HomeMy WebLinkAboutFile Documents.210 S West End St.0011-2021-BCHO (4) Sack Renovation
210S West End
Change Order 2
1. Snowmelted decks and solar panels added in Change Order 1 are being removed in Change
Order 2.
2. A bathroom is added to Unit 1
3. Kitchen at Unit 1 is upgraded.
4. Minor revisions to main stair.
5. Outdoor fireplace demolished, fire pit added to north deck.
6. One set of exterior steps demolished. One set of exterior steps partially demolished and
new stair configured over foundation.
7. New full landscape and irrigation.
8. Terraces replaced with pervious material.
9. New civil site engineering for major review.
10. Revised wall assembly with foam insulation as discussed with building dept.
11. Additional lighting at units 1 & 2.
RECEIVED
03/01/2021
ASPEN
BUILDING DEPARTMENT