HomeMy WebLinkAboutFile Documents.506 E Main St.0010-2022-BCOM AN DERSON
HALLAS
ARCHITECTS
Building Permit Phase I change order
Date:2020.5.07 0
Project Name: 2017910 Pitkin County Courthouse Remodel
506 East Main Street,Aspen, Colorado
a
Permit Number:0054.2019.ACBK
Code:2015 IEBC, IBC
Reviewer: Bonnie Muhigirwa
Plans Examiner o
Community Development o
0
U
The following sheets have been updated to reflect site conditions and changes made during
Phase I construction at the Pitkin County Courthouse. Drawings updates will be made at the o
conclusion of each successful phase of construction.
I-
w
Architectural
I-
A1.0: 1 Garden Level Floor Plan V)
• Resize Office 2/02B
• Visiting Judge's Chambers 04/Hall 16 new door and hall and orientation into
Courtroom 3/05 0
• Courtroom 3/05 new duct orientation in SE corner
• Holding 06 delete door
A1.1: 1 Main Floor Plan
w
co
co
• Family Court and Collections 102B new duct orientation
03
• Office 4/101E new duct orientation
M
• Office 2/108C new ducten
• Office 2/105B new duct orientation and new wall alignment
A1.2: 1 Second Level Floor Plan }
2
• District Judge's Chamber 201B new duct orientation
• Court Reporter 206 new duct orientation
• Jury Deliberation 204 new duct orientation w
• County Courtroom 203 new duct orientation
A7.3: 1 Garden Level Lift plan m
• Decreased the length of the handrails to code minimum a
• Altered location of the post mounted automatic accessible door button location u
Civil RECEIVED
02/02/21022
ASPEN
BUILDING DEPARTMENT
F-
U
C1.0 Existing Conditions Map Add sheet list table
C1.1 Existing Conditions map added
C3.0
• Fire lane reduced to 20'
• Flexible spring-base bollards have been called out to protect fire lane
• Storm line alignment from trench drain revised
• Limits of concrete sidewalk reconstruction revised
• Landscape area updated a
C4.0
• Point elevations added at all corners of ramp landing. 2
• Slope of ramp has been reduced to 8.25%
• Limits of grading revised for sidewalk construction
C6.0 o<a
a
• Grass paver detail added
• Drywell detail removed
• Pedestrian curb details revised
• Pervious paver details added and revised o
• Composite grass pacer detail added 00
0
C7.0
w
CI
• Tree Protection fencing shown at dripline and at the walkways
• Limits of construction fence and silt fence revised.
F
w
w
Structural
S2.0
w
LU
• Key Note 2 and 6
• 1 Garden Level plan notes o
u_
S2.1
• Keynote 2 and 6
• 1 Main Level
• 2 Main Level lift Plan
co
N
S2.2: Keynote 2 and 6
S3.0: 6 Typ Landing Edge Support
S3.1
• 2 Lift Slab Step
• 5 Main Level Floor Framing
S3.2
w
• 2 Top Landing Header
• 4 Lower Landing Braced Frame
• 8 Upper Landing Braced Frame
• 10 Upper Landing at Existing Building LL
S3.3
• 3 Type Exposed Lintel RECEIVED
02/02/22022
ASPEN
BUILDING DEPARTMENT
F-
U
• 4 Rod Brace Anchorage
• 6 RFI 64 Elevator Threshold Detail
Mechanical
MO.2
• Revised the water temperature of CUH-1
• Added CUH-2, CUH-7
MO.3: add exhaust fan schedule
MO.4
• Revised the baseboard radiators piping detail o
• Added cabinet unit heater coil connection details
• Added snowmelt piping diagram
a
MO.6: Added this sheet for Fin Tube radiator schedule
M D1.1
• Demolished existing fin tube radiators and hallway cabinet unit heaters. Demolished all
HWS/R branch piping o
• Removed additional branch duct. Existing diffuser remains and reconnected in new
work. o
• Adjusted main HWS/R at southeast and northwest corners for the new return airLU
ductwork. o
• Demolished main HWS/R at future lift and south hallway.
