Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0010-2022-BCOM AN DERSON HALLAS ARCHITECTS Building Permit Phase I change order Date:2020.5.07 0 Project Name: 2017910 Pitkin County Courthouse Remodel 506 East Main Street,Aspen, Colorado a Permit Number:0054.2019.ACBK Code:2015 IEBC, IBC Reviewer: Bonnie Muhigirwa Plans Examiner o Community Development o 0 U The following sheets have been updated to reflect site conditions and changes made during Phase I construction at the Pitkin County Courthouse. Drawings updates will be made at the o conclusion of each successful phase of construction. I- w Architectural I- A1.0: 1 Garden Level Floor Plan V) • Resize Office 2/02B • Visiting Judge's Chambers 04/Hall 16 new door and hall and orientation into Courtroom 3/05 0 • Courtroom 3/05 new duct orientation in SE corner • Holding 06 delete door A1.1: 1 Main Floor Plan w co co • Family Court and Collections 102B new duct orientation 03 • Office 4/101E new duct orientation M • Office 2/108C new ducten • Office 2/105B new duct orientation and new wall alignment A1.2: 1 Second Level Floor Plan } 2 • District Judge's Chamber 201B new duct orientation • Court Reporter 206 new duct orientation • Jury Deliberation 204 new duct orientation w • County Courtroom 203 new duct orientation A7.3: 1 Garden Level Lift plan m • Decreased the length of the handrails to code minimum a • Altered location of the post mounted automatic accessible door button location u Civil RECEIVED 02/02/21022 ASPEN BUILDING DEPARTMENT F- U C1.0 Existing Conditions Map Add sheet list table C1.1 Existing Conditions map added C3.0 • Fire lane reduced to 20' • Flexible spring-base bollards have been called out to protect fire lane • Storm line alignment from trench drain revised • Limits of concrete sidewalk reconstruction revised • Landscape area updated a C4.0 • Point elevations added at all corners of ramp landing. 2 • Slope of ramp has been reduced to 8.25% • Limits of grading revised for sidewalk construction C6.0 o<a a • Grass paver detail added • Drywell detail removed • Pedestrian curb details revised • Pervious paver details added and revised o • Composite grass pacer detail added 00 0 C7.0 w CI • Tree Protection fencing shown at dripline and at the walkways • Limits of construction fence and silt fence revised. F w w Structural S2.0 w LU • Key Note 2 and 6 • 1 Garden Level plan notes o u_ S2.1 • Keynote 2 and 6 • 1 Main Level • 2 Main Level lift Plan co N S2.2: Keynote 2 and 6 S3.0: 6 Typ Landing Edge Support S3.1 • 2 Lift Slab Step • 5 Main Level Floor Framing S3.2 w • 2 Top Landing Header • 4 Lower Landing Braced Frame • 8 Upper Landing Braced Frame • 10 Upper Landing at Existing Building LL S3.3 • 3 Type Exposed Lintel RECEIVED 02/02/22022 ASPEN BUILDING DEPARTMENT F- U • 4 Rod Brace Anchorage • 6 RFI 64 Elevator Threshold Detail Mechanical MO.2 • Revised the water temperature of CUH-1 • Added CUH-2, CUH-7 MO.3: add exhaust fan schedule MO.4 • Revised the baseboard radiators piping detail o • Added cabinet unit heater coil connection details • Added snowmelt piping diagram a MO.6: Added this sheet for Fin Tube radiator schedule M D1.1 • Demolished existing fin tube radiators and hallway cabinet unit heaters. Demolished all HWS/R branch piping o • Removed additional branch duct. Existing diffuser remains and reconnected in new work. o • Adjusted main HWS/R at southeast and northwest corners for the new return airLU ductwork. o • Demolished main HWS/R at future lift and south hallway. • Adjusted key notes as necessary for changes of scope noted above • Added General Note LU V) MD1.2 V' • Removed an additional existing air device w • Demolished existing fin tube radiators and hallway cabinet unit heaters. Demolished all HWS/R branch piping o • Adjusted key