Oor
Field observation of steel I-Beam
5-24-19.
The I-beam is supported by the posts at
the face of wall at the south and north
edges of the room. Removal of the 2x4
interior stud wall that previously sub-
divided the room in the north south
direction has not visibly altered the
structural integrity of the steel I-beam.
The steel I-beam continues beyond the
face of wall at the south and north
edges of the room (being remodeled)
into the adjacent room. The span of
,D, the steel I-beam in the adjacent room is
07/05/2019 twice as long as in the room being
remodeled with no visible additional
FOR COlkLaA .ANCE structural members beyond the steel I-
ustinh beam.