HomeMy WebLinkAboutFile Documents.720 W Smuggler St.0198.2019.ARBK DATE:08/29/2019 MASTER PERMIT: PERMIT NUMBER: 0198 . 2019 .ARBK
COMMUNITY DEVELOPMENT DEPARTMENT 14
BUILDING PERMIT APPLICATION 4
` CITY OF ASPE N
PROPERTY INFORMATION
ADDRESS720 W. Smuggler Street Aspen, CO. 81 UNIT# PARCEL ID# 2735-124-06-002
LOTP & BLOCK14 TRACBDIVISIONOriginal Aspen Townsite
OWNER NAMEEISenbrOOk CELL EMAIL
BEST CONTACTJoe Lawrenz CELL(303) 704-6145 EMAILJlawrenz@blueriverconstruction.net
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) COMPLETIONMUSE T
COMPLETED IN ITS ENTIRETY
DESCRIPTION
DETAIL Remodel 4 bathrooms not included in original scope of work - new cabinetry. fixtures and `
lighting/switching design. Apply new tile veneer at lower level fireplace, no change to appliance.
PROJECT 445000 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑ New 6 Toilets,Bidets Major Engineering Review
SQFTOF ❑ Multi-Family El Addition ' Bathtub •Projects involving less than 50%
BUILDING 450 • Single Famil Lavatory(Wash Basin) hardscape area and work affecting
WORK AREA g y ❑ Alteration 0 Mixed-Use 0 Repair 0Shower 75%or greater of unit sq ft
c UNIT SQFT 4109 0 0 IFFR Kitchen Sink(+Disposal) •Projects involving greater than
Dishwasher, 50%hardscape area and work
LOT SIZE 6000 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit
(SQFT) Will there be 0 Demolition Clothes Washer sq ft
sO3FTOFSOIL any roof/wall • Change Order U Floor Sink •Projects involving 1,000+sq ft of
DI TURBANCE 0 penetrations? 0 i Floor Drain soil disturbance area
0 Yes Water Heater(Pan Req)
NEW SQ FT 0 • No v #Gas Outlets Water Efficient Landscaping
Water Treatment •Projects that trigger a major
BUILDING Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
HARDSCAPE or construction authorized is not commenced within alterations affecting 50%or more
AREA 180 days,or if construction or work is suspended or
abandoned for a period of 180 days at any time after of exisiting gross square footage
ZONE R6 work is commenced.
DISTRICT •. i
Project Valuation:Cost of project as defined in Valuation Affadavit.
ZSq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC x 11 9/16/1 )
0 Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning x SV 09.16.19
HPC
Building x tf 10/2/1)
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Engineering
Review Permit Fee 25 . 00 Parks Impact
CMP
Engineering Zoning 162.50 School Lands Water x S W 9/2 3/1
Review Review(50%) Dedication Stormwater
Zoning CMP(50%) TDM Impact Sanitation x CS 10/4/19
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review Payment Amenity Parks
CMP(50%) GIS Housing Cash in Lieu Landscape
Parks Review City Use Water Tap Efficiency
Tax Approved
County Use To Issue
Utility Review Tax Sanitation
Issuance
( CITY OF ASPEN January v9/rro61
130 S. GALENA ST ASPEN, CO 81611