Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0015-2022-BCHO AN DERSON HALLAS ARCHITECTS Phase III change order Date:2022.03.14 0 Project Name: 2017910 Pitkin County Courthouse Remodel 506 East Main Street,Aspen, Colorado a Permit Number:0054.2019.ACBK Code:2015 IEBC, IBC The following sheets have been updated to reflect changes to construction drawings dated 4/3/2019. Please note that all changes to the approved plans are clouded and tagged as delta o 10 "Phase III Changes 3/11/2022." o U Architectural G0.4 Code Summary C) • Code reference has been updated to reflect the 2020 International Electrical Code. • Construction type is confirmed as type IIIB. AD1.2: Second Floor Demo Plan • Drawing 1 - Second Floor Plan - Demo has been updated to reflect the following o District Court 201: Removal of all existing furniture and built-in casework o Women 200E: Demo of existing closet o A1.0: 1 Garden Level Floor Plan 00 • New framed wall built within Holding 06. Provide new door 13B. co • Men OOD, remove and replace existing bathroom floor tile. 03 N • Women OOC, remove and replace existing bathroom floor tile o M A1.2: 1 Second Level Floor Plan >- • Revised District Court Layout201 2 o Jury box has been enlarged o Jury rail and screen to be enlarged in-kind to accommodate increased jury box. o Entrance alcove wall to be relocated. Central location of the wall to be increased to a height of 9' to permit installation of court provided AV equipment. m o Floor boxes to be relocated per new furniture layout F o Existing bookcases to be removed on west and south wall. ce o Relocate gallery benches. 0 o Provide power, framing and new accessible lift equipment. RECEIVED o Door 206A to be enlarged to provide 32" clear min. o Furniture layout has been revised by courts. 03/22/21022 ASPEN BUILDING DEPARTMENT F- U • Revised County Courtroom 203 o District court judge's bench to be reconfigured o Audience rail to be relocated. Accessible approach to door 203 to be maintained. • County Judge's Chamber 202B: Relocate door 202B to the west wall. • Revised Women's Restroom 200E o Provide new wall and floor tile. o Provide framing for new closet 200F with new door 200F. a o Reconfigure Jury RR 204A. a • Door between Jury RR 204A and Attorney 205 to be constructed per attached details. • Attorney Room 207 to be reconfigured into In-Custody 207 o Door 202 has been eliminated 2 0 o Provide new door 207B in framed wall construction. o Provide new linoleum floor and Acrovyn wall surfaces. o Provide new gypsum ceiling at 8'-0". a o Provie new ligature resistant combination, stainless steel water closet and sink. a o Provide ligature resistant, tamper resistant bathroom accessories. A3.0 Finish Schedule and Plans 0 • Revise finish schedule to show new floor tile in women OOC, men OOD, men 113, women 03 114 U A3.1 Finish Schedule & Plans 0 • Revise finish schedule to reflect linoleum floor and Acrovyn wall surfaces in new In- Custody RR 207. • Revise finish schedule to reflect new floor tile in Women 200E. A5.0 Door Schedule I- z • Revise doors schedule to show new door 13B as a 3'0" door I- • Revise door schedule to show new door 200F • Revise door schedule to show enlarged door opening 206A. New door to be 3'-0". o A7.0 Exterior Stair Elevation • Drawings 4 & 5, provide the following note, "STL STRINGER, REF STRUC. NOTE: STAIR co RISER TO CLOSE OPENING BETWEEN RISER AND GUARDRAIL. OPENING SHALL NOT co co ALLOW FORA 4"DIAMETER SPEHERE TO PASS BETWEEN RISER& GUARD RAIL." N A7.1 Enlarged Plans/ Egress Stair o en • Drawings 1, 2 and 3, add the following note, "NOTE:ALL HARDRAILS SHALL RETURN TO GUARDRAIL OR WALK." >- A7.6 Enlarged Plan Grand Staircase • Drawing 2, 5 and 7 add the following note, "NOTE:ALL HANDRAILS SHALL RETURN TO WALL." z A9.1 Courtroom Millwork m • Drawings 1, 2, 3, 4, 5, 6, 7 see revised courtroom millwork. LL A9.10 RR Interior Elevations: u • See drawing 1 for revised RR204A layout. New layout incorporates