Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Master Permit.1320 Snowbunny Ln.0290.2018.ARBK
12/2/24,3:26 PM 0290.2018.ARBK-Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0290.2018.ARBK Number 0290.2018.ARBK Record Type Building-Imported Address 1320 SNOWBUNNY LN Owner Fernando Cruz Original Number 76917 Status Closed-Final Type Building Reason for Cancel or Compl. Review Fail Applicant BRAD CRAWFORD Aspen Internal? No Account CRAWFORD DESIGN BUILD LLC Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Is This Associated w/a Building Permit? Permit Contractor CRAWFORD DESIGN BUILD LLC Master Building Permit Valid Business License on Bluebeam Project Id 322-592-046 Account Imported ,/ HPC-ZON-EH-UTIL Review Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Resubmitted Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Approved Covid-19 Plan ,/ Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,San Rev, Conditional Inspections Parks Insp, Conditional Final Insp Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parks Final,Water-LSE Final,San Final, Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 ,/ Utility Review Type Major Price Book EDEN Conditional Flat Fee Formula FP, Applicant is a Nonprofit? No Conditional Tiered Fee Formula Eligible for Small Lodge No Program? Conditional Tiered SqFt Fee MAR, Discount All Fees(%) Formula Fee Discount Reason CO/LOC? CO Status if Applicable Issued Queue Score Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received from Milestone-Total Days in Applicant Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 12/13/2018 TCO Issuance Date Application Complete Date 12/13/2018 Close/CO Issuance Date 12/7/2021 Application Accepted Date 12/13/2018 Expiration Date 6/4/2022 Issue Date 7/24/2019 Override Expiration Date Last Activity Date 12/6/2021 Basic Information Description Applicant: Census Code 103-Two Family Residences Brad Crawford Crawford Design Build NEW DUPLEX BUILDING-UNIT B;UNITA 0291.2018.ARBK//LAUREN//BLUEBEAM 322-592-046 https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 1/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Use of Building Duplex Interior Remodel Only Use Class Residential Class of Work New Permit Comments Job Location Address 1320 SNOWBUNNY LN,ASPEN:273501363001 Lot Site Address Display on Map Legal Description Historic Property? No Eden Address 1320 SNOWBUNNY LN Historic District? No HPC-Planning-Zoning Details Zone District R-15 HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use No Approval? Deed Restricted? No Located in a PD? No #of Dwellings Adds/Changes Floor Area? Yes Category of Zoning Fee Residential Occupancy or Use Change? Yes Zoning Work Level Major Zoning Fee Work Affects Exterior of Yes Building? Building Project Details Valuation $1,689,797.00 Lot Size Sq.Ft. 7,500 Reason for Valuation Change Soil Disturbance Sq Ft 7,500 Unit Sq.Ft. 7,500 Affected Area Sq Ft 7,500 Building Footprint Sq Ft Existing Hardscape Footprint 0 Sq Ft Sq Ft of Building Work Area 7,500 Existing Hardscape%of Lot 0% Building Fire Area Sq Ft 8,071 Con Mit Sq Ft Total 15,000 Utility Review Sq.Ft. 7,500 Utility Review Sq Ft Total 7,500 %of Interior being Altered New Sq.Ft. 7,500 Scope of Work Details Work Changes Building Yes Work Affects Tree/Drip Line? Yes Footprint? Work Changes Yes Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? Yes Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes Yes Work Subject to Water Efficient Yes Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? Yes Involved? Change of Restaurant No Prevents Access to Sewer No Ownership? Main? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Building Description Code Editions 2015 IRC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Fire Sprinkler Existing? Amount of Onsite Renewable Generation? Fire Sprinkler Required? Yes CO Description Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor #Wood Fireplaces 2nd Floor #Gas Log Fireplaces 3rd Floor https://cityofaspen.my.Salesforce.com/a033s00000kZrtLAAS/p 2/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition #Gas Appliances Additional Open Text Field For Comments Financials Total Fees $0.00 Total Payments Fees Due at Current Status Total Balance $0.00 System Information Number 0290.2018.ARBK Community / Visibility Created By Ruth Kinney, Contact 0033s000011 OXQUAA0,0036A00000ZPzftQAD,0033s000010f2ZZAAY,0036A00000ZPoCsQAL,0036A00000cuuxcQAA,0034000001iILJtAAO 7/27/2019 1:50 IDs PM IsTestData? Last Fernando Cruz,12/2/2024 3:26 PM Modified By VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email:Certificate of Occupancy 1320 Snowbunny Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/7/2021 