Building Permit Phase III change order
Date:2022.7.27 0
Project Name: 2017910 Pitkin County Courthouse Remodel
506 East Main Street,Aspen, Colorado
a
Permit Number:00015-2022-BCHO
Code:2015 IEBC, IBC
Reviewer: Denis Murray
Plans Examiner o
Community Development o
0
U
The following sheets have been updated to reflect site conditions and changes made during
Phase III construction at the Pitkin County Courthouse. Drawings updates will be made at the o
conclusion of each successful phase of construction.
I-
w
Architectural
I-
A1.0: 1 Garden Level Floor Plan V)
• Resize Office 02B and Break Room 02A
• Door 13B added to Holding 06.
A1.2: 1 Second Level Floor Plan o
• Restroom layout adjusted to accommodate existing steel column within In-Custody RR
207.
• District Court 201 revised °D
co
o Courtroom well expanded 03
o Judge's dais revised N
co
o Accessible path reviseden
A9.1 Courtroom Millwork
r
• 5:A9.1 revised to reflect the following changes
o Platform and stair updates
o Door 201A and 201B updates
o Modifications to accessible lift
A9.13 RR Interior Elevations
m
• 7:A9.13 Courtroom 201 East Wall Elevation added to reflect the addition of AV
equipment a
• 6:A9.13 Courtroom 201 North Wall Elevation: revised to reflect the following changes u
o Platform updates ���..?�'���
o Door 201A and 201B updates
o Modifications to accessible lift
09/06/21022
ASPEN
BUILDING DEPARTMENT
F-
U
o Changes to jury box platform
U
A9.14 RR Interior Elevations: Restroom layout was adjusted to accommodate existing steel a
column within In-Custody RR 207.
z
O
A9.15 District Courtroom 201
• 1:A9.15 Revised to reflect the following changes Q
o Platform and stair updates
o Modifications to accessible lift
o Judge's dais revised 2
o Courtroom well expanded °
o Accessible path revised
Civil
C3.0
• Snowmelt boundary revised. Note reduced snowmelt scope to include only existing
snow melt on the west side of the structure.
• Alternate grass paver o
• Existing and new flatwork scope revision
• 0
U
z
C4.0
• Sidewalk and landing limits adjusted to new egress stair construction
• Area drain inlet added
• Slab on grade stair revision
C5.0
z
w
• North patio roof drain downspout connection
D
0
U-
Mechanical
P1.2: Main Level Plumbing Plan - plumbing adjustments in Storage 00B
P1.3: Second Level Plumbing Plan - plumbing orientation change to In-Custody RR 207.
P3.1: Enlarged Scale Second Level Plumbing Plan - plumbing orientation change to In-Custody °D
RR 207.
Electrical O
E1.0 Garden Level Electrical Plan
• RFI-108 - Added receptacle for disposal.
• RFI-109 - Added EWH-5 2
• RFI-121 - Updated circuiting per contractor direction.
E1.1 Main Level Electrical Plan Lil
z
• RFI-122 - Added connection to heat trace system. a
E1.2: 1 Second Level Electrical Plan u_
• RFI-102 - Added circuit for snowmelt.
• RFI-107 - Added device for platform lift. RECEIVED
09/06/22022
ASPEN
BUILDING DEPARTMENT
U)
F-
U
• RFI-116 - Added and relocated receptacles, tele/data, security, and access control
devices per box walk changes.
• RFI-121 - Added receptacles for heat mats.
J
E2.0: 1 Garden Level Electrical Plan
• RFI-104 - Updated exit sign locations.
E2.1 Main Level Lighting Plan
z
a
• RFI-119 - Revised/added stair light fixtures.
E2.2: 2 Second Level Electrical Plan
• RFI-104 - Updated exit sign locations. o
• RFI-116 - Updated lighting control device locations per box walk changes.
• RFI-120 - Added VS1 to In Custody RR 207.
E7.00 Electrical Schedules
• RFI-109 - Added EWH-5 to Mechanical Equipment Schedule
E7.11: Electrical Panel Schedule o
co
• Updated panel circuitry per changes above. 0
E7.12: Electrical Panel Schedules
w
0
• Updated panel circuitry per changes above.
LU
Landscape LU
V)
L1.00 - planting zones revised
L2.00 - planting zones revised w
L3.00 - planting notes adjusted
D
0
LL
Per conversations with the building department, only sheets impacted with changes have been R
submitted as part of the Phase III change order. All changes have been clouded.