HomeMy WebLinkAboutFile Documents.720 W Smuggler St.0036.2019.ARBK DATE: MASTER PERMITL, PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT olo
i400
441.0
BUILDING PERMIT APPLICATION CITY OF ASPEN
PROPERTY INFORMATION > /
ADDRESS 7 'O I). Vet&�iLFL2 '`Ji UNIT# PARCEL ID# L 7-c5 -/ i' /-L 6 - cc
TRACT
LOT BLOCK / el OR SUBDIVISION(71Z-I(ct 11"--A I- A.e.SPfS-{\) -i—c ) kli_--
OWN(NAME 4.-` cLe__L1‹ CELL o EMAIL
BEST CONTACT l�)l(._ cZ-c._A kki_xx,t= t`(E_/J CELL g7 Cj C3 6/ I(�� EMAIL LA_NC_Ci'�.Q- Q ��•t1
-LtA-AA TLIrr__1 •/t,4-1
NAME
J
PROJECT DETAILS (READ DE FINITIONS BELOW) OPETEDI NITSENTIRETY
WEOSCI DETAILaJifl e 4rriINF4/___ ,�D 1T Z3q. Z.[,(S . r Z_13/<- . ,41,i>I-VTC1 4j RD
<-2. tt_ or Lti..301t-fr-- -&41 rIC, ,G(IIGTPA r./1 Cr CUE-- /c(u / K.* c c' 1s, Plr.�r)�4 1
x-i�k.IL-�. '5 W-� A 1 A -Pc �vr� wof�►< .
PROJECT Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION ,71/65 `i OZ.y7
❑ Commerical ❑ New Toilets,Bidets Major Engineering Review
SQ FT OF 0 Multi-Family 0 Addition ``Bathtub • Projects involving less than 50%
BUILDING
EA L/ Z_X. ID Single Family 0 Alteration Lavatory(Wash Basin) hardscape area and work affecting
WShower 75%or greater of unit sq ft
0 Mixed-Use 0 Repair
/ Kitchen Sink(+Disposal) •Projects involving greater than
UNIT SQ FT 0 0 I FF R / Dishwasher 50%hardscape area and work
LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink 1 affecting 50%or greater of unit
(SQ FT) Will there be 0 Demolition / Clothes Washer sq ft
SQ FT OF SOIL any roof/wall 13 Change Order (7' Floor Sink ' •Projects involving 1,000+sq ft of
DISTURBANCE �� * penetrations? 0 _Floor Drain soil disturbance area
121 Yes Water Heater(Pan Req)
NEW SQ FT 975 ❑ No #Gas Outlets Water Efficient Landscaping
_Water Treatment •Projects that trigger a major
BUILDING Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
HARDSCAPE or construction authorized is not commenced within alterations affecting 50%or more
AREA 180 days,or if construction or work is suspended or of exisitingsquarefootage
abandoned for a period of 180 days at any time after gross g
ZONE /J work is commenced.
DISTRICT /`^6 ,
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
0 Unit Sq Ft:Gross square footage,not FAR,of permitted unit.
p Lot Size:Total surveyed square footage of property.
Z Sq Ft of Soil Disturbance:Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review sign-Off Approved
L.T. Building Footprint:Grade floor square footage of the permitted structure. PC
0 Hardscape Area:Square footage of impervious lot surface.
Zone District: Underlying zone district of permitted parcel. Zoning
HPC
Building TF 2/28/19
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Engineering
Review Permit Fee Parks Impact CMP
Engineering Zoning School Lands Water
Review Review(50%) Dedication Stormwater
Zoning CMP(50%)
Review(50%) TDM Impact Sanitation
-
Energy Code REMP Pedestrian Env. Health
Review Payment Amenity Parks
CMP(50%) GIS Housing Cash in Lieu Landscape
City Use Efficiency
Parks Review 3
Tax Water Tap Approved UHIVI //1 U/1
Cou
Utility Review T�X Use Sanitation To Issue l •
Issuance 1 le-_ 4
CITY OF ASPEN January2019 130 S. GALENA ST ASPEN, Co2giti.21y19
ASPEN
BUILDING DEPARTMENT