Loading...
HomeMy WebLinkAboutFile Documents.754 Moore Dr.0193.2019 (8).ARBK Lot 12 Manufactured Fireplaces • Spa/Pool Fireplace Product Data & Shop Drawings REV 02 Submittal 103100.04 Notes: Please select a glass color option from the American Fireglk de another alternate. • CH Project Number I`� RA N E L S O N NO EXCEPTIONS TAKEN /\ BUILDING MOUNTAIN COMMUNITIES ❑ EXCEPTIONS NOTED Lot 12 ❑ REVISE AND RESUBMIT ❑ REJECTED - RESUBMIT El REVIEWED ❑ REJECTED REVIEWED AS NOTED ❑ REVISE AND RESUBMIT Reviewed for conformance only with the design intent of the project and the information given in the contract documents. The Contractor is responsible for confirmation and correlation of work at job site, information pertaining solely to fabrication processes BY Candy Huffman — "-- 7/8/19 or techniques of construction and for coordination of the work with other trades. SUBMITTAL # 103100-04 REVO2SPEC By: Nicole Rebeck-Stout Contractor's review is for general conformance with the Contract Documents. 7-12-19 Subcontractor or Supplier are responsible for verifying all field dimensions, Date: fabrication and construction means, methods,sequences and coordination with affected trades. This review does not alter, supersede or replace the requirements of the Subcontract Agreement or Purchase Agreement. This review does not relieve the Architect and/or Engineers of their contractual DESIGNWORKSHOP responsibilities. • No exception taken ❑ Make correction(s) noted; resubmission not required El Revise and resubmit ❑ Submit specified item ❑ Rejected El Submittal not requested; returned without review Checking is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. Contractor is responsible for: field verification of dimensions, fabrication processes and techniques of construction, coordination of their work with that of other trades and the satisfactory performance off their work. BY I f I -./— Date July 15, 2019 rowland+broughton RECEIVED architecture/urban design/interior design FIREPLACE MEDIA TO BE SELECTED PENDING CLIENT 04/15/2020 INPUT. PLEASE SUBMIT IN A SEPERATE SUBMITTAL. ASPEN BUILDING DEPARTMENT HEARTH PRODUCTS CONTROLS C 3050 PLAINFIELD RD. KETTERING, OH 45432 Hearth Products Controls Co TOLL FREE: 1-877-433-7001 PHONE: (937) 433-7000 CSA CERTIFIED-OUTDOOR USE ONLY FAX: (937) 433-0704 FOR COMMERCIAL AND RESIDENTIAL USE www.hpcfire.com RECOMMENDED ENCLOSURE LENGTH=PRODUCT LENGTH+20" 10" oo PAN 10" 4t 4%fir In ``1, SUPPORT BRACKET SHOULD BE 4! �e .75"-1" UNDER PAN ISOMETRIC VIEW 1/4"TAP PLUG FOR MANIFOLD PRESSURE CHECK a 24"RECOMMENDED ENCLOSURE WIDTH SIDE ELEVATION 8" AVAILABLE IN: •120VAC OR 24VAC•On/Off OR Hi/Lowe i MATERIAL:304 STAINLESS STEEL Hi/Lo MODELS HAVE A 40%REDUCTION IN BTU ON LOW SETTING PART NUMBERS STND DIMENSION CHART BTU PAN BURNER 25X8SSEI-L 50K 25" 24" 37X8SSEI-L 75K 37" 36" 49X8SSEI-L 100K 49" 48" 61X8SSEI-L 125K 61" 60" 73X8SSEI-L 1150K 73" 72" 97X8SSEI-L 200K 97" 96" 5.25" 121X8SSEI-L 250K 121" 120" FRONT ELEVATION Notes: 1. PROPER VENTING • ENCLOSURES: Recommend 4 each 18 sq.in.vents on opposing sides(Minimum 2 each 18 sq.in.vents). • BOWLS(Copper,concrete or metal)-Bowl to be raised above mounting surface minimum of 3/4"gap; Bowl to have a minimum of 6" diameter hole in bottom 2. GAS SUPPLY-FOR USE WITH FIXED PIPING SYSTEMS ONLY-NOT FOR USE WITH SMALL TANKS. • Natural Gas:Operating Supply Pressure: Minimum:6.0"W.C.; Maximum:7.0"W.C. • LP Gas: Operating Supply Pressure:Minimum: 10.0"W.C.; Maximum: 11.0"W.C. IMPORTANT:Ensure any flex line that may be used from the permanent main fuel supply to the product is rated to the stated max btu of the product and certified to ANSI Z21.75*CSA 6.27. 