HomeMy WebLinkAboutFile Documents.1320 Mountain View Dr.0291.2018 (7).ARBK 1320 Mountain View_BuildingComments_1
1320 Mountain View Dr.MECHANICAL PERMIT SET.2018.12.pdf(1)
°.F Page: [2] M-200.00 MECHANICAL PLAN-FOUNDATION
LEVEL
File Name: 1320 Mountain View Dr.MECHANICAL PERMIT Provide a balanced whole house
a SET.2018.12.pdf
Author: bonniem mechanical ventilation system
M."° 'I ^�_a ns.� ,�" A' °" Subject: Mech forexistingbuttotal gut complying with Ordinance 40,
: Ye01°�[ Color: •■ 2016. Indicate the rate of air
— —� — — e gi supplied and exhausted. Indicate
., method of operation and
whether it is continuous or
periodic. Show your calculations
using this equation:
Min vent rate= ((0.01 x floor
area)+ [7.5 x(#bedrooms+ 1)])
x 0.75
1320 Mountain View Dr.STRUC. PERMIT SET.2018.12.pdf(1)
Page: 1 Revise structural sheets to
File Name: 1320 Mountain View Dr.STRUC. PERMIT
SET.2018.12.pdf include a special inspection
Author: bonniem program as required by the
Revisestmctualsheelstoincludeaspecial` ) special inspection agreement.
inspection program as required by the special Subject: Special Inspection Program
inspection agreement.List all items that require
special inspection and whether they require periodic, Color: •[ or
List all items that require special
IBC 1705 continuous Inspection In accordance with 2015 inspection and whether they
require periodic or continuous
Web alb enar, inspection in accordance with
hlkesamNe6 2015 IBC 1705.
1320 Mountain View_ARCH_PERMIT SET.2018.12.pdf(6)
Page: [1] G-000 COVER SHEET
File Name: 1320 Mountain View ARCH PERMIT An approved state demo license
SET.2018.12.pdf (not the application form but the
Author: bonniem approval license itself), must be
Aa approree stela eamo tieaaaa tam the apgmadoa roan Subject: State Demo License submitted prior to permit
but Me approval Ilcensa'asel�,must be aubmiaetl poor to CC
permit issuance.Additionally please provide the asbestos iJJUance. Additionally please
claaa air letter.
Color: •
provide the asbestos clean air
letter.
Page: [18]A-131 ROOF PLAN Show solar panels on the roof
, ,..— • ® File Name: 1320 Mountain View_ARCH_PERMIT plan to demonstrate that the
i� � ,,/ SET.2018.12.pdf
I'( ��, 21 1 Author: bonniem aspect and tilt will match the
!I — l l solar proposal and PV
Subject: PlanCheck
ill worksheet for RREMP credit.
aeI ll ,:. _ ;III,___ - Color: •
�1 Jil in-
�
sQ=�1
Page: [29]A-700 INSULATION SCHEDULE
idi la l - File Name: 1320 Mountain View_ARCH_PERMIT Add additional information
DLII9IIII:.: — SET.2018.12.pdf regarding air sealing pert e
IEEE requirements of 2015 IECC table
hillSAuthor: bonniem
ubject: PlanCheck
0� 2 a R402.4.1.1 Identify places that
^r� �' will require caulking, sealing,
m�i.. Color: ■
taping, etc. such as the transition
" 'i ' ,---1 -o from wall to roof. See City of
a Aspen Sample Air Sealing
Details for additional information.
1=IN=III 141 III — Page: [29]A-700 INSULATION SCHEDULE
m= File Name: 1320 Mountain View ARCH PERMIT This table is incorrect because it
.�_-:e_= --•--•-- SET.2018.12.pdf is from a previous edition of the
:: w:. : � - Author: bonniem code. The table can be
„ ,,,•_,._.,_ __ Subject: PlanCheck eliminated completely because
._ Color: •■ the REScheck will determine the
required U-factors and R-values
. 1 _ for this project.
Page: [29]A-700 INSULATION SCHEDULE
— File Name: 1320 Mountain View_ARCH_PERMIT Amend the Insulation and
--- SET.2018.12.pdf Window and Door Schedule
__ Author: bonniem
and/or REScheck so that the
_, Subject: PlanCheck values match. For example the
-' Color: • windows and doors are listed as
.26in the REScheck but.35 in
the schedule.
Page: [31]A-702 WINDOW SCHEDULE
0 .�.. File Name: 1320 Mountain View_ARCH_PERMIT Safety glazing is required at this
SET.2018.12.pdf location due to proximity to the
k : Author: bonniem exterior stair. R308.4.6
Subject: PlanCheck
Color: •
Energy Code Compliance-Rescheck.1320 Mountain View Dr.2018.12.pdf(1)
Page: 1 U-factors listed for the windows
��am°"°M�M^°�.m,. File Name: Energy Code Compliance-Rescheck.1320 and doors do not match the
- __ zw= Mountain View Dr.2018.12.pdf
--- F-- Author: bonniem information provided by La
_ W_ Subject: PlanCheck Cantina and Pella. Revise the
s=;_= "� REScheck to show compliance
Color: • with the higher values or provide
- - new product details showing a
= --- .26 U-factor.
Solar Proposa1.1320 Mountain View Dr.2018.12.pdf(1)
Page: 2 The REMP worksheet showed
File Name: Solar Proposa1.1320 Mountain View
__ _,_g,_._.�,__ Dr.2018.12.pdf the inverter capacity as 14.4,
Author: bonniem according to this proposal it is
®® Subject: PlanCheck only 12. Amend the REMP
Color: ■ worksheet or provide a revised
® proposal. The aspect from true
South and tilt can also be
adjusted to increase the REMP
__.�. __ E: 7.„".. credit if desired, but this needs
to be demonstrated on the roof
plan.