HomeMy WebLinkAboutFile Documents.1230 Snowbunny Ln.0054-2020-BCHO DATE: 11/8/2019 MASTER PERMIT:0166.2018.ARBK PERMIT NUMBER:0001-2020-BCHo
•
COMMUNITY DEVELOPMENT DEPARTMENT ��
HO
BUILDING PERMIT APPLICATION 41.
` CITY OF ASPE N
PROPERTY INFORMATION
ADDRESS 1230 Snowbunny Lane UNIT# PARCEL ID# 273512207004
LOT 11 BLOCK 2 O SUBDIVISION Snowbunny Subdivision
OWNER NAME 1230 Snowbunny Lane, LLC. CELLn312)339-3348 EMAIL lillyvalentine@comcast.net
BEST CONTACT Steve Novy CELL 970.390.2023 EMAIL snovy@greenlinearchitects.com
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) CO PLETIONMUSE T
COMPLETED IN ITS ENTIRETY
1
OF
WORK IN DESCRIPTION D TAIL Revisions to permeable paving, outdoor step lighting, and fire pit. See project narrative included in
this submittal. No changes to building work area, or footprint.
PROJECT $100,00o Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑ New _Toilets,Bidets Major Engineering Review
SBQQU IIFTOF 0 Multi-Family El Addition Bathtub •Projects involving less than 50%
WORKDIIAREA 0 E Single Family ❑ Alteration Lavatory(Wash Basin) hardscape area and work affecting
0 Mixed-Use 0 Repair Shower 75%or greater of unit sq ft
no changeKitchen Sink(+Disposal) •Projects involving greater than
UNITSQFT 0 0 IFFR Dishwasher 50%hardscape area and work
LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit
14,435 sq.f.t
(SQ FT) Will there be 0 Demolition Clothes Washer sq ft
503FTOFSOIL any roof/wall ❑■ Change Order Floor Sink •Projects involving 1,000+sq ft of
DI TURBAN IL no change penetrations? ❑ Floor Drain soil disturbance area
❑ Yes Water Heater(Pan Req)
NEW SQ FT no change E No #Gas Outlets Water Efficient Landscaping
_Water Treatment •Projects that trigger a major
BUILDING no change Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within NO CHANGES alterations affecting 50%or more
HARDSCAPE no change 180 days,or if construction or work is suspended or of exisitingratiogross square footage
AREA abandoned for a period of 180 days at any time after q g
ZONE R-15 work is commenced.
DISTRICT i
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
O Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC x II 1/2/2020
0 Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning x bn 3/20/2020
HPC
Building x TF 1/10/2020
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Engineering x pjm 3i26i2020
Review 325.00 Permit Fee 25 00 Parks Impact 321 .1
CMP
Engineering Zoning 487.50 School Lands Water
Review Review(50%) Dedication Stormwater
Zoning o Air Quality-$35.95 CMP(50%) TDM Impact Sanitation
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review Payment 16826.68 Amenity Parks
CMP(50%) GIS Housing Cash in Lieu 3425.99 Landscape
Parks Review 321 .17 City Use
iySe Water Tap Efficiency
Tax
Approved
County Use To Issue
Utility Review Tax Sanitation
Issuance
( CITY OF ASPEN January2019 130 S. vl/u'1/1u U
GALENA ST ASPEN, CO 81611