HomeMy WebLinkAboutFile Documents.754 Moore Dr.0193.2019 (8).ARBK Lot 12
Manufactured Fireplaces • Spa/Pool Fireplace
Product Data & Shop Drawings REV 02
Submittal 103100.04
Notes: Please select a glass color option from the American
Fireglk de
another alternate. • CH
Project Number I`� RA N E L S O N NO EXCEPTIONS TAKEN
/\ BUILDING MOUNTAIN COMMUNITIES ❑ EXCEPTIONS NOTED
Lot 12
❑ REVISE AND RESUBMIT
❑ REJECTED - RESUBMIT
El REVIEWED ❑ REJECTED
REVIEWED AS NOTED ❑ REVISE AND RESUBMIT Reviewed for conformance only with the design
intent of the project and the information given in the
contract documents. The Contractor is responsible
for confirmation and correlation of work at job site,
information pertaining solely to fabrication processes
BY Candy Huffman — "-- 7/8/19 or techniques of construction and for coordination of
the work with other trades.
SUBMITTAL # 103100-04 REVO2SPEC
By: Nicole Rebeck-Stout
Contractor's review is for general conformance with the Contract Documents. 7-12-19
Subcontractor or Supplier are responsible for verifying all field dimensions, Date:
fabrication and construction means, methods,sequences and coordination
with affected trades. This review does not alter, supersede or replace the
requirements of the Subcontract Agreement or Purchase Agreement. This
review does not relieve the Architect and/or Engineers of their contractual DESIGNWORKSHOP
responsibilities.
• No exception taken
❑ Make correction(s) noted; resubmission not required
El Revise and resubmit
❑ Submit specified item
❑ Rejected
El Submittal not requested; returned without review
Checking is only for general conformance with the design
concept of the project and general compliance with the
information given in the contract documents. Contractor is
responsible for: field verification of dimensions, fabrication
processes and techniques of construction, coordination of
their work with that of other trades and the satisfactory
performance off their work.
BY I f I -./— Date July 15, 2019
rowland+broughton RECEIVED
architecture/urban design/interior design
FIREPLACE MEDIA TO BE SELECTED PENDING CLIENT 04/15/2020
INPUT. PLEASE SUBMIT IN A SEPERATE SUBMITTAL. ASPEN
BUILDING DEPARTMENT
HEARTH PRODUCTS CONTROLS
C 3050 PLAINFIELD RD.
KETTERING, OH 45432
Hearth Products Controls Co TOLL FREE: 1-877-433-7001
PHONE: (937) 433-7000
CSA CERTIFIED-OUTDOOR USE ONLY FAX: (937) 433-0704
FOR COMMERCIAL AND RESIDENTIAL USE www.hpcfire.com
RECOMMENDED ENCLOSURE LENGTH=PRODUCT LENGTH+20"
10" oo PAN 10"
4t
4%fir In ``1,
SUPPORT BRACKET
SHOULD BE 4! �e
.75"-1"
UNDER PAN ISOMETRIC VIEW
1/4"TAP PLUG FOR
MANIFOLD PRESSURE
CHECK a 24"RECOMMENDED ENCLOSURE WIDTH
SIDE ELEVATION
8"
AVAILABLE IN:
•120VAC OR 24VAC•On/Off OR Hi/Lowe i
MATERIAL:304 STAINLESS STEEL
Hi/Lo MODELS HAVE A 40%REDUCTION IN BTU ON LOW SETTING
PART NUMBERS STND DIMENSION CHART
BTU PAN BURNER
25X8SSEI-L 50K 25" 24"
37X8SSEI-L 75K 37" 36"
49X8SSEI-L 100K 49" 48"
61X8SSEI-L 125K 61" 60"
73X8SSEI-L 1150K 73" 72"
97X8SSEI-L 200K 97" 96" 5.25"
121X8SSEI-L 250K 121" 120"
FRONT ELEVATION
Notes:
1. PROPER VENTING
• ENCLOSURES: Recommend 4 each 18 sq.in.vents on opposing sides(Minimum 2 each 18 sq.in.vents).
• BOWLS(Copper,concrete or metal)-Bowl to be raised above mounting surface minimum of 3/4"gap; Bowl to have a minimum of 6"
diameter hole in bottom
2. GAS SUPPLY-FOR USE WITH FIXED PIPING SYSTEMS ONLY-NOT FOR USE WITH SMALL TANKS.
• Natural Gas:Operating Supply Pressure: Minimum:6.0"W.C.; Maximum:7.0"W.C.
