Loading...
HomeMy WebLinkAboutSub Permit.440 N 5th St.0072.2019 (14).ARBK A B C D E 1 210 ESTIMATED COSTS COST 2 0.00 3 ASBESTOS ABATEMENT 0.00 4 TREE REMOVAL 0.00 5 DEMOLITION 8,500.00 6 EARTHWORK 0.00 7 FOUNDATION/EARTH RETENETION 0.00 8 LANDSCAPING(ALLOWANCE) 0.00 9 CONCRETE 2,500.00 10 STONE AND MASONRY 25,000.00 11 STRUCTURAL STEEL 20,000.00 12 ORNAMENTAL METALS 15,000.00 13 FRAMING AND WOOD SIDING 20,000.00 14 TIMBERS 0.00 15 CARPENTRY MATERIALS&HANDLING 10,000.00 16 ARCHITECTURAL MILLWORK 0.00 17 WATERPROOFING 8,000.00 18 INSULATION 2,500.00 19 ROOFING 8,000.00 20 WOOD DOORS 0.00 21 GARAGE DOOR 0.00 22 GLASS AND GLAZING 0.00 23 DOOR HARDWARE 0.00 24 INTERIOR GLASS 0.00 25 DRYWALL, METAL FRAMING&PLASTER 3,500.00 26 TILE AND SLAB COUNTERTOP SURFACES 1,500.00 27 WOOD FLOORING 0.00 28 CARPET 0.00 29 PAINTING 5,000.00 30 FIREPLACES 0.00 31 BATH ACCESSORIES 0.00 32 APPLIANCES 8,000.00 33 MOTORIZED SHADES 0.00 34 RADON MITIGATION 0.00 35 ELEVATOR 0.00 36 FIRE PROTECTION 3,500.00 37 PLUMBING 4,000.00 38 WATER TREATMENT OPTIONS 0.00 39 HVAC 0.00 40 TEMPERATURE CONTROLS 0.00 41 ELECTRICAL 8,000.00 42 LIGHTNING PROTECTION-NOT INCLUDED 0.00 43 PHONE AND DATA AND SOUND 5,000.00 44 SECURITY SYSTEM 0.00 45 JOB OPERATING COSTS 25,000.00 47 SUBTOTAL 183,000.00 RECEIVED 47 CONTRACTOR'S OVERHEAD AND FEE-10% 20,000.00 asLiuABBT,LoiTTYAL 203,000.00 INSURANCE-1.05%OF TOTAL EST. 2,000.00 0 4/0 4/2 019 ASPEN BUILDING DEPARTMENT A B C D E 50 TOTAL VALUATION 205,000.00 51 52 USE TAX=21.%ON CONSTRUCTION MATERIALS PURCHASED OUTSIDE OF CITY LIMITS=BY OWNER 53 PERMITS AND FEES=BY OWNER 54 HOUSING, PARKS SCHOOL FEES= BY OWNER RECEIVED 04/04/2019 ASPEN BUILDING DEPARTMENT