Days in Applicant's Hands To:crawforddesignbuild@comcast.net CC: BCC: Attachment:1320 Snowbunny-0290.2018.ARBK-FRR to owner.pdf,1-County Use Tax Final Return Template(PDF).pdf,1320 Snowbunny- 0290.2018.ARBK-FRR to contractor.pdf,1320 Snowbunny Ln-0290.2018.ARBK CO.pdf,1-City Final Return_Use Tax.pdf Subject:Certificate of Occupancy 1320 Snowbunny Body: Good Morning, Comments Please find attached your issued Certificate of Occupancy for the completed project at 1320 Snowbunny. Additionally you will find attached the Contractor's and the Owner of the property's City use tax letters and tax reconciliation forms.Please distribute these as necessary. If you have any questions or concerns please let us know. Warmest Regards, Lisa Guida Email:Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/3/2021 Days in Applicant's Hands Comments To:crawforddesignbuild@comcast.net CC: BCC: Attachment:UCP_Water_Final_20211203.docx.pdf Subject:Utility Connection Permit Final Body: Hello BRAD CRAWFORD, Attached is your review Utility Connection Permit for the completed project at 1320 SNOWBUNNY LN associated with permit#:0290.2018.ARBK. After review,please print,have signed by owner,and notarized.Once signed and notarized,please return UCP with payment,if applicable,to the https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 3/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively,you may upload the signed and notarized copy of the UCP as a SCANNED(not photographed).pdf file and pay all fees due via Salesforce,but if submitting via Salesforce,please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a"push"notification that these permit requirements are complete. Please reach out with any questions or concerns. Thank you,Brad,and happy holidays! Steve Wilson Email:COVID-19 Safety Plan Approval Type Billable Assigned To MITCH MILLER Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/27/2020 Days in Applicants Hands To:joelcrawford.cdb@gmail.com CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200427.pdf Subject:COVID-19 Safety Plan Approval Comments Body: Dear BRAD CRAWFORD, Thank you for submitting a COVID-19 Site Safety Plan for 0290.2018.ARBK at 1320 SNOWBUNNY LN.City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re-commence construction.Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement.Please adhere to all aspects of the plans to keep all employees and the community safe.Failure to adhere to the plan,as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe,and please let us know if you have any further questions. Email:COVID Site Safety Plan Comments Type Billable Assigned To Carl Kishbaugh(No longer working for City,contact Aaron Reed) Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/24/2020 Days in Applicants Hands To:crawforddesignbuild@comcast.net CC: BCC: Attachment:1320+1322 Snowbunny COVID Review.pdf Subject:COVID Site Safety Plan Comments Body: To whom it may concern; Attached are comments to your submission of the COVID Site Safety Plan that need to be revised for approval.Once you have made revisions please resubmit your new document the same way you did before.Below is a link for directions on how to submit your Site Safety.Please contact me with any questions. Thanks, Carl Kishbaugh Construction Mitigation Officer City of Aspen Engineering Dept. 970.309.5603 Carl.kishbaugh@cityofaspen.com Comments COVID Standardized Site Safety Plan: https://www.cityofaspen.com/1285/Covid-19-Construction CMP Manual: https://www.cityofaspen.com/DocumentCenter/View/507/Construction-Mitigation-Plan-Manual-PDF?bidld=Contact me directly with any questions. To apply for Temporary Encroachment or Right of Way Permits,register here: https://www.surveymonkey.com/r/SFNewUser Salesforce Online Permits: https://cityofaspen.force.com/applicantportal/s/login/?startURL=%2Fapplicantportal%2Fs%2F&ec=302 If you need assistance,please contact customer support: sfsupport@cityofaspen.com or call 970-920-5065 Online Salesforce Instructions: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support Email:Important!Your City of Aspen permit has been moved to new permitting system https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 4/23 12/2/24,3:26 PM 029O.2018.ARBK—Salesforce-Enterprise Edition Type Billable Assigned To Sophie Varga Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/16/2020 Days in Applicant's Hands To:crawforddesignbuild@comcast.net CC: BCC: Attachment:--none-- Subject:Important!Your City of Aspen permit has been moved to new permitting system Body: Dear BRAD CRAWFORD, As you may know,the City of Aspen has been transitioning to a new online-based permitting system,Salesforce.Thank you for your patience during this transition,which is now complete.Your permit is now operational in Salesforce.Your project located at 1320 SNOWBUNNY LN,ASPEN: 273501311004 will retain its original permit number,0290.2018.ARBK and you will use this number to find your permit in Salesforce.If you have not already done so,you must register in Salesforce before you are able to access your permit information,upload new documents,request inspections, or otherwise track the status of your permit.Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system.Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenterNiew/4254/Request-an-Inspection?bid Id= If you have additional questions that are not addressed at the above links,you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Comments Sincerely, Lauren Litchet City of Aspen Sophie Varga Zoning Enforcement Officer Community Development 130 S.Galena St. Aspen,CO 81611 p:970.429.2778 c:970.274.7256 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contained in the email are based on current zoning,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Planning Review Type Utilities Billable Assigned To Steve Wilson Number of Hours 3.00 Total Cost $975.00 Fee Generated Date Start Date Completed Date 12/3/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 11/10/2021 Days in Applicant's Hands https://cityofaspen.my.salesforce.com/a033sOOOOOkZrtLAAS/p 5/23 12/2/24,3:26 PM 0290.2018.ARBK-Salesforce-Enterprise Edition Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 11/4/2021 Days in Applicant's Hands Comments Planning Review Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/14/2020 Days in Applicant's Hands Comments Planning Review Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/14/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/15/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/21/2021 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 6/23 12/2/24,3:26 PM 0290.2018.ARBK-Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/10/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/25/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/24/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/18/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/13/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/13/2021 Days in Applicant's Hands Comments Permit Inspection https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 7/23 12/2/24,3:26 PM 0290.2018.ARBK-Salesforce-Enterprise Edition Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/13/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/7/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.25 Total Cost $81.25 Fee Generated Date Start Date Completed Date 5/27/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.25 Total Cost $81.25 Fee Generated Date Start Date Completed Date 3/18/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/18/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/10/2020 Days in Applicant's Hands Comments Contacts SIMON BENTLEY Account CRAWFORD DESIGN BUILD LLC Type Contractor https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 8/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Active Contractor License Count 0.00 Number 0025664 DON GLENN Account CRAWFORD DESIGN BUILD LLC Type Contractor Active Contractor License Count 0.00 Number 0025665 JOEL CRAWFORD Account CRAWFORD DESIGN BUILD LLC Type Contractor Active Contractor License Count 0.00 Number 0025666 BRAD CRAWFORD Account CRAWFORD DESIGN BUILD LLC Type Contractor Active Contractor License Count 0.00 Number 0012558 Account CRAWFORD DESIGN BUILD LLC Type Applicant Active Contractor License Count 0.00 Number 0023592 MARTIN MATA Account MATA DESIGN COMPANY Type Architect Active Contractor License Count 0.00 Number 0024311 PHIL LEHUE Account PHIL LEHUE Type Representative Active Contractor License Count 0.00 Number 0042789 Fees 0068972 Type Use Tax Deposit-City of Aspen Total $4,224.49 Waived/Refunded Amt $4,224.49 Discount$ Outstanding $0.00 Fee Due At Closed-Final Show in Cart Paid in Full ✓ Fee Paid Date/Time Files 1-County Use Tax Final Return Template(PDF) 1-City Final Return_Use Tax Last Modified 12/7/2021 7:31 AM Last Modified 12/7/2021 7:31 AM Created By Lisa Guida Created By Lisa Guida 1320 Snowbunny Ln-0290.2018.ARBK CO 1320 Snowbunny-0290.2018.ARBK-FRR to owner Last Modified 12/7/2021 7:29 AM Last Modified 12/7/2021 7:29 AM Created By Lisa Guida Created By Lisa Guida 1320 Snowbunny-0290.2018.ARBK-FRR to contractor City_Use_Tax_-_FRR_Notice_to_Contractor_20211207.docx Last Modified 12/7/2021 7:29 AM Last Modified 12/7/2021 6:56 AM Created By Lisa Guida Created By Lisa Guida City_Use_Tax_-_FRR_Transmittal_to_Owner_20211207.docx 