• LP Gas: Operating Supply Pressure:Minimum: 10.0"W.C.; Maximum: 11.0"W.C.
IMPORTANT:Ensure any flex line that may be used from the permanent main fuel supply to the product is rated to the stated max btu of the product
and certified to ANSI Z21.75*CSA 6.27.
5. MODIFCATION OF PRODUCT WILL VOID ANY CERTIFICATION AND WARRANTY.
6. FOLLOW ALL MANUFACTURER INSTALLATION INSTRUCTIONS AND LOCAL CODES.
7. ALL DIMENSIONS ARE CONSIDERED TRUE AND REFLECT MANUFACTURER'S SPECIFICATIONS AS OF THE REVISION DATE.
8. DO NOT SCALE DRAWING.
9.THESE DRAWINGS ARE FOR SIZING AND PLANNING PURPOSES.ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE
TIME OF DEVELOPMENT. THE MANUFACTURER'S RESPONSIBLE FOR THE ACCURACY OF THE DRAWING.
10.CONTRACTOR'S NOTE:FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info
REFERENCE NUMBER 771-043.
ELECTRONIC IGNITION RECEIVED
ED
El LINEAR - FLAME SENSING WITH ELECTRONIC HOT SURFACE IGNITION 04/15/2020
771-043 REVISION f TE f 13/2017
BUILDING DEPARTMENT
;.,, IN -1-
/ 6:
eFA, , -._:
' ____=.-- ---
voragalilOwilliga
_ ,. .------- ir-
`
•
4 i p di....,.
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
/j\
AI
A
NATIONAL
FIREPLACE
INSTITUTE
4P" NFI
,--7-7 RECEIVED
,I.:_lii) - )
04/15/2020
ASPEN
BUILDING DEPARTMENT
RECEIVED
(HPC�
04/15/2020
ASPEN
BUILDING DEPARTMENT
RECEIVED
CH P
04/15/2020
ASPEN
BUILDING DEPARTMENT
1
•
f 4
J
111
• RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
Please reference page 1 for all warnings.
hiportant Sfety hformation for hstallers
41Pc
RED'E EVE D
04/15/2020
ASPEN
BUILDING DEPARTMENT
(HP RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
1
_.-0 :_. ...".._ 1 _ _„-i ..,....._
.,
01 ..iimit
.....„,,,,,,-f,,,,,,,,, ...-.44?_ A 1,1 1077. ----
4010111111111111111116,
. 1::1 .....,1- s 1,_....0. wol ,ipl>,,, _, thlt..44_,
vitir
.00ormiamen.......... 11111
•
RECEIVED
i---3
AEI
04/15/2020
ASPEN
BUILDING DEPARTMENT
�HPC�
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
U
Figure 1 - Up to 200k BTU REVISIONS
For Outdoor Use Only ZONE REV DESCRIPTION DATE APPROVED
Overhead solid structure:
(Floor,overhang,pergola or screen)
Solid structure or combustible
on no more than 2 sides
/ of the fire pit
-12"minimum clearance for
noncombustible materials.
Residential
or
Commercial
Building
on 36" 36"
no more than Enclosure constructed of
2 sides all non-combustible materials
—> Minimum of 2 each-18 sq/in vents
on opposing sides
2"
Minimum
above grade/deck Permanent fuel supply
plumbed by certified installer
Combustable Material:
and inspected by local authority
-For direct install on decking,joist and trusses
see Deck Installation Kit drawing and instructions
Diagram illustrates common DRAWN DATE
clearance questions. 6/22/2017 Clearance's - Standard Fire Pit Up to 200k btu
Clearance from overhead structure CHECKED
'Clearance from structure/combustible
/
OA
All items may or may not apply to your project. Hearth Produal:S Controls Co
Clearance's apply to any and all sides MFG SIZE FSCM NO. DWG NO. REV
of the project. A
•
Read and follow all instructions APPROVED
and local codes SCALE SHEET
/\
�FIPCCCCCCC�
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
REVISIONS
Figure 2 - 201 k to 400k BTU ZONE REV DESCRIPTION DATE APPROVED
For Outdoor Use Only
Non-Combustible Material
with at least 50%free air space.
(TypSeefreey space
sh or ela)
Overhead solid structure free air space mesh example
Solid structure or combustible
on no more than 2 sides
of the fire pit
-
24"minimum clearance for
noncombustible materials.