new closet 2cREC IVED 03/22/22022 ASPEN BUILDING DEPARTMENT F- U • See drawings 2 &3 revised RR 204 interior elevations. A9.13 RR Interior Elevations • Drawings 6 Courtroom 201 North Wall Elevation: updated drawings illustrate new half-height wall that supports new lift access from door 201B to the judge's platform. • Drawing 7 Courtroom 201 East Wall Elevation: the new elevations illustrates work to be done at the existing framed "alcove" wall. The existing wall shall be removed, salvaged and relocated south to provide additional clearance at new door 201E. A 6'-9 1/2" section of the wall will be reframed. This new section of wall will have blocking and AV for new equipment to be provided by the Courts. A9.14 RR Interior Elevations o • 1 In Custody RR 207 enlarged floor plan a • Drawings 2, 3, 4 and 5 illustrate proposed In-Custody RR interior elevations. All walls to be covered in Acovyn wall panels. Acrovyn is a sturdy, clean, wipeable surface (similar to FRP). The Acrovyn is used in situations where the panels need to be stronger than FRP. A9.15 District Court 201 03 • 1 District Court 201 0 o Plan illustrates proposed accessible routes o o Relocation of the audience rail 0 F- w o Relocation of the entrance alcove I- o Enlargement of the jury box. An accessible entrance and seating location are shown within the jury box. w H o New power and lift will be installed as part of the Phase II construction. 0 o Door 206A to be modified to provide a 36" wide door • 2 and 3 District Court In-West: images graphically illustrate the intent to enlarge the existing jury box. The current jury box is on an elevated platform. The first row of 00 chairs will be at the finish floor elevation. The second row of seats will be on a raised co platform, 6.5" above the finish floor level. 03 N M 0 M Mechanical/Plumbing r MO.3 Mechanical Schedules: updated fan schedule with EF-5 MO.5 Ventilation Schedules: Updated air calculation • Secure Hallway 202 z • Restroom 207 m M1.3 Second Floor Mechanical Plan: drawing 1 Second Level Mechanical Plan - new fan I- LL location in In-Custody RR 207. ce RECEIVED 03/22/23022 ASPEN BUILDING DEPARTMENT F- U M1.4 Attic Mechanical Plan: drawing 1 Attic Mechanical Plan — new fan location above In- Custody 207. P0.2 Plumbing Schedules & Isometric g • Plumbing Schedule: P-1HL, BF-1 • Drawing 4, Southwest Plumbing fixture waste and vent isometric w • Drawing 6, Restroom 207 waste and vent isometric a P12 Main Level Plumbing Plan: Main Level Plumbing Plan • New plumbing layout for Jury RR 204A o • New plumbing layout for In-Custody 207 0 P1.3 Second Floor Plumbing Plan: Second Level Plumbing Plan • New plumbing plan for Jury RR 204A • New plumbing layout for In-Custody 207 P1.4 Attic Plumbing Plan: Attic Plumbing Plan new vent tie-in o 03 P3.1 Enlarged Scale Plumbing Plans o • Revised keynotes 8, 9, 10, 11, 12, 13 a • Drawing 2 Enlarged Scale Main Level Plumbing Plan 0 Lu • Drawing 4 Enlarged Scale Second Level Plumbing Plan Lu V) Electrical ED1.2 Second Level Electrical Plan Demo: Drawing 1 Second Level Electrical Plan see revised o power locations in District 207, Jury RR 204A, In Custody RR 207 and County Court 203. E1.2 Second Level Electrical Pan: Drawing 1 Second Level Electrical Plan see revised power locations in District 207, Jury RR 204A, In Custody RR 207 and County Court 203. 00 co E2.2 Second Level Lighting Plan: see drawing 1 with new lighting in Jury RR 204A and In- 03 Custody 207 M 0 m E7.00 Electrical Schedules • Revised Light Fixture Schedule 2 • Revised Lighting Fixture Specific Notes • Revised Mechanical Equipment Schedule W • Revised Mechanical Equipment Specific Notes E7.11 Electrical Panel Schedules °' I- LL • Revised panel D ce • Revised panel E RECEIVED 03/22/24022 ASPEN BUILDING DEPARTMENT • m U' m a I- O 0 a C 3 3 Q RECEIVED N CRAFT BALANCE WHIMSY 303 278 4378 715 FOURTEENTH STREET,GOLDEN,CO 80401 ANDARCH.COM ANDERSONHALLASAQC1/ Z/2 022 ASPEN BUILDING DEPARTMENT