Loading...
HomeMy WebLinkAboutFile Documents.183 Red Mountain Rd.0060-2020-BCHO (2) DJAIRCHITECTS 119 South Spring Street Suite 203 1 Aspen, CO T 970.925.3444 C 517.881.5046 www.djarchitects.com CHANGE ORDER No. #1 DATE August 6, 2020 BY Collin Frank TO City of Apsen Building Department CC John Barker PROJECT 183 Red Mountain Rd. PERMIT# 0038.2018,ARBK COMMENTS Change Discipline&Sheet# Comments tructure an•scape Ig ting Landscape patio redone. Sk07-09, C-3.0, L.2,01-L.2,02 L2.1 Includes reconfigured paving A1.01-Al.02, C-4.0,C-5, areas,pervious and A1.04, A1.08- 0, C-7,0, impervious,outdoor grill area, Al 09 C-9.0, removal of pool,alterations to D-3.0 spa design and location, revised drainage calcs and grading. Expanded motor court bridge. Z1.06-Z1.07, S.2,01, C-3.0, FAR reallocated from decks A1.01, A1.05, S.2,03, C-5.0 to motor court. A1.10 S.2,05 Structural additions, S.2.01, alterations and clarifications. S.2.03, S.2.05 Snowmelt area increased. Al.02 REMP Sheet, M-121 Mechanical clarifications. M-001- M-6.03 Clarifications to door and A5.01-A5,08, window drawings. A6.01-A6,07 Fireplace registration revisions FP registration M-111 and architectural details. form, Al.08- A1.11, A8.01- A8.05 FAR addition for yard steps Z1.06-Z1.07 Decks to north and and motor court. south attend main level deleted. Chimney revision details adds A2.01, A8.01 to exempt height. RECEIVED 08/14/2020 ASPEN BUILDING DEPARTMENT Garage door revised to single A1.10 S.2.05 door Roof at north and south A1.22, A2.01 S.2,07- Covers same area, elevations chnages S.2,08 only construction of the element has chnaged Bridge abutment detail and A7.05 Fixture cut lighting request from sheet, L1.2 engineering. Stair and handrail alterations/ A7.08-A7.11 clarification RECEIVED 08/14/2020 ASPEN BUILDING DEPARTMENT