Loading...
HomeMy WebLinkAboutFile Documents.1230 Snowbunny Ln.0054-2020-BCHO DATE: 11/8/2019 MASTER PERMIT:0166.2018.ARBK PERMIT NUMBER:0001-2020-BCHo • COMMUNITY DEVELOPMENT DEPARTMENT �� HO BUILDING PERMIT APPLICATION 41. ` CITY OF ASPE N PROPERTY INFORMATION ADDRESS 1230 Snowbunny Lane UNIT# PARCEL ID# 273512207004 LOT 11 BLOCK 2 O SUBDIVISION Snowbunny Subdivision OWNER NAME 1230 Snowbunny Lane, LLC. CELLn312)339-3348 EMAIL lillyvalentine@comcast.net BEST CONTACT Steve Novy CELL 970.390.2023 EMAIL snovy@greenlinearchitects.com NAME PROJECT DETAILS (READ DEFINITIONS BELOW) CO PLETIONMUSE T COMPLETED IN ITS ENTIRETY 1 OF WORK IN DESCRIPTION D TAIL Revisions to permeable paving, outdoor step lighting, and fire pit. See project narrative included in this submittal. No changes to building work area, or footprint. PROJECT $100,00o Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical ❑ New _Toilets,Bidets Major Engineering Review SBQQU IIFTOF 0 Multi-Family El Addition Bathtub •Projects involving less than 50% WORKDIIAREA 0 E Single Family ❑ Alteration Lavatory(Wash Basin) hardscape area and work affecting 0 Mixed-Use 0 Repair Shower 75%or greater of unit sq ft no changeKitchen Sink(+Disposal) •Projects involving greater than UNITSQFT 0 0 IFFR Dishwasher 50%hardscape area and work LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit 14,435 sq.f.t (SQ FT) Will there be 0 Demolition Clothes Washer sq ft 503FTOFSOIL any roof/wall ❑■ Change Order Floor Sink •Projects involving 1,000+sq ft of DI TURBAN IL no change penetrations? ❑ Floor Drain soil disturbance area ❑ Yes Water Heater(Pan Req) NEW SQ FT no change E No #Gas Outlets Water Efficient Landscaping _Water Treatment •Projects that trigger a major BUILDING no change Other engineering review FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior or construction authorized is not commenced within NO CHANGES alterations affecting 50%or more HARDSCAPE no change 180 days,or if construction or work is suspended or of exisitingratiogross square footage AREA abandoned for a period of 180 days at any time after q g ZONE R-15 work is commenced. DISTRICT i Project Valuation:Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. O Unit Sq Ft:Gross square footage, not FAR,of permitted unit. H Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved w Building Footprint:Grade floor square footage of the permitted structure. PC x II 1/2/2020 0 Hardscape Area:Square footage of impervious lot surface. Zone District:Underlying zone district of permitted parcel. Zoning x bn 3/20/2020 HPC Building x TF 1/10/2020 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire Building Building Engineering x pjm 3i26i2020 Review 325.00 Permit Fee 25 00 Parks Impact 321 .1 CMP Engineering Zoning 487.50 School Lands Water Review Review(50%) Dedication Stormwater Zoning o Air Quality-$35.95 CMP(50%) TDM Impact Sanitation Review(50%) Energy Code REMP Pedestrian Env. Health Review Payment 16826.68 Amenity Parks CMP(50%) GIS Housing Cash in Lieu 3425.99 Landscape Parks Review 321 .17 City Use iySe Water Tap Efficiency Tax Approved County Use To Issue Utility Review Tax Sanitation Issuance ( CITY OF ASPEN January2019 130 S. vl/u'1/1u U GALENA ST ASPEN, CO 81611