLACE SOUTH FACING DECKS ON SECOND AND THIRD LEVELS REMOVE AND REPLACE BOTH SOUTH FACING EXTERIOR STAIRS AND WALKWAYS// JOHN//BLUEBEAM 400-803-045 Use of Building Multi-Family Interior Remodel Only Use Class Residential Class of Work Repair Permit Comments Job Location Address 210 E COOPER AVE 2E,ASPEN : Lot 273513108004 Site Address Display on Map Legal Description Subdivision: 210 COOPER CONDOMINIUMS Unit: 2-E Historic Property? No Eden Address 210 E COOPER AVE Historic District? No HPC - Planning -Zoning Details Zone District L HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land No Use Approval? Deed Restricted? No Located in a PD? No https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 2/10 12/1/24,2:39 PM 0215.2017.ARBK-Salesforce-Enterprise Edition #of Dwellings Adds/Changes Floor No Area? Category of Zoning Exterior Occupancy or Use No Fee Change? Zoning Work Level Work Affects Exterior Yes of Building? Building Project Details Valuation $200,000.00 Lot Size Sq.Ft. 11,700 Reason for Valuation Soil Disturbance Sq Ft 100 Change Unit Sq.Ft. Affected Area Sq Ft 100 Building Footprint Sq Existing Hardscape Ft Footprint Sq Ft Sq Ft of Building Work 1,188 Existing Hardscape% 0% Area of Lot Building Fire Area Sq 20,364 Con Mit Sq Ft Total 1,288 Ft Utility Review Sq. Ft. Utility Review Sq Ft 100 Total %of Interior being 0% Altered New Sq. Ft. 0 Scope of Work Details Work Changes Building No Work Affects Yes Footprint? Tree/Drip Line? Work Changes No Located Within City No Fenestration/Thrml Mall Boundaries? Envelop? Requires Asbestos No Adjacent to City Open No Test? Space? Photovoltaic Installation No Impacts City No Trails/Parks? Work No Work Subject to Water No Adds/Removes/Changes Efficient L.O.? Plumbing Fixt? Restaurant/Food No Involves Impact on No Service Involved? Sewer? Change of Restaurant No Prevents Access to No Ownership? Sewer Main? Affects No Sewer Easements No Parking/Alleys/Loading? Affected? Building Description Code Editions 2015 IRC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VA Total Spa Sq Ft Occupancy Load Total Pool Sq Ft https://cityofaspen.my.salesforce.com/a033s00000kZrfIAAS/p 3/10 12/1/24,2:39 PM 0215.2017.ARBK-Salesforce-Enterprise Edition Fire Sprinkler Amount of Onsite Existing? Renewable Generation? Fire Sprinkler No CO Description Required? Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor #Wood Fireplaces 2nd Floor #Gas Log Fireplaces 3rd Floor #Gas Appliances Additional Open Text Field For Comments Financials Total Fees $0.00 Total Payments Fees Due at Current Total Balance $0.00 Status System Information Number 0215.2017.ARBK Community Visibility ,/ Created By Ruth Kinney, 7/27/2019 1:48 PM Contact IDs IsTestData? Last Modified By Fernando Cruz, 12/1/2024 2:38 PM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Letter of Completion -210 E Cooper ave -0215.2017.ARBK - Issued Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/17/2021 Days in Applicant's Hands Comments To: scott@snsaspen.com CC: BCC: Attachment: 210 E Cooper Ave-0215.2017.ARBK-LOC Final.pdf, City_Use_Tax_to_Owner_210 E Cooper Ave -0215.2017.ARBK.pdf, 1-County Use Tax Final Return Template(PDF).pdf, Notice_to_Contractor_210 E Cooper Ave-0215.2017.ARBK.pdf, 1-City Final Return_Use Tax.pdf Subject: Letter of Completion -210 E Cooper ave-0215.2017.ARBK-Issued Body: https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 4/10 12/1/24,2:39 PM 0215.2017.ARBK—Salesforce-Enterprise Edition Good afternoon, Please find attached your issued Letter of Completion for the completed project at 210 E Cooper Ave. Additionally you will find attached the owner of the property's and the contractors City use tax letters and tax reconciliation forms. Please distribute these as necessary. If