1320 Mountain View Dr.: ASI-1 Narrative
Scope of Work- The purpose of this narrative to explain interior changes made to 1320 Mountain View Dr.
We have reconfigured 2 bathrooms on the upper level utilizing the same floor area. There will be no
change to exterior fenestrations or structure.
Sheet A121- Upper level floor plan: please see bubbled areas in-between gridlines C-E & 2-5. Guest bath 1
and guest bath 2 have been reconfigured. The new configuration will occupy the same area as previously
proposed with changes only to non-structural walls. All windows will remain in original permitted positions.
We have replaced the tub in bath 207 with a new walk in shower.
Sheet A122- Upper level finish plan: please see bubbled areas in same locations as sheet A121.
Sheet A123- Upper level enlarged plan: Please see detailed dimensions of effected areas.
Sheet A124- Upper level rcp: Bedroom 1 202, Guest Bathroom 1 203, Bedroom 2 205, Guest Bathroom 2
204 all have new lighting configurations. Guest bathroom 207 have revised lighting in the new proposed
shower.
Sheet A301- Sections: Please see bubbled area in Section 1, upper level, near gridline 3. The door to access
the bathroom have been revised
Sheet A400- Please see revised stair design. Stair is in same location as originally permitted. Rise and run
remain the same. We have redesigned for a closed tread for the entire run of the stair.
Sheet A401- Please see revised stair design and updated railing and tread details.