Loading...
HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0235.2018 (17).ARBK 0235-2018-ARBK_BuildingComments_2 Plan Set Change Order Rev 1.805 Roaring Fork Road.2019.02.pdf(1) � Page:A0.0 PROPOSED SITE PLAN &RREMP \ File Name: Plan Set Change Order Rev 1.805 Roaring Fork Road.2019.02.pdf "`" = • Subject: Group Author: nickt Color: • snowmelt areas match. mechanical has the garage drive and mudroom entry walk on a single manifold. We further broke our numbers out, but overall they match. Revision reference number = 5 Coordinate the REMP snowmelt areas between the architecturals and mechanicals.You have the same total but not the same numbers for each area. Coordinate. Structural Plan Set Change Order.805 Roaring Fork Road.2019.02.pdf(1) Page: S6.0 SPA AND SITE DETAILS Indicate insulation value on File Name: Structural Plan Set Change Order.805 Roaring architecturals as referenced by Fork Road.2019.02.pdf structurals. Min R 15 per 2015 • a Subject: PlanCheck IECC R402.1.2.Also,the roof of �Fw Author: nickt � Color: • the vault must be insulated to R-49. SPA VAULT SECTION Unit heater in the spa vault has been removed, therefore we do not need insulation for the vault. All notes have been revised. On a related note, we have represented an unconditioned non vented crawl space. This resulted in the removal of wall insulation at the concrete walls, therefore requiring no drywall ignition barrier. Revision reference number = 5 RECEIVED 04/24/2019 ASPEN BUILDING DEPARTMENT