• Adjusted key notes as necessary for changes of scope noted above
• Added General Note LU
V)
MD1.2 V'
• Removed an additional existing air device w
• Demolished existing fin tube radiators and hallway cabinet unit heaters. Demolished all
HWS/R branch piping o
• Adjusted key notes as necessary for changes of scope noted above
• Added General Note
• Added keynote 11
MD1.3 co
• Noted the thermostat for VAV 4 to be relocated M
• Demolished existing fin tube radiators and hallway cabinet unit heaters. Demolished all en
M
HWS/R branch piping
• Adjusted key notes necessary for changes of scope noted above }
• Added General Note
MD1.4
• Modified ductwork for VAV 14 W
• Remove HWS/R branch piping no longer necessary
• Added keynote 5 m
M1.0: Revised site plan and snow melt piping design I-
LL
M1.1
ce
• Modified the ductwork over Judge RR 14 RECEIVED• Added new branch duct in Visiting Judge's Chamber 04
02/02/23022
ASPEN
BUILDING DEPARTMENT
F-
U
• Added fire/smoke dampers at supply are shafts
• Added new fin tube radiators and associated HWS/R branch piping and thermostats.
• Add hallway CUH-2,3,4
• Adjusted located of CUH for the Lift Lobby. Added supply diffusers and return grille
from CUH to serve Hall 16
• Rotated return air ductwork the southeast and northwest corners
• Adjusted key notes as necessary for changes of scope noted above w
• Added General Notes a
• Added General Description of Changes Q
M1.2
• Modified return air path Office 4/101E o
• Modified the supply air ductwork at Waiting /Self Hel 102A
• Modified the return air path Office 2/105B
• Modified the supply air and return air at Office 1 /108E a
• Added new fin tube radiators and associated HWS/R branch piping i in and thermostats a
• Add CUH-5&6
• Rotated return air ductwork at all (4) return air shafts
• Adjusted key notes as necessary for changes of scope noted above
0
• Added supply diffuser to file/copy 102D
M1.3 S
U
z
• Added new fin tube radiators and associated HWS/R branch ping and thermostats o
• Add CUH-7
• Rotated return air ductwork at all (4) return air shafts
LU
• Adjusted key notes as necessary for changes of scope noted above LU
M1.4 V)
• Added fire/smoke dampers at supply air ducts that serve thegarden level
p pp Y w
• Modified the ductwork for VAV 14
• Rotated return air ductwork at all (4) return air shafts and adjusted ductwork o
accordingly
• Remove HWS/R branch ping no longer necessary N
• Adjusted key notes as necessary for changes of scope noted above
• Added keynote 11 °D
co
• Corrected VAV tags on the west side of the buildings
03,
• Added General Note
M
Plumbing `"
PD1.1
• Demolished plumbing fixtures in men's restroom
• Added key note 6
P1.1
W
• Modified plumbing for new plumbing fixture in the men's restroom
• Modified waste piping routing from above in Boiler 01A
m
P1.2: Modified waste piping routing from the above Clerk Workstations 103 F
P1.3: Modified plumbing for new plumbing fixture in the men's restroom in the garden level.
ce
RECEIVED
02/02/24022
ASPEN
BUILDING DEPARTMENT
F-
U
Electrical
E1.0
• Garden Level Electrical Plan a
• Keynote Legend Notes 15, 16, 17, 18, 19 and 20
E1.1 0
• 1 Main Level Electrical Plan
• Key Note Legend Note 3
E1.2: 1 Second Level Electrical Plan
E2.0: 1 Garden Level Electrical Plan
E2.1 0
U
2
• 1 Main Level Electrical Plan
• Key Note Legend note 2 o
E2.2: 21 Second Level Electrical Plan
E6.0
• 2 Existing Electrical One-Line Diagram
• 5 Fuse Let Thru Rating o
• Fault Current Schedule o
• Key Note Legend notes 4 and 5
LU
E7.00 0
• Mechanical Equipment Schedule
• Lighting Fixture Schedule w
• Light Fixture General Notes
E7.10
w
w
• Panel A
• Panel MDP Left
0
• Panel MDP Right u__
• Load summary N
E7.11: Panel D
co
E7.12: Panel B1
ED1.0 o
• 1 Garden Level Electrical Plan Demo
• Keynote Legend No's 3,4,5
r
Per conversations with the building department, only sheets impacted with changes have been
submitted as part of the Phase I change order. All changes have been clouded and identified
with delta 8 and dated 4.2.2020.
U
z
J
CO
H
LL
RECEIVED
02/02/25022
ASPEN
BUILDING DEPARTMENT