5. MODIFCATION OF PRODUCT WILL VOID ANY CERTIFICATION AND WARRANTY. 6. FOLLOW ALL MANUFACTURER INSTALLATION INSTRUCTIONS AND LOCAL CODES. 7. ALL DIMENSIONS ARE CONSIDERED TRUE AND REFLECT MANUFACTURER'S SPECIFICATIONS AS OF THE REVISION DATE. 8. DO NOT SCALE DRAWING. 9.THESE DRAWINGS ARE FOR SIZING AND PLANNING PURPOSES.ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT. THE MANUFACTURER'S RESPONSIBLE FOR THE ACCURACY OF THE DRAWING. 10.CONTRACTOR'S NOTE:FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info REFERENCE NUMBER 771-043. ELECTRONIC IGNITION RECEIVED ED El LINEAR - FLAME SENSING WITH ELECTRONIC HOT SURFACE IGNITION 04/15/2020 771-043 REVISION f TE f 13/2017 BUILDING DEPARTMENT ;.,, IN -1- / 6: eFA, , -._: ' ____=.-- --- voragalilOwilliga _ ,. .------- ir- ` • 4 i p di....,. RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT /j\ AI A NATIONAL FIREPLACE INSTITUTE 4P" NFI ,--7-7 RECEIVED ,I.:_lii) - ) 04/15/2020 ASPEN BUILDING DEPARTMENT RECEIVED (HPC� 04/15/2020 ASPEN BUILDING DEPARTMENT RECEIVED CH P 04/15/2020 ASPEN BUILDING DEPARTMENT 1 • f 4 J 111 • RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT Please reference page 1 for all warnings. hiportant Sfety hformation for hstallers 41Pc RED'E EVE D 04/15/2020 ASPEN BUILDING DEPARTMENT (HP RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT 1 _.-0 :_. ...".._ 1 _ _„-i ..,....._ ., 01 ..iimit .....„,,,,,,-f,,,,,,,,, ...-.44?_ A 1,1 1077. ---- 4010111111111111111116, . 1::1 .....,1- s 1,_....0. wol ,ipl>,,, _, thlt..44_, vitir .00ormiamen.......... 11111 • RECEIVED i---3 AEI 04/15/2020 ASPEN BUILDING DEPARTMENT �HPC� RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT U Figure 1 - Up to 200k BTU REVISIONS For Outdoor Use Only ZONE REV DESCRIPTION DATE APPROVED Overhead solid structure: (Floor,overhang,pergola or screen) Solid structure or combustible on no more than 2 sides / of the fire pit -12"minimum clearance for noncombustible materials. Residential or Commercial Building on 36" 36" no more than Enclosure constructed of 2 sides all non-combustible materials —> Minimum of 2 each-18 sq/in vents on opposing sides 2" Minimum above grade/deck Permanent fuel supply plumbed by certified installer Combustable Material: and inspected by local authority -For direct install on decking,joist and trusses see Deck Installation Kit drawing and instructions Diagram illustrates common DRAWN DATE clearance questions. 6/22/2017 Clearance's - Standard Fire Pit Up to 200k btu Clearance from overhead structure CHECKED 'Clearance from structure/combustible / OA All items may or may not apply to your project. Hearth Produal:S Controls Co Clearance's apply to any and all sides MFG SIZE FSCM NO. DWG NO. REV of the project. A • Read and follow all instructions APPROVED and local codes SCALE SHEET /\ �FIPCCCCCCC� RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT REVISIONS Figure 2 - 201 k to 400k BTU ZONE REV DESCRIPTION DATE APPROVED For Outdoor Use Only Non-Combustible Material with at least 50%free air space. (TypSeefreey space sh or ela) Overhead solid structure free air space mesh example Solid structure or combustible on no more than 2 sides of the fire pit - 24"minimum clearance for noncombustible materials. Residential1 20" or Commercial Building on 48" — 0" 48" _Enclosure