HomeMy WebLinkAboutFile Documents.183 Red Mountain Rd.0060-2020-BCHO (2) DJAIRCHITECTS
119 South Spring Street Suite 203 1 Aspen, CO
T 970.925.3444 C 517.881.5046
www.djarchitects.com
CHANGE ORDER
No. #1
DATE August 6, 2020
BY Collin Frank
TO City of Apsen Building Department
CC John Barker
PROJECT 183 Red Mountain Rd.
PERMIT# 0038.2018,ARBK
COMMENTS
Change Discipline&Sheet# Comments
tructure an•scape Ig ting
Landscape patio redone. Sk07-09, C-3.0, L.2,01-L.2,02 L2.1
Includes reconfigured paving A1.01-Al.02, C-4.0,C-5,
areas,pervious and A1.04, A1.08- 0, C-7,0,
impervious,outdoor grill area, Al 09 C-9.0,
removal of pool,alterations to D-3.0
spa design and location,
revised drainage calcs and
grading.
Expanded motor court bridge. Z1.06-Z1.07, S.2,01, C-3.0,
FAR reallocated from decks A1.01, A1.05, S.2,03, C-5.0
to motor court. A1.10 S.2,05
Structural additions, S.2.01,
alterations and clarifications. S.2.03,
S.2.05
Snowmelt area increased. Al.02 REMP
Sheet,
M-121
Mechanical clarifications. M-001-
M-6.03
Clarifications to door and A5.01-A5,08,
window drawings. A6.01-A6,07
Fireplace registration revisions FP registration M-111
and architectural details. form, Al.08-
A1.11, A8.01-
A8.05
FAR addition for yard steps Z1.06-Z1.07 Decks to north and
and motor court. south attend main
level deleted.
Chimney revision details adds A2.01, A8.01
to exempt height. RECEIVED
08/14/2020
ASPEN
BUILDING DEPARTMENT
Garage door revised to single A1.10 S.2.05
door
Roof at north and south A1.22, A2.01 S.2,07- Covers same area,
elevations chnages S.2,08 only construction of
the element has
chnaged
Bridge abutment detail and A7.05 Fixture cut
lighting request from sheet, L1.2
engineering.
Stair and handrail alterations/ A7.08-A7.11
clarification
RECEIVED
08/14/2020
ASPEN
BUILDING DEPARTMENT