Loading...
HomeMy WebLinkAboutSub Permit.440 N 5th St.0072.2019 (16).ARBK Sufficiency Checklist THE CITY OF ASPEN CITY OF ASPEN ENGINEERING DEPARTMENT SUFFICIENCY REVIEW REQUIREMENTS If the project will increase impervious area(this includes enlarging a driveway, adding hard surface patios, increasing the footprint of the house, etc.), disturb>200SF of exterior area(this includes grading, even if a structure or hard surface isn't added), or add or repair snowmelt then an engineering review will be required as part of the Building Permit or Landscape and Grading Permit Application review process. All permit applications that must receive an engineering review are required to schedule and participate in a Pre-Application Meeting with the Development Engineer. The sufficiency checklist below and any necessary supporting documents should be completed prior to this meeting, as they will be reviewed during the meeting. The Development Engineer's signature on this checklist is required in order to submit a Building Permit Application. Project Address: 440 North 5th Street Aspen, CO. 81611 Project Common Location/Common Name: 440 North 5th Street Aspen, CO. 81611 Parcel ID Number: 273512491007 Owner and Phone Number: Norman Jamal Contact and Phone Number and e-mail address: Richard Palardy 970-379-6391 0 1. How much land will be disturbed? acres= 0 sq.ft. If one acre or more is disturbed, a CDPHE Construction General Permit is required. Yes,Notice of Coverage has been included in the CMP. No, A statement that Notice of Coverage is not required has been included in the CMP. 2. How much impervious area will be disturbed? 0 sq.ft. Added? 0 sq.ft. 3. What is the estimated total impervious area of the site (not just the addition)? 0 sq.ft. 4. What type of permit is being sought(Building or Landscape/Grading)? Building 5. What sub-basin(see Secion 1.5 of URMP)is the project located within? N/A 6. What level of project is this—Minor or Major? Area of Disturbance is less than 100 sq.ft. In general,the project is considered"Minor"if 200— 1000 sq ft of disturbance/work and"Major" if > 1000 sq ft of disturbance/work. Revised 11-30-14 RECEIVED 04/04/2019 ASPEN BUILDING DEPARTMENT The following information is required for the engineer's review. Please indicate if these documents have been completed and are attached. If any of these documents are not applicable,please provide an explanation in the space provided. Included N/A 7. Minor Grading and Drainage Plan and Report 8. Major Grading and Drainage Plan and Report I r t 9. Compliant City of Aspen Survey O C] 10. Soils Report 11. Excavation Stabilization Plan 12. Construction Management Plan(CMP) 13. Public Improvement Requirements CI 14. Floodplain Development Requirements ® a 15. Mudflow Analysis [] D I hereby declare the engineering information submitted in this sufficiency review for this project is sufficient for City of Aspen Building Permit Application slibmittaL Applicant's Signature Date City of Aspen Development Engineer's Signature Date Revised 1130-14 RECEIVED 04/04/2019 ASPEN BUILDING DEPARTMENT