Loading...
HomeMy WebLinkAboutFile Documents.1035 E Hopkins Ave.0213.2018 (2).ARBK Environmental & Disaster Restoration , Inc . ECOS Environmental - Glenwood Springs 6690 Hwy 82 Glenwood Springs, CO 81601 Office - (970) 945-4407 info@ecosenvironmental.com www.ecosenvironmental.com ASBESTOS INSPECTION REPORT CLIENT: GOLDEN,JOANNA ADDRESS: 1035 EAST HOPKINS ASPEN COLORADO EMAIL: PHONE: 410-302-5567 Ecos JOB NUMBER G-18-397-AT PROJECT LOCATION: 1035 East Hopkins ASPEN COLORADO DATE OF INSPECTION: 8/2/2018 RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental&Disaster Restoration,Inc. SUMMARY ECOS Environmental&Disaster Restoration(ECOS) was retained to conduct a limited asbestos inspection at the above location in reference to determine if there is asbestos containing material (ACM),in the building prior to demolition of the store building materials. The inspection included all accessible building materials,however, should any additional building materials be discovered during demolition,those materials must be sampled and analyzed prior to continuing with the work. Three (3) samples were collected of all suspect materials throughout the building,as listed in the Lab Data Table located on Page 8 of this report. INSPECTOR QUALIFICATIONS This inspection was performed by Yuri Rivera, Colorado State Department of Public Health and Environment Certification Number 24317. SAMPLE ANALYSIS PROCEDURE ECOS collected bulk samples of the homogenous materials in a random and representative manner,as determined by the Inspector. A minimum of one composite core samples that included all layers within the suspect material was obtained from each homogenous area. Samples of soft friable materials were obtained by removing a small portion using wetting techniques. The sampler cleaned equipment following collection of each sample to minimize cross-contamination between samples. The sampler assumed that materials in inaccessible locations were similar to those in accessible locations,in order to limit destruction during the sampling process. All samples were placed in sealed,labeled containers, and the sample descriptions and locations were recorded.Samples were delivered under a chain of custody for analysis to Aerobiology Laboratory in Denver, CO. Samples were analyzed by Polarized Light Microscopy. TRANSMITTAL OF BUILDING One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows: • One copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition,renovation,remodeling or repair work under applicable State or local laws. • The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition,renovation,remodeling or repair project. RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental&Disaster Restoration,Inc. BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION The asbestos survey shall, at a minimum,identify and assess with due diligence,the locations, quantities,friability and conditions of all building material types at the affected portion of the building/structure. The certified asbestos inspector is responsible for identification and assessment of all type within the affected portion of the building/structure. All building materials visually assessed shall be assumed to be asbestos containing material (ACM), unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies. The subsequent analysis is performed by a laboratory that meets the requirements and the analyses satisfies both CO STATE ELAP and federal requirements,including multi-layered sample analyses,to document non-asbestos containing material. The building/structure asbestos survey shall also include the building/structure name,address,the building/structure owner's name and address,the name and address of the owner's agent,the name of the firm performing the asbestos survey and a copy of the firm's current asbestos handling license,the names of the certified inspector(s) performing the survey and a copy of the current asbestos handling certificate for each inspector utilized,the dates of the asbestos survey, a listing of homogeneous areas identifying which ones are ACM,all laboratory analysis reports for bulk samples collected,and copies of the appropriate certifications for the laboratory used for analysis of samples taken during the asbestos survey. REMOVAL REQUIREMENT If the building/structure asbestos survey finds that the portion of the building/structure to be demolished,renovated,remodeled,or have repair work contains asbestos containing material (ACM), which is impacted by the work,the owner or the owner's agent shall conduct,or cause to have conducted,asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth. All ACM impacted by the demolition,renovation,remodeling or repair project shall be removed,prior to access or disturbance by other uncertified trades or personnel. No demolition,renovation, remodeling or repair work shall be commenced by any owner or the owner's agent prior to the completion of the asbestos abatement in accordance with the notification requirements. For multi- phased work,the access restriction for uncertified trades or personnel applies to each intermediate portion of the entire project.Upon completion of the intermediate portion of the asbestos project, other trades,or personnel may access that portion of the work site. For demolition projects that are exempt from asbestos survey requirements due to being structurally unsound, the demolition is considered an asbestos project. All building/structure owners and asbestos abatement contractors on a demolition,renovation, remodeling, or repair project shall inform all trades on the work