Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0054.2019 (5).ACBK AN DERSON HALLAS ARCHITECTS Building Permit Phase III change order Date:2022.7.27 0 Project Name: 2017910 Pitkin County Courthouse Remodel 506 East Main Street,Aspen, Colorado a Permit Number:00015-2022-BCHO Code:2015 IEBC, IBC Reviewer: Denis Murray Plans Examiner o Community Development o 0 U The following sheets have been updated to reflect site conditions and changes made during Phase III construction at the Pitkin County Courthouse. Drawings updates will be made at the o conclusion of each successful phase of construction. I- w Architectural I- A1.0: 1 Garden Level Floor Plan V) • Resize Office 02B and Break Room 02A • Door 13B added to Holding 06. A1.2: 1 Second Level Floor Plan o • Restroom layout adjusted to accommodate existing steel column within In-Custody RR 207. • District Court 201 revised °D co o Courtroom well expanded 03 o Judge's dais revised N co o Accessible path reviseden A9.1 Courtroom Millwork r • 5:A9.1 revised to reflect the following changes o Platform and stair updates o Door 201A and 201B updates o Modifications to accessible lift A9.13 RR Interior Elevations m • 7:A9.13 Courtroom 201 East Wall Elevation added to reflect the addition of AV equipment a • 6:A9.13 Courtroom 201 North Wall Elevation: revised to reflect the following changes u o Platform updates ���..?�'��� o Door 201A and 201B updates o Modifications to accessible lift 09/06/21022 ASPEN BUILDING DEPARTMENT F- U o Changes to jury box platform U A9.14 RR Interior Elevations: Restroom layout was adjusted to accommodate existing steel a column within In-Custody RR 207. z O A9.15 District Courtroom 201 • 1:A9.15 Revised to reflect the following changes Q o Platform and stair updates o Modifications to accessible lift o Judge's dais revised 2 o Courtroom well expanded ° o Accessible path revised Civil C3.0 • Snowmelt boundary revised. Note reduced snowmelt scope to include only existing snow melt on the west side of the structure. • Alternate grass paver o • Existing and new flatwork scope revision • 0 U z C4.0 • Sidewalk and landing limits adjusted to new egress stair construction • Area drain inlet added • Slab on grade stair revision C5.0 z w • North patio roof drain downspout connection D 0 U- Mechanical P1.2: Main Level Plumbing Plan - plumbing adjustments in Storage 00B P1.3: Second Level Plumbing Plan - plumbing orientation change to In-Custody RR 207. P3.1: Enlarged Scale Second Level Plumbing Plan - plumbing orientation change to In-Custody °D RR 207. Electrical O E1.0 Garden Level Electrical Plan • RFI-108 - Added receptacle for disposal. • RFI-109 - Added EWH-5 2 • RFI-121 - Updated circuiting per contractor direction. E1.1 Main Level Electrical Plan Lil z • RFI-122 - Added connection to heat trace system. a E1.2: 1 Second Level Electrical Plan u_ • RFI-102 - Added circuit for snowmelt. • RFI-107 - Added device for platform lift. RECEIVED 09/06/22022 ASPEN BUILDING DEPARTMENT U) F- U • RFI-116 - Added and relocated receptacles, tele/data, security, and access control devices per box walk changes. • RFI-121 - Added receptacles for heat mats. J E2.0: 1 Garden Level Electrical Plan • RFI-104 - Updated exit sign locations. E2.1 Main Level Lighting Plan z a • RFI-119 - Revised/added stair light fixtures. E2.2: 2 Second Level Electrical Plan • RFI-104 - Updated exit sign locations. o • RFI-116 - Updated lighting control device locations per box walk changes. • RFI-120 - Added VS1 to In Custody RR 207. E7.00 Electrical Schedules • RFI-109 - Added EWH-5 to Mechanical Equipment Schedule E7.11: Electrical Panel Schedule o co • Updated panel circuitry per changes above. 0 E7.12: Electrical Panel Schedules w 0 • Updated panel circuitry per changes above. LU Landscape LU V) L1.00 - planting zones revised L2.00 - planting zones revised w L3.00 - planting notes adjusted D 0 LL Per conversations with the building department, only sheets impacted with changes have been R submitted as part of the Phase III change order. All changes have been clouded. co co m co N N 0 ›- 2 2 w U z J Co H LL RECEIVED 09/06/23022 ASPEN BUILDING DEPARTMENT