Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0320.2017 (11).ARBK 0320-2017-ARBK_BuildingComments_3 ArchPlanSet.209EBIeeker.2018.09.pdf(1) iiil - ::.,e...... Page:A6.2 DETAILS fire caul ere fire ♦y' I File Name: ArchPlanSet.209EBleeker.2018.09.pdf rated Providem fire caul board) `"�°""�" ` Subject: PlanCheck terminates a �.ncgrete/ T \ _ Co nickt r Color: ■ Note added to FIRE_ .SEPERATION DETAIL A g detail 9/A6.2 1 1,RESCheck.209EBleeker.2018.09.pdf(1) Page: 1 Revise Rescheck R value • File Name: RESCheck.209EBleeker.2018.09.pdf Subject: PlanCheck match your details on t • plans. mimiAuthor: nickt Wall assemblies on . :ns are Color: • calling for R38.5 a►. R25 cavity See revised insulation. 10/A . calls for R-60 assemblies on cavity insulat': in the overhang floor. sheets A5.1 & A5.2 R-REMP.209EBleeker.2018.09.pdf(1) Page: 2 .wa�. File Name: R-REMP.209EBleeker.2018.09.pdf You have entered all of you panels together in the s.- e Subject: PlanCheck s41 Author: nickt group.You have pan_ facing i Color: • south, east, and w_. (0,45, 45 orecroanes from south); and 6:12 or 12:12. Revise ' MPworksheet —�-°° .ap.=,....=ou A. ,, Roof plan (A2.4) revised to match yo roof plan. For the to only show required DC side c .acity, mulitply the :F.4 -•-------;--2. -�- solarpanelsper REMP number .f panels in a group by the p. el rating (335w). For worksheet Inv: ter capacity, multiply the n ber of panels in a group by e inverter rating (320w). RECEIVED 11/15/2018 ASPEN BUILDING DEPARTMENT