you have any questions please feel free to reach out. Kind regards, Lilly Culver Email: COVID-19 Safety Plan Approval Type Billable Assigned To Carl Kishbaugh (No longer working for City, contact Aaron Reed) Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/21/2020 Days in Applicant's Hands To: scott@snsaspen.com CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200521.pdf,210 E Cooper COVID Review.pdf Subject: COVID-19 Safety Plan Approval Body: Comments Dear SCOTT STRICKLAND, Thank you for submitting a COVID-19 Site Safety Plan for 0215.2017.ARBK at 210 E COOPER AVE. City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re-commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Sara Nester Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/9/2020 Days in Applicant's Hands Comments To: scott@snsaspen.com CC: BCC: Attachment: --none-- Subject: Important!Your City of Aspen permit has been moved to new permitting system Body: Dear SCOTT STRICKLAND, As you may know,the City of Aspen has been transitioning to a new online-based permitting https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 5/10 12/1/24,2:39 PM 0215.2017.ARBK—Salesforce-Enterprise Edition system, Salesforce.Thank you for your patience during this transition,which is now complete. Your permit is now operational in Salesforce.Your project located at 210 E COOPER AVE,ASPEN : 273513108004 will retain its original permit number,0215.2017.ARBK and you will use this number to find your permit in Salesforce. If you have not already done so,you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidld= If you have additional questions that are not addressed at the above links,you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/7/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 11/24/2020 Days in Applicant's Hands Comments Contacts Account S&S General CONSTRUCTION LLC Type Contractor Active Contractor License Count 1.00 Number 0011818 Account S&S General CONSTRUCTION LLC Type Applicant Active Contractor License Count 1.00 Number 0024530 https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 6/10 12/1/24,2:39 PM 0215.2017.ARBK—Salesforce-Enterprise Edition Fees 0068980 Type Use Tax Deposit-City of Aspen Total $1,050.00 Waived/Refunded Amt $1,050.00 Discount$ Outstanding $0.00 Fee Due At Closed -Final Show in Cart Paid in Full ✓ Fee Paid Date/Time Files 0215.2017.ARBK_Fees City_Use_Tax_to_Owner_210 E Cooper Ave - Last Modified 1/13/2022 5:40 PM 0215.2017.ARBK Created By AnnMarie Prince Last Modified 6/17/2021 3:33 PM Created By Lilly Culver Notice_to_Contractor_210 E Cooper Ave - 0215.2017.ARBK 1-County Use Tax Final Return Template (PDF) Last Modified 6/17/2021 3:32 PM Last Modified 6/17/2021 3:31 PM Created By Lilly Culver Created By Lilly Culver 1-City Final Return_Use Tax 210 E Cooper Ave -0215.2017.ARBK- LOC Final Last Modified 6/17/2021 3:31 PM Last Modified 6/17/2021 3:30 PM Created By Lilly Culver Created By Lilly Culver City_Use_Tax_- City_Use_Tax_- FRRNotice toContractor 20210617.docx FRR Notice to Contractor 20210617.docx Last Modified 6/17/2021 3:24 PM Last Modified 6/17/2021 3:24 PM Created By Lilly Culver Created By Lilly Culver City_Use_Tax_- 210 E Cooper Ave -0215.2017.ARBK- LOC Final _FRR_Transmittal_to_Owner_20210617.docx Last Modified 6/17/2021 3:22 PM Last Modified 6/17/2021 3:23 PM Created By Lilly Culver Created By Lilly Culver LOC_Letter_20210510.docx LOC_Letter_20210510.docx Last Modified 5/10/2021 12:12 PM Last Modified 5/10/2021 12:12 PM Created By Lilly Culver Created By Lilly Culver 210 E Cooper COVID Review MEP_Permit_Letter_20210510.docx Last Modified 5/21/2020 9:24 AM Last Modified 5/10/2021 12:10 PM Carl Kishbaugh (No longer working for City, Created By Lilly Culver Created By contact