40.Stormwater Maintenance Plan.1320 Snowbunny.20211203 Last Modified 12/7/2021 5:51 AM Last Modified 12/3/2021 12:50 PM Created By Lisa Guida Created By Phil LeHue 80.Survey Roof Height Verification.1320 Snowbunny.20211203 80.As-Built Survey.1320 Snowbunny Ln.20211203 Last Modified 12/3/2021 12:49 PM Last Modified 12/3/2021 12:48 PM Created By Phil LeHue Created By Phil LeHue 1320 Snowbunny Ln.Final Count Sheet UCP_Water_Final_20211203.docx Last Modified 12/3/2021 9:56 AM Last Modified 12/3/2021 9:51 AM Created By Steve Wilson Created By Steve Wilson https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 9/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition 50.Stormwater.BMP agreement.1320 Snowbunny Ln.20211117 70.WELS-IR_Maintenance Sched.1320 Snowbunny.20211122 Last Modified 11/22/2021 2:00 PM Last Modified 11/22/2021 1:11 PM Created By Phil LeHue Created By Phil LeHue 70.WELS-IR_Approval Letter.1320 Snowbunny.20211122 70.WELS-IR Audit Report.1320 Snowbunny.20211122 Last Modified 11/22/2021 1:11 PM Last Modified 11/22/2021 1:11 PM Created By Phil LeHue Created By Phil LeHue 70.Landscaping As-Builts.1320 Snowbunny Ln.20211122 IRC_TCO_Letter_20201222.docx Last Modified 11/22/2021 1:11 PM Last Modified 12/22/2020 9:40 AM Created By Phil LeHue Created By Lilly Culver APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN20200427.pdf 0290.2018.arbk inspections Last Modified 4/27/2020 2:13 PM Last Modified 1/16/2020 9:04 AM Created By MITCH MILLER Created By Sophie Varga 0290.2018.arbk fees Last Modified 1/16/2020 9:04 AM Created By Sophie Varga Inspections INS-0000864-20 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 12/22/2020 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0000869-20 Status Pass/Accepted Type Concrete Subtype Footings Requested Date 5/27/2020 10:00 AM Scheduled Start Date 5/27/2020 Completed Date 5/27/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0000870-20 Status Pass/Accepted Type Concrete Subtype Piers Requested Date 7/6/2020 12:39 PM Scheduled Start Date 7/7/2020 Completed Date 7/7/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000871-20 Status Partial/Non-Complete Type Concrete Subtype Pads Requested Date 10/14/2020 8:30 AM Scheduled Start Date 10/14/2020 Completed Date 10/14/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000872-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 3/9/2020 1:30 PM Scheduled Start Date 3/9/2020 Completed Date 3/9/2020 Owner Last Name Feder https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 10/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Permit Inspection Round Initial Inspection Closed TRUE INS-0000879-20 Status Partial/Non-Complete Type APECC Subtype Glazing Requested Date 5/27/2021 9:48 AM Scheduled Start Date 5/27/2021 Completed Date 5/27/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0000880-20 Status Failed/Rejected Type APECC Subtype Snowmelt Requested Date 10/14/2020 8:30 AM Scheduled Start Date 10/14/2020 Completed Date 10/14/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000881-20 Status Partial/Non-Complete Type APECC Subtype Radon Requested Date 3/6/2020 11:00 AM Scheduled Start Date 3/6/2020 Completed Date 3/6/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0000885-20 Status Partial/Non-Complete Type Zoning Subtype Requested Date 3/4/2020 9:58 PM Scheduled Start Date Completed Date 3/5/2020 Owner Last Name Varga Permit Inspection Round Initial Inspection Closed TRUE INS-0000892-20 Status Pass/Accepted Type Fire Subtype Requested Date Scheduled Start Date Completed Date 7/31/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0006509-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/24/2020 2:28 PM Scheduled Start Date 4/27/2020 Completed Date 4/27/2020 Owner Last Name MILLER Permit Inspection Round Final Inspection Closed TRUE INS-0004194-20 Status Accepted as Noted Type APECC Subtype Radon Requested Date 3/17/2020 12:35 PM https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 11/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Scheduled Start Date 3/18/2020 Completed Date 3/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004306-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 3/18/2020 8:00 AM Scheduled Start Date 3/18/2020 Completed Date 3/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004857-20 Status Failed/Rejected Type Building Subtype Rough Framing Requested Date 8/13/2020 11:30 AM Scheduled Start Date 8/13/2020 Completed Date 8/13/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0011406-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 8/18/2020 11:30 AM Scheduled Start Date 8/18/2020 Completed Date 