Loading...
HomeMy WebLinkAboutFile Documents.1320 Mountain View Dr.0291.2018 (6).ARBK THUNDERBOWL ' ARCHITECTS 1320 Mountain View Dr.: ASI-1 Narrative Scope of Work- The purpose of this narrative to explain interior changes made to 1320 Mountain View Dr. We have reconfigured 2 bathrooms on the upper level utilizing the same floor area. There will be no change to exterior fenestrations or structure. Sheet A121- Upper level floor plan: please see bubbled areas in-between gridlines C-E & 2-5. Guest bath 1 and guest bath 2 have been reconfigured. The new configuration will occupy the same area as previously proposed with changes only to non-structural walls. All windows will remain in original permitted positions. We have replaced the tub in bath 207 with a new walk in shower. Sheet A122- Upper level finish plan: please see bubbled areas in same locations as sheet A121. Sheet A123- Upper level enlarged plan: Please see detailed dimensions of effected areas. Sheet A124- Upper level rcp: Bedroom 1 202, Guest Bathroom 1 203, Bedroom 2 205, Guest Bathroom 2 204 all have new lighting configurations. Guest bathroom 207 have revised lighting in the new proposed shower. Sheet A301- Sections: Please see bubbled area in Section 1, upper level, near gridline 3. The door to access the bathroom have been revised Sheet A400- Please see revised stair design. Stair is in same location as originally permitted. Rise and run remain the same. We have redesigned for a closed tread for the entire run of the stair. Sheet A401- Please see revised stair design and updated railing and tread details. RECEIVED 0/(a)300 S.Spring Street,Suite 201 Aspen,CO 81611 (C)Ryan 970.274.1421 &Matthew 970.618.1645(w)www.thunderbowlarchite1cts.c m 24/2019 ASPEN BUILDING DEPARTMENT