Aaron Reed) APPROVAL_NOTICE_COVID- permit#0215.2017.arbk- inspections 19_SITE_SAFETY_PLAN_20200521.pdf Last Modified 4/9/2020 8:58 AM Last Modified 5/21/2020 9:23 AM Created By Sara Nester Created By Carl Kishbaugh (No longer working for City, contact Aaron Reed) Inspections INS-0006031-20 Status Pass/Accepted Type Parks https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 7/10 12/1/24,2:39 PM 0215.2017.ARBK—Salesforce-Enterprise Edition Subtype Requested Date 11/17/2020 8:27 AM Scheduled Start Date Completed Date 11/17/2020 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0006434-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 5/18/2020 7:53 AM Scheduled Start Date Completed Date 5/21/2020 Owner Last Name Kishbaugh (No longer working for City, contact Aaron Reed) Permit Inspection Round Final Inspection Closed TRUE INS-0007723-20 Status Pass/Accepted Type Zoning Subtype Requested Date 11/17/2020 8:28 AM Scheduled Start Date 11/17/2020 Completed Date 11/17/2020 Owner Last Name Pomeroy Permit Inspection Round Closed TRUE INS-0007724-20 Status Closed -Not Needed Type Fire Subtype Requested Date 11/17/2020 8:30 AM Scheduled Start Date Completed Date 11/18/2020 Owner Last Name Legersky Permit Inspection Round Closed TRUE INS-0016185-20 Status Failed/Rejected Type Building -Final Deconstruction Subtype Requested Date 11/20/2020 6:54 AM Scheduled Start Date 11/23/2020 Completed Date 11/23/2020 Owner Last Name MILLER Permit Inspection Round Final Inspection Closed TRUE INS-0016507-20 https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 8/10 12/1/24,2:39 PM 0215.2017.ARBK—Salesforce-Enterprise Edition Status Pass/Accepted Type Building -Final Deconstruction Subtype Requested Date 5/6/2021 6:02 AM Scheduled Start Date 5/7/2021 Completed Date 5/7/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE Milestones Review Round 1 -0215.2017.ARBK Status Approved Due Date Created Date 4/9/2020 Permit History 12/1/2024 2:38 PM User Fernando Cruz Action Changed Address from 210 E COOPER AVE,ASPEN : 273513108004 to 210 E COOPER AVE 2E,ASPEN : 273513108004. 12/1/2024 2:38 PM User Fernando Cruz Action Changed Owner from Lilly Culver to Fernando Cruz. Related Permits 0169.2018.ARBK Type Change Order Address 210 E COOPER AVE Work Type New Status Closed -Final Applicant SCOTT STRICKLAND Issue Date 9/11/2018 Last Activity Date 0276.2018.AELE Type Electrical Address 210 E COOPER AVE Work Type New Status Closed -Final Applicant TO BE DETERMINED Issue Date 1/14/2019 Last Activity Date Reviews REV-012407 Milestone Review Round 1 -0215.2017.ARBK Status Approved Type Parks Due Date Completed Date 1/1/2019 9:06 AM Owner Alias Parks -Review On Hold Created Date 4/9/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 9/10 12/1/24,2:39 PM 0215.2017.ARBK—Salesforce-Enterprise Edition REV-012408 Milestone Review Round 1 -0215.2017.ARBK Status Approved Type Engineering CMP Due Date Completed Date 1/1/2019 9:05 AM Owner Alias Engineering CMP-Review On Hold Created Date 4/9/2020 REV-012409 Milestone Review Round 1 -0215.2017.ARBK Status Approved Type Building Due Date Completed Date 1/1/2019 9:02 AM Owner Alias BMuhi On Hold Created Date 4/9/2020 REV-012410 Milestone Review Round 1 -0215.2017.ARBK Status Approved Type Zoning Due Date Completed Date 1/1/2019 9:03 AM Owner Alias Zoning-Review On Hold Created Date 4/9/2020 REV-012411 Milestone Review Round 1 -0215.2017.ARBK Status Approved Type Fire Due Date Completed Date 1/1/2019 9:04 AM Owner Alias BMuhi On Hold Created Date 4/9/2020 Submissions COA Covid Plan 210 E Cooper Decks.pdf Actions Submission Date 5/18/2020 7:52 AM Status Required Description Copyright©2000-2024 salesforce.com, inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000kZrflAAS/p 10/10