Loading...
HomeMy WebLinkAboutFile Documents.100 N 8th St.0135.2019 (15).ARBK 4• 100 N. 8th St. Unit 18- Interior Room Renovation • 1/ .y • • Oor Field observation of steel I-Beam 5-24-19. The I-beam is supported by the posts at the face of wall at the south and north edges of the room. Removal of the 2x4 interior stud wall that previously sub- divided the room in the north south direction has not visibly altered the structural integrity of the steel I-beam. The steel I-beam continues beyond the face of wall at the south and north edges of the room (being remodeled) into the adjacent room. The span of ,D, the steel I-beam in the adjacent room is 07/05/2019 twice as long as in the room being remodeled with no visible additional FOR COlkLaA .ANCE structural members beyond the steel I- ustinh beam. '11114 • e�P329MUROtii 01/01/2008 Original Date of Licensure V CEIVEID ��2fFO OF colOP QV�\ 4ANDsco, P 1e /28/2019 ASPEN BUILDING DEPARTMENT