site about the ACM at the work site. UNIDENTIFIED AND UNASSESSED ASBESTOS When any construction activity,such as demolition,remodeling,renovation or repair work r EIVE suspect ACM that has not been identified by the asbestos survey,or has not been identif 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental N.Disaster Restoration,Inc. inspections as per current OSHA or EPA requirements,all activities shall cease in the area where the suspect ACM is found. Unassessed suspect miscellaneous ACM shall be treated and handled as ACM and assumed to be ACM,unless proven otherwise by standard EPA and OSHA accepted methods. To document non-asbestos containing material,analysis must be performed by a laboratory that meets the requirements of the DOH; and the analysis satisfies both CO STATE ELAP and federal requirements. ASBESTOS PROJECTS An asbestos project is any work that involves the removal, encapsulation,enclosure,repair or disturbance of friable or non-friable asbestos,or any handling of asbestos material that may result in the release of asbestos fibers.For the purpose of compliance an asbestos project shall include any disturbance of asbestos fibers,and the planning,asbestos survey, design,background air sampling, inspection,air sampling and oversight of abatement work,cleanup,and the handling of all asbestos material subject to abatement,as well as the supervising of such activities. An asbestos project starts with Phase I when the planning, asbestos survey,and design work begins or is required to begin. The project shall not be considered completed until Phase II D is complete. (See Table 1 below). Phase I Phase II (Prior to Asbestos Abatement Contractor) Start->Abatement-> End A B A B C D Regulated Asbestos Final Asbestos abatement handling survey, Background work area(s) including gross cleaning Final waste planning, air sampling preparation removal or and removal and design and enclosure abatement,initial clearance from site construction cleans,and waste air samples Start->Asbestos Project->Final Clearance RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental&Disaster Restoration,Inc. ASBESTOS RESULTS FLOW CHART Asbestos Test I - Non Detect < 1% >1% I M No Action OSHA Reg. 8 dditional Reg. 8 Required I Requirements Requirements Requirements >3,000 SF P NO Permit Required Permit Project Design Ii ECOS provides Project Manager clearance (NOT learance Testing Oversight P required) IManifested Disposal at pproved Landfill ASBESTOS PROJECT SIZE Large asbestos project: An asbestos project involving the removal, disturbance, enclosure, encapsulation,repair or handling of 160 square feet or more of ACM, or 260 linear feet or more of ACM. Small asbestos project: An asbestos project involving the removal,encapsulation, enclosure,repair, disturbance or any handling of more than 10 and less than 160 square feet of ACM or more than 25 and less than 260 linear feet of ACM. Minor asbestos project: An asbestos project involving the removal, disturbance,repair,encapsulation, enclosure or handling of 10 square feet or less of ACM or 25 linear feet or less of ACM. ASBESTOS REMOVAL CATEGORIES RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental tic Disaster Restoration,Inc. Category I Non-Friable ACM:NESHAP classification-Asbestos-containing packings, gaskets,resilient floor covering,and asphalt roofing products,containing more than one percent (1%) asbestos,that when dry,cannot be crumbled,pulverized, or reduced to powder by hand pressure. Category II Non-Friable ACM:NESHAP classification-Any material,excluding Category I Non-Friable ACM,containing more than one percent(1%) asbestos that,when dry,cannot be crumbled,pulverized, or reduced to powder by hand pressure. Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems Insulation (TSI),and surfacing ACM and PACM. Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACM which is not TSI or surfacing material.This includes,but is not limited to,the removal of asbestos-containing wallboard,floor tile and sheeting,roofing and siding shingles,and construction mastics. Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations,where no more than a minor quantity of ACM,including TSI and surfacing ACM and PACM,is likely to be disturbed. Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which employees contact but do not disturb ACM or PACM and activities to clean up non-ACM dust,waste and debris resulting from Class I, II and III activities. DEFINITIONS Abatement:Procedures to control fiber release from asbestos material. This includes removal, encapsulation, enclosure,repair, and disturbance of friable asbestos or any handling of asbestos material that may result in the release of asbestos fibers. Amosite:An Asbestiform mineral of the amphibole group containing approximately 50% silicon and 40% Iron(II) Oxide,and is made up of straight brittle fibers,light gray to pale brown in color. Amphibole:One of the two major groups of minerals from which the Asbestiform minerals are derived, distinguished by their chain-like crystal structure and chemical composition. Asbestos:A generic name given to a number of naturally occurring hydrated mineral silicates that possess a unique crystalline structure,are incombustible in air, and are separable into fibers. Asbestos includes the asbesti-form varieties of chrysotile (serpentine);crocidolite (riebeckite);amosite (cummington-grunerite);anthophyllite;and actinolite. Asbestos Project:Work undertaken by a contractor which at any time involves any aspect of the removal, encapsulation,enclosure or disturbance of friable asbestos,or any