� Page:A0.0 PROPOSED SITE PLAN &RREMP
\ File Name: Plan Set Change Order Rev 1.805 Roaring Fork
Road.2019.02.pdf
"`" = • Subject: Group
Author: nickt
Color: •
snowmelt areas match. mechanical has the garage
drive and mudroom entry walk on a single manifold. We
further broke our numbers out, but overall they match.
Revision reference number = 5
Coordinate the REMP snowmelt
areas between the architecturals
and mechanicals.You have the
same total but not the same
numbers for each area.
Coordinate.
Structural Plan Set Change Order.805 Roaring Fork Road.2019.02.pdf(1)
Page: S6.0 SPA AND SITE DETAILS
Indicate insulation value on
File Name: Structural Plan Set Change Order.805 Roaring architecturals as referenced by
Fork Road.2019.02.pdf
structurals. Min R 15 per 2015
• a Subject: PlanCheck IECC R402.1.2.Also,the roof of
�Fw Author: nickt
� Color: • the vault must be insulated to
R-49.
SPA VAULT SECTION
Unit heater in the spa vault has been removed, therefore
we do not need insulation for the vault. All notes have
been revised.
On a related note, we have represented an
unconditioned non vented crawl space. This resulted in
the removal of wall insulation at the concrete walls,
therefore requiring no drywall ignition barrier.
Revision reference number = 5