Residential1 20"
or
Commercial
Building
on 48" — 0" 48" _Enclosure constructed of
no more than To edge all non-combustible materials
2 sides of product
Minimum of 2 each-18 sq/in vents
on opposing sides
2"
Minimum Permanent fuel supply
above grade/den plumbed by certified installer
Combustable Material: and inspected by local authority
-For direct install on decking,joist and trusses
see Deck Installation Kit drawing and instructions
Note:
-50%free air space minimum.HPC is not responsible for screen that melts.
-For non-combustible screening a 20 x 20 x.013 wire mesh thickness or courser.(More open space)
Free Air Space Mesh Example -For all other non-combustible coverings an on-site estimate of free air space will be necessary.
3:1 Scale of 20x20x.01 3
Diagram illustrates common DRAWN DATE
clearance questions. 6/22/2017 Clearance's - Standard Fire Pit 201k to 400k btu
•Clearance from overhead structure CHECKED
'Clearance from structure/combustible
All items may or may not apply to OA
your project. HearthProducts Controls Co
Clearance's apply to any and all sides MFG SIZE FSCM NO. DWG NO. REV
of the project. A
Read and follow all instructions APPROVED
and local codes SCALE SHEET
a RECEIVED
�FIPC�
04/15/2020
ASPEN
BUILDING DEPARTMENT
7-11
�I�IPC�
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
RECEIVED
(HPC�
04/15/2020
ASPEN
BUILDING DEPARTMENT
Burn Testing:t is tb responsibility of tb qalified
/ installer to test for gas leak at all connections.
Gas Plumbing Connections:kb pint compound or tape
/ Mt is resistant to all gases.Aply pint compound only to
all male pipe fittings. DO NOT use on flex line flared
fittings. Be sure to tigten eery pint securely.
RED'E EVE D
�HPC�
04/15/2020
ASPEN
BUILDING DEPARTMENT
�HPC�
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
■
■
AN
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
,...._ . _,
,-I
,
, i
_ I / r j.
, A
... .
i
,
.
$
IcsksN
..ifar
•
• -
. 10*
.
•
- ' • .
4Pc)
_........... ....., m. RECEIVED
.i
04/15/2020
ASPEN
BUILDING DEPARTMENT
AN
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
1
"ON/OFF"
"OFF" "ON"
"What
Gas"
"ON"
"ON"
1 r RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
• NATIONAL
FIREPLACE
INSTITUTE
NFI
• L �
• ._ ,vir
• //
J. I.
,.. .1. ha -4 11111. i .. ..
Z a w7
11111111.1M1-
�I�IPC�
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
NATIONAL
FIREPLACE
INSTITUTE
NFI
(HPC� RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
BLUE
POWER BLACKI BLACK HPC/SEBCO
IN WHITE 75va TRANSFORMER BLACK
POWER 24VAC
WHITE WHITE POWER SUPPLY
GREEN t I ORANGE IN
(24VAC,4.2A,
120VACII 111 GREEN
GROUND 120VAC
100W)
CHASSIS
24C RED 5A FUSE GROUND HOT COMMON
CHASSIS
(RED) (GREEN)
5A FUSE 24C GREEN
All wire-18 AWG,°200C,600V
1/4"fully insulated female spade
terminal,22-16 AWG 250a,x 11
(color red)
#6 Ringlet Terminal 22-16 AWG
Zip tie—Nylon 66 UV stable
miniature,3"length
MODULE
HSI _ BLACK TO MOLEX
HPC El WIRE DIAGRAM HSI BLACK
120VAC/24v •LED =24C TO MOLEX
RED
24L M = 5A FUSE
THERMOCOUPLE I < M CHASSIS
MI TC-
. WO
RED
RED_ _Transformer 24C RED
WHITE
24C M I M C
MVH _
VALVE
BLUE
MVL = . I M MV
YELLOW
PV _ I r ' _ PV
r
ZIP TIE I T
�; RECEIVED
�HPC�
04/15/2020
ASPEN
BUILDING DEPARTMENT
•
,-, 1
)
• I1 '
f " 4- 'fir' L rW.
' -- , o._ .
r
i. 1 I
',....
I
P. II,I1 --- \ i
_P
P - WM f �Hti
- 6,,, _ ,
„. -
.,,, ,
:.
_ , .
,_ ,,, .ai -S'''''
y' . ,
Lpipc.
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
I
I
I '
1 I
,
�I�IPC�
RECEIVED
04/15/2020
ASPEN
BUILDING DEPARTMENT
RECEIVED
5/21 04/15/2020
ASPEN
BUILDING DEPARTMENT