handling of asbestos material that may result in the release of asbestos fiber,except work in an owner-occupied single family dwelling performed by the owner of such dwelling. An asbestos project shall include the planning, design,monitoring,inspection,and air sampling of abatement work,as well as the supervising of such activities. RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental Disaster Restoration,Inc. Building Owner:The person in whom legal title to the premises is vested unless the premises are held in land trust,in which instance building owner means the person in whom beneficial title is vested. Electron Microscopy:A method of asbestos sample analysis which utilizes an electron beam to differentiate between fibers. Emergency:An unexpected,unanticipated or unforeseen occurrence,including but not limited to,a steam,chemical, gas or water line rupture,a boiler failure, or a building collapse,which poses (a) an imminent danger to the health and safety of the public,the response to which will constitute an asbestos project; or (b) an asbestos-related risk to the health and safety of the public from exposure to asbestos fibers. Friable Asbestos:Any materials that contain more than 1% asbestos and can be crumbled, pulverized, or reduced to powder by hand pressure. HEPA Filter Vacuum Equipment:Vacuuming equipment with a high efficiency particulate air filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater than 0.3 microns equivalent aerodynamic diameter. Homogenous:Evenly mixed and similar in appearance and texture throughout. NESHAP:National Emission Standard for Hazardous Air Pollutants OSHA:Occupational Safety and Health Administration Operations and Management Plan (OMP): Specific procedures and practices developed for the interim control of asbestos-containing materials in buildings until it is removed. Polarized Light Microscopy (PLM):An optical microscopic technique used to distinguish between different types of asbestos fibers by their shape and unique optical properties. Repair: Corrective action using required work practices to control fiber release from damaged asbestos material. TSI:Thermal Systems Insulation RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental&Disaster Restoration,Inc. LAB DATA Non Sample Suspect Material Detect Detect Percentage Friability Condition APPR.SF AB-1 Gray granular plaster X Yes Good 1000sF White compound/white paint X Yes Good AB-2 Yellow fibrous mesh X Yes Good White/tan drywall X Yes Good White compound/white paint X Yes Good AB-3 White texture whit white paint X Yes Good White tape X Yes Good White joint compound X Yes Good White/tan drywall X Yes Good INVENTORY Homogenous Material Description AB-1 to AB-3 Drywall, tape and texture CONCLUSION Visual inspection was completed of all building materials prior to removal of the drywall. Three (3) samples were collected and sent to Aerobiology Laboratories in Golden, CO,for analysis using Polarized Light Microscopy (PLM). The samples came back NOT detect for asbestos with samples from closet/mechanical room,bedroom and stairs. RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental l'x Disaster Restoration,Inc. CERTIFICATIONS OP 1' _, 4 Colorado Department 11.0::._I?: of Public Health N' and Environment 1 { a 4 ASBESTOS CONSULTING FIRM ' This certifies that t Ecos Environmental and Disaster Restoration,Incl % ` 0 itRegistration No.:ACF-14480 Ft.,' �' has met the registration requirements of 25-7-507,C.R.S.and the Air Quality Control S �j Commission Regulation No.8,Part B,and is hereby authorised to perform asbestos consulting I, ' activities as required under Regulation No 8,Part B, in the state of Colorado. Issued: September 09,2017 , `4 : Expires: September 09,2018 I7 '' Auawrized :::4!r' '' Apco SEAL !.: Ar '4, el rl wH b e -, N ,� } . e ' ",r \ 0 '4 "11.1. Y sli 'n , ,c/i, T ir _r ' ' : ,4-,..7-4 .. ,:r.,---_ DI ,:,„:4-5'-' ifte 3. ��• ; Colorado Department �. of Public Health ',p'. - and Environment ASBESTOS .#1.4:i. CERTIFICATION* , This certifies that Yuri Rivera , �s Certification No.:24317 -? k '; r41 has met the requirements of 25-7-507,C.R.S.and Air Quality Control A (,:t.I.Nicr., Commission Regulation No.8,Pan B,and is hereby certified by the - 1 4< ; state of Colorado in the following discipline: /E Building Inspector* 9' %. S , Issued: February15,2018 '� 1 I . Expires: February 15,2019 .4, Th rXlronhvalldnnh xllh rheP�rvsslari ola --[%/' � ti DlllnnuyynsvJ rnJnlnX rnunrrmPruXnn IJC y} rn tRe Armrpinr,pe hrJ n6mY A Wei AFCD Rpm. pp RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental&Disaster Restoration,Inc. PHOTOS ,'� 'N e .,I fir'. u�I ,---_,.- , alba - , .„---4 • .,;.. i i RI r ..., ___ li ____„___ ,,„,„ _ _ _„____.._ 4, _..;,;,.„,,,„,_ . - iv i: _ . , • .,e . A ... ,., ,I. • • .... ,.. .. 1' , ,..'$40' w uuuiury ,, ‘..:,.i -7 .. .41 RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental&Disaster Restoration,Inc. I Id, • I- .- ,- _.,- 1 i 'e'er . .4 6t liti * , i lip. .......idizit . 4 it r... 114.cp- ....,,,-. .....,. :.;=--..,- �% *'IN. ri 'Nip. �I ' E I .. 1.'111111r 01,- RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT ecos Environmental&Disaster Restoration,Inc. FINAL NOTES This report represents the opinion of the reporting asbestos inspector at the time of the asbestos assessment survey. If you have any further questions, or if additional information is needed please do not hesitate to call. Sincerely, Yuri Rivera Colorado State EPA Asbestos Inspector#24317 ECOS Environmental&Disaster Restoration,Inc. (970) 945-4407 RECEIVED 08/15/2018 ASPEN BUILDING DEPARTMENT