Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.1250 Snowbunny Ln.0040.2018 (27).ARBK
CITY OF ASPEN WATER UTILITY DEVELOPMENT REVIEW FEE ECU CALCULATION WORKSHEET FOR REMODEL DATE: PERMIT# NAME: ACCT.# ADDRESS: NUMBER OF TOTAL PROPOSED NUMBER OF FIXTURES TO NUMBER OF NUMBER OF ECU COUNT ECU EXISTING EXISTING BE NEW WATER FOR FIXTURE RATE FIXTURES* ECU COUNT REMOVED FIXTURES FIXTURES REMODEL (A) (B) (C) (D) BEDROOM 0.10 0 0 0 tub/shwr,toilet,lay=1st Bath 0.36 0 0 0 tub/shwr,toilet,lay=2nd Bath 0.24 0 0 0 TOILETS/URINALS/BIDETS 0.05 4 0.2 4 0.2 LAV 0.02 5 0.1 5 0.1 TUB/SHOWER 0.05 3 0.15 3 0.15 TUB ONLY 0.05 0 0 0 TUB OVERSIZED 0.02 0 0 0 WHIRLPOOL UPGRADE 0.05 0 0 0 SHOWER STALL 0.05 1 0.05 1 2 0.1 STEAM ROOM/SHOWER 0.08 0 0 0 STEAM SHOWER UPGRADE 0.03 0 1 1 0.03 KITCHEN 0.25 0 0 0 DISHWASHER 0.10 1 0.1 1 0.1 DISPOSAL 0.05 1 0.05 1 0.05 ADD KITCHEN SINK/POT FILLER 0.05 0 0 0 KITCHEN/EFF. 0.15 0 0 0 BAR/HAND SINK 0.05 1 0.05 1 0.05 ICE MACHINE 0.05 1 0.05 1 0.05 WASHER 0.10 1 0.1 1 2 0.2 LNDRY/UTIL.SINK/DOG WASH 0.05 0 0 0 1st HOSE BIB 0.20 1 0.2 1 0.2 2nd HOSE BIB 0.10 1 0.1 1 0.1 ADD HOSE BIB 0.05 0 0 0 HOT TUB/@100 GAL 0.02 1 0.02 1 0.02 ADD LANDSCAPE/100 SQ FT 0.01 5 0.05 5 0.05 POOL/1000 GAL/YEAR ROUND 0.02 0 0 0 TOTAL ECU COUNT 1.22 1.4 INCREASE IN ECU COUNT DUE TO REMODEL 0.18 TOTAL DEVELOPMENT REVIEW FEE 03/07/2018 ASPEN BUILDING DEPARTMENT