8/18/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012836-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date 11/4/2021 12:00 PM Scheduled Start Date Completed Date 12/3/2021 Owner Last Name Danneberg Permit Inspection Round Final Inspection Closed TRUE INS-0012838-20 Status Pass/Accepted Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date 11/5/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0012840-20 Status Accepted as Noted Type Engineering Erosion&Sediment Subtype Requested Date Scheduled Start Date Completed Date 11/23/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0013256-20 Status Re-Inspection Required https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 12/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Type Zoning Subtype Requested Date 11/2/2021 10:00 AM Scheduled Start Date 11/4/2021 Completed Date 11/4/2021 Owner Last Name Varga Permit Inspection Round Final Inspection Closed TRUE INS-0013257-20 Status Pass/Accepted Type Water Efficient Landscaping Subtype Requested Date 10/7/2021 9:00 AM Scheduled Start Date Completed Date 11/30/2021 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0014381-20 Status Failed/Rejected Type APECC Subtype Snowmelt Requested Date 7/14/2021 8:30 AM Scheduled Start Date 7/14/2021 Completed Date 7/14/2021 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE INS-0016242-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date 11/4/2021 10:00 AM Scheduled Start Date Completed Date 12/3/2021 Owner Last Name Wilson Permit Inspection Round Closed TRUE INS-0003929-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 5/12/2021 9:00 AM Scheduled Start Date 5/12/2021 Completed Date 5/12/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0003995-21 Status Failed/Rejected Type Building Subtype Rough Framing Requested Date 5/17/2021 9:00 AM Scheduled Start Date 5/17/2021 Completed Date 5/17/2021 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0004185-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 5/24/2021 10:00 AM Scheduled Start Date 5/24/2021 Completed Date 5/24/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 13/23 12/2/24,3:26 PM 029O.2018.ARBK—Salesforce-Enterprise Edition INS-0004205-21 Status Pass/Accepted Type APECC Subtype Insulation Requested Date 5/27/2021 9:48 AM Scheduled Start Date 5/27/2021 Completed Date 5/27/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004296-21 Status Accepted as Noted Type APECC Subtype Glazing Requested Date 10/26/2021 1:01 PM Scheduled Start Date 10/26/2021 Completed Date 10/26/2021 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE I N S-0004491-21 Status Pass/Accepted Type Building Subtype Drywall Requested Date 6/9/2021 10:00 AM Scheduled Start Date 6/9/2021 Completed Date 6/9/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0005128-21 Status Failed/Rejected Type Concrete Subtype Walls Requested Date 7/14/2021 8:30 AM Scheduled Start Date 7/14/2021 Completed Date 7/14/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0005149-21 Status Accepted as Noted Type APECC Subtype Snowmelt Requested Date 11/29/2021 10:39 AM Scheduled Start Date 11/29/2021 Completed Date 11/29/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0007255-21 Status Closed-Not Needed Type Building Subtype Special Building Inspection Requested Date 11/4/2021 9:30 AM Scheduled Start Date 11/4/2021 Completed Date 11/4/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0007265-21 Status Closed-Not Needed Type Building Subtype Special Building Inspection Requested Date 11/10/2021 10:00 AM Scheduled Start Date 11/10/2021 Completed Date 11/10/2021 Owner Last Name Feder https://cityofaspen.my.salesforce.com/a033sOOOOOkZrtLAAS/p 14/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Permit Inspection Round Closed TRUE INS-0007275-21 Status Pass/Accepted Type Zoning Subtype Requested Date 12/3/2021 2:00 PM Scheduled Start Date 12/6/2021 Completed Date 12/6/2021 Owner Last Name Varga Permit Inspection Round Re-Inspection Closed TRUE INS-0007370-21 Status Closed-Not Needed Type Building Subtype Special Building Inspection Requested Date 11/10/2021 10:00 AM Scheduled Start Date 11/10/2021 Completed Date 11/10/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0007388-21 Status Pass/Accepted Type Building Subtype Final Building Requested Date 12/3/2021 9:28 AM Scheduled Start Date 12/6/2021 Completed Date 12/6/2021 Owner Last Name Feder Permit Inspection Round Closed TRUE I N S-0007781-21 Status Pass/Accepted Type Utilities Subtype Requested Date Scheduled Start Date Completed Date 12/3/2021 Owner Last Name Permit Inspection Round Closed TRUE MEP Permit Inspections INS-0002777-19 Type Engineering ROW/Encr/Gr Subtype Status