constructed of no more than To edge all non-combustible materials 2 sides of product Minimum of 2 each-18 sq/in vents on opposing sides 2" Minimum Permanent fuel supply above grade/den plumbed by certified installer Combustable Material: and inspected by local authority -For direct install on decking,joist and trusses see Deck Installation Kit drawing and instructions Note: -50%free air space minimum.HPC is not responsible for screen that melts. -For non-combustible screening a 20 x 20 x.013 wire mesh thickness or courser.(More open space) Free Air Space Mesh Example -For all other non-combustible coverings an on-site estimate of free air space will be necessary. 3:1 Scale of 20x20x.01 3 Diagram illustrates common DRAWN DATE clearance questions. 6/22/2017 Clearance's - Standard Fire Pit 201k to 400k btu •Clearance from overhead structure CHECKED 'Clearance from structure/combustible All items may or may not apply to OA your project. HearthProducts Controls Co Clearance's apply to any and all sides MFG SIZE FSCM NO. DWG NO. REV of the project. A Read and follow all instructions APPROVED and local codes SCALE SHEET a RECEIVED �FIPC� 04/15/2020 ASPEN BUILDING DEPARTMENT 7-11 �I�IPC� RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT RECEIVED (HPC� 04/15/2020 ASPEN BUILDING DEPARTMENT Burn Testing:t is tb responsibility of tb qalified / installer to test for gas leak at all connections. Gas Plumbing Connections:kb pint compound or tape / Mt is resistant to all gases.Aply pint compound only to all male pipe fittings. DO NOT use on flex line flared fittings. Be sure to tigten eery pint securely. RED'E EVE D �HPC� 04/15/2020 ASPEN BUILDING DEPARTMENT �HPC� RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT ■ ■ AN RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT ,...._ . _, ,-I , , i _ I / r j. , A ... . i , . $ IcsksN ..ifar • • - . 10* . • - ' • . 4Pc) _........... ....., m. RECEIVED .i 04/15/2020 ASPEN BUILDING DEPARTMENT AN RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT 1 "ON/OFF" "OFF" "ON" "What Gas" "ON" "ON" 1 r RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT • NATIONAL FIREPLACE INSTITUTE NFI • L � • ._ ,vir • // J. I. ,.. .1. ha -4 11111. i .. .. Z a w7 11111111.1M1- �I�IPC� RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT NATIONAL FIREPLACE INSTITUTE NFI (HPC� RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT BLUE POWER BLACKI BLACK HPC/SEBCO IN WHITE 75va TRANSFORMER BLACK POWER 24VAC WHITE WHITE POWER SUPPLY GREEN t I ORANGE IN (24VAC,4.2A, 120VACII 111 GREEN GROUND 120VAC 100W) CHASSIS 24C RED 5A FUSE GROUND HOT COMMON CHASSIS (RED) (GREEN) 5A FUSE 24C GREEN All wire-18 AWG,°200C,600V 1/4"fully insulated female spade terminal,22-16 AWG 250a,x 11 (color red) #6 Ringlet Terminal 22-16 AWG Zip tie—Nylon 66 UV stable miniature,3"length MODULE HSI _ BLACK TO MOLEX HPC El WIRE DIAGRAM HSI BLACK 120VAC/24v •LED =24C TO MOLEX RED 24L M = 5A FUSE THERMOCOUPLE I < M CHASSIS MI TC- . WO RED RED_ _Transformer 24C RED WHITE 24C M I M C MVH _ VALVE BLUE MVL = . I M MV YELLOW PV _ I r ' _ PV r ZIP TIE I T �; RECEIVED �HPC� 04/15/2020 ASPEN BUILDING DEPARTMENT • ,-, 1 ) • I1 ' f " 4- 'fir' L rW. ' -- , o._ . r i. 1 I ',.... I P. II,I1 --- \ i _P P - WM f �Hti - 6,,, _ , „. - .,,, , :. _ , . ,_ ,,, .ai -S''''' y' . , Lpipc. RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT I I I ' 1 I , �I�IPC� RECEIVED 04/15/2020 ASPEN BUILDING DEPARTMENT RECEIVED 5/21 04/15/2020 ASPEN BUILDING DEPARTMENT