Loading...
HomeMy WebLinkAboutFile Documents.210 S West End St.0011-2021-BCHO (4) Sack Renovation 210S West End Change Order 2 1. Snowmelted decks and solar panels added in Change Order 1 are being removed in Change Order 2. 2. A bathroom is added to Unit 1 3. Kitchen at Unit 1 is upgraded. 4. Minor revisions to main stair. 5. Outdoor fireplace demolished, fire pit added to north deck. 6. One set of exterior steps demolished. One set of exterior steps partially demolished and new stair configured over foundation. 7. New full landscape and irrigation. 8. Terraces replaced with pervious material. 9. New civil site engineering for major review. 10. Revised wall assembly with foam insulation as discussed with building dept. 11. Additional lighting at units 1 & 2. RECEIVED 03/01/2021 ASPEN BUILDING DEPARTMENT