Accepted as Noted Permit 0045-2019-RWRG Due Date Priority 2 Normal Owner Alias rflin Closed TRUE INS-0003439-20 Type Plumbing Subtype Plumbing Underground Status Pass/Accepted Permit 0015-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0003440-20 Type Plumbing Subtype Final Plumbing Status Pass/Accepted Permit 0015-2020-PLUM Due Date Priority 2 Normal https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 15/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Owner Alias steve f Closed TRUE I N S-0003441-20 Type Plumbing Subtype Plumbing Gas Tag Status Pass/Accepted Permit 0015-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004537-20 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0026-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0009138-20 Type Mechanical Subtype Final Mechanical Status Accepted as Noted Permit 0098-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0009187-20 Type Electric Subtype Rough Electrical Status Accepted as Noted Permit 0095-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0009189-20 Type Electric Subtype Permanent Service Status Pass/Accepted Permit 0095-2020-ELEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0009190-20 Type Electric Subtype Special Electrical Status Accepted as Noted Permit 0095-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0009191-20 Type Electric Subtype Underground Status Pass/Accepted Permit 0095-2020-ELEC Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0009192-20 https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 16/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Type Electric Subtype Final Electrical Status Partial/Non-Complete Permit 0095-2020-ELEC Due Date Priority 2 Normal Owner Alias BClin Closed TRUE INS-0009193-20 Type Electric Subtype Bonding Status Failed/Rejected Permit 0095-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0009704-20 Type Mechanical Subtype Rough Mechanical Status Partial/Non-Complete Permit 0128-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0009705-20 Type Mechanical Subtype Mechanical Flues Status Failed/Rejected Permit 0128-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0009896-20 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0128-2020-MECH Due Date Priority 2 Normal Owner Alias stevef Closed TRUE INS-0014273-20 Type Plumbing Subtype Plumbing Waste&Vent Status Partial/Non-Complete Permit 0107-2020-PLUM Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0003705-21 Type Mechanical Subtype Rough Mechanical Status Accepted as Noted Permit 0128-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0004647-21 Type Mechanical Subtype Rough Mechanical Status Failed/Rejected Permit 0076-2021-MECH https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 17/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0004676-21 Type Mechanical Subtype Rough Mechanical Status Accepted as Noted Permit 0076-2021-MECH Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0007604-21 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0095-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0007730-21 Type Mechanical Subtype Final Mechanical Status Accepted as Noted Permit 0076-2021-MECH Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0007765-21 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0139-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0007784-21 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0142-2021-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE Milestones Review Round 1 -0290.2018.ARBK Status Approved Due Date Created Date 1/16/2020 Permit History 12/2/2024 3:26 PM User Fernando Cruz Action Changed Owner from Lisa Guida to Fernando Cruz. Related Permits 0059.2019.afsr Type Fire Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant PETER MAZEN Issue Date 6/5/2019 Last Activity Date https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 18/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition 0045-2019-RWRG Type Right of Way Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant MARTIN MATA Issue Date 10/3/2019 Last Activity Date 6/29/2020 0015-2020-PLUM Type Plumbing Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant Jacob Mauldin Issue Date 2/25/2020 Last Activity Date 11/24/2021 0026-2020-ELEC Type Electrical Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant MITCHELL HAGAN Issue Date 3/12/2020 Last Activity Date 12/2/2021 0036-2020-RWRG Type Right of Way Address 1322 SNOWBUNNY LN Work Type New Status Closed-Final Applicant MARTIN MATA Issue Date 6/29/2020 Last Activity Date 1/24/2023 0095-2020-ELEC Type Electrical Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant FEDERICO VALENZUELA Issue Date 6/18/2020 Last