notes as necessary for changes of scope noted above • Added General Note • Added keynote 11 MD1.3 co • Noted the thermostat for VAV 4 to be relocated M • Demolished existing fin tube radiators and hallway cabinet unit heaters. Demolished all en M HWS/R branch piping • Adjusted key notes necessary for changes of scope noted above } • Added General Note MD1.4 • Modified ductwork for VAV 14 W • Remove HWS/R branch piping no longer necessary • Added keynote 5 m M1.0: Revised site plan and snow melt piping design I- LL M1.1 ce • Modified the ductwork over Judge RR 14 RECEIVED• Added new branch duct in Visiting Judge's Chamber 04 02/02/23022 ASPEN BUILDING DEPARTMENT F- U • Added fire/smoke dampers at supply are shafts • Added new fin tube radiators and associated HWS/R branch piping and thermostats. • Add hallway CUH-2,3,4 • Adjusted located of CUH for the Lift Lobby. Added supply diffusers and return grille from CUH to serve Hall 16 • Rotated return air ductwork the southeast and northwest corners • Adjusted key notes as necessary for changes of scope noted above w • Added General Notes a • Added General Description of Changes Q M1.2 • Modified return air path Office 4/101E o • Modified the supply air ductwork at Waiting /Self Hel 102A • Modified the return air path Office 2/105B • Modified the supply air and return air at Office 1 /108E a • Added new fin tube radiators and associated HWS/R branch piping i in and thermostats a • Add CUH-5&6 • Rotated return air ductwork at all (4) return air shafts • Adjusted key notes as necessary for changes of scope noted above 0 • Added supply diffuser to file/copy 102D M1.3 S U z • Added new fin tube radiators and associated HWS/R branch ping and thermostats o • Add CUH-7 • Rotated return air ductwork at all (4) return air shafts LU • Adjusted key notes as necessary for changes of scope noted above LU M1.4 V) • Added fire/smoke dampers at supply air ducts that serve thegarden level p pp Y w • Modified the ductwork for VAV 14 • Rotated return air ductwork at all (4) return air shafts and adjusted ductwork o accordingly • Remove HWS/R branch ping no longer necessary N • Adjusted key notes as necessary for changes of scope noted above • Added keynote 11 °D co • Corrected VAV tags on the west side of the buildings 03, • Added General Note M Plumbing `" PD1.1 • Demolished plumbing fixtures in men's restroom • Added key note 6 P1.1 W • Modified plumbing for new plumbing fixture in the men's restroom • Modified waste piping routing from above in Boiler 01A m P1.2: Modified waste piping routing from the above Clerk Workstations 103 F P1.3: Modified plumbing for new plumbing fixture in the men's restroom in the garden level. ce RECEIVED 02/02/24022 ASPEN BUILDING DEPARTMENT F- U Electrical E1.0 • Garden Level Electrical Plan a • Keynote Legend Notes 15, 16, 17, 18, 19 and 20 E1.1 0 • 1 Main Level Electrical Plan • Key Note Legend Note 3 E1.2: 1 Second Level Electrical Plan E2.0: 1 Garden Level Electrical Plan E2.1 0 U 2 • 1 Main Level Electrical Plan • Key Note Legend note 2 o E2.2: 21 Second Level Electrical Plan E6.0 • 2 Existing Electrical One-Line Diagram • 5 Fuse Let Thru Rating o • Fault Current Schedule o • Key Note Legend notes 4 and 5 LU E7.00 0 • Mechanical Equipment Schedule • Lighting Fixture Schedule w • Light Fixture General Notes E7.10 w w • Panel A • Panel MDP Left 0 • Panel MDP Right u__ • Load summary N E7.11: Panel D co E7.12: Panel B1 ED1.0 o • 1 Garden Level Electrical Plan Demo • Keynote Legend No's 3,4,5 r Per conversations with the building department, only sheets impacted with changes have been submitted as part of the Phase I change order. All changes have been clouded and identified with delta 8 and dated 4.2.2020. U z J CO H LL RECEIVED 02/02/25022 ASPEN BUILDING DEPARTMENT