Activity Date 12/2/2021 0128-2020-MECH Type Mechanical Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant JAKE HEUER Issue Date 7/6/2020 Last Activity Date 11/23/2021 0081-2020-BCHO Type Change Order Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant MARTIN MATA Issue Date 3/17/2021 Last Activity Date 0139-2020-ELEC Type Electrical Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant MIKE TIERNEY Issue Date 9/14/2020 Last Activity Date 12/2/2021 0107-2020-PLUM Type Plumbing https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 19/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant Jacob Mauldin Issue Date 10/16/2020 Last Activity Date 5/13/2021 0076-2021-MECH Type Mechanical Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant LINDSEY LATHAM Issue Date 4/6/2021 Last Activity Date 12/2/2021 0072-2021-PLUM Type Plumbing Address 1320 SNOWBUNNY LN Work Type New Status Cancelled Applicant Jacob Mauldin Issue Date Last Activity Date 0142-2021-MECH Type Mechanical Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant Jacob Mauldin Issue Date 12/3/2021 Last Activity Date 12/3/2021 0035-2021-BCHO Type Change Order Address 1320 SNOWBUNNY LN Work Type New Status Closed-Final Applicant MARTIN MATA Issue Date 11/16/2021 Last Activity Date 11/16/2021 Reviews REV-010868 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Parks Due Date Completed Date 2/5/2019 9:08 AM Owner Alias DRade On Hold Created Date 1/16/2020 REV-010869 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 5/5/2019 9:08 AM Owner Alias rmagi On Hold Created Date 1/16/2020 REV-010870 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Sanitation Due Date Completed Date 1/16/2020 9:09 AM Owner Alias PMohr On Hold Created Date 1/16/2020 REV-010871 https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 20/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Milestone Review Round 1-0290.2018.ARBK Status Approved Type Engineering Water Due Date Completed Date 7/3/2019 9:10 AM Owner Alias SWilson On Hold Created Date 1/16/2020 REV-010872 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Engineering CMP Due Date Completed Date 5/20/2019 9:11 AM Owner Alias AReed On Hold Created Date 1/16/2020 REV-010873 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Engineering Dev Due Date Completed Date 6/18/2019 9:11 AM Owner Alias JDann On Hold Created Date 1/16/2020 REV-010874 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Engineering Erosion&Sediment Due Date Completed Date 1/16/2020 9:12 AM Owner Alias AReed On Hold Created Date 1/16/2020 REV-010875 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Fire Due Date Completed Date 3/11/2019 9:28 AM Owner Alias JHahn On Hold Created Date 1/16/2020 REV-010876 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Zoning Due Date Completed Date 6/25/2019 9:13 AM Owner Alias SVarg On Hold Created Date 1/16/2020 REV-010877 Milestone Review Round 1-0290.2018.ARBK Status Approved Type Building Due Date Completed Date 6/20/2019 9:28 AM Owner Alias JHahn On Hold Created Date 1/16/2020 Submissions COVID Site Safety Plan-1320 Snowbunny-SIGNED.pdf Actions Submission Date 4/23/2020 1:53 PM Status https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 21/23 12/2/24,3:26 PM 0290.2018.ARBK—Salesforce-Enterprise Edition Required Description Covid Site Safety Plan-1320 Snowbunny-Updated.pdf Actions Submission Date 4/24/2020 2:25 PM Status Required Description 50.Stormwater.BMP agreement.1320 Snowbunny Ln.20211117.pdf Actions Upload Submission Date Status Required Description 40.Stormwater Maintenance Plan.1320 Snowbunny.20211203.pdf Actions Upload Submission Date Status Required Description 80.As-Built Survey.1320 Snowbunny Ln.20211203.pdf Actions Upload Submission Date Status Required Description 80.Survey Roof Height Verification.1320 Snowbunny.20211203.pdf Actions Upload Submission Date Status Required Description 40.Stormwater Maintenance Plan.1320 Snowbunny.20211203.pdf Actions Upload Submission Date Status Required Description 80.As-Built Survey.1320 Snowbunny Ln.20211203.pdf Actions Upload Submission Date Status Required Description 80.Survey Roof Height Verification.1320 Snowbunny.20211203.pdf Actions Upload Submission Date Status Required Description 1320 Snowbunny Ln-0290.2018.ARBK CO.pdf Actions Submission Date 12/7/2021 7:28 AM Status Required Description 0290.2018.ARBK_Salesforce-Enterprise Edition.pdf Actions Submission Date 12/7/2021 7:28 AM Status Required Description https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 22/23 12/2/24,3:26 PM 0290.2018.ARBK--Salesforce-Enterprise Edition Copyright©2000-2024 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000kZrtLAAS/p 23/23