HomeMy WebLinkAboutFile Documents.1320 Mountain View Dr.0291.2018 (8).ARBK 1320 Mountain View_BuildingComments_2
1320 Mountain View Dr.ARCH.PERMIT SET.2019.05.pdf(2)
Page: [21]A-301 SECTIONS
File Name: 1320 Mountain View Dr.ARCH.PERMIT!,,,,,!,,,,!:,,I.:!:i-
Include a for the slab edge
e € SET.2019.05.pdf insulation. Slab-on-grade floors
Author: bonniem with a floor surface less than 12"
,a.ns, .,o below grade must have
_ • Subject: Slab edge insulation
;,�= I�' o Color: ■ insulation extending downward
A-4i•°., from the top of the slab on the
ii•t k _ _• .'_ i outside or inside of the
- -� --' foundation wall.The insulation
must be extended for by any
/T CP,r111,1I combination of vertical
insulation, insulation extending
under the slab or insulation
extending out from the building.
See the details below for
examples. The R-19 insulation
called for in your RESCheck
must extend 4'. (2015 IECC
402.2.10)
Page: [28]A-700 INSULATION SCHEDULE
File Name: 1320 Mountain View Dr.ARCH.PERMIT Correct instances where the
SET.2019.05.pdf listed insulation values differ
Milan Author: bonniem from what is listed in the
M®MIN..YYY - Subject:..... PlanCheck RESCheck and shown in the
ISBN
r.- details:
-- iN Color: •
REScheck lists the basement
®®®111®.:: _ walls as R-38 insulated concrete
-- forms and the insulation
schedule lists below grade walls
as R-15 cavity insulation + R-6
continuous exterior insulation.
Detail 9 on A 501 for the crawl
space only shows the exterior
insulation. Correct for
consistency.
- RESCheck calls for R-19
insulation for the slab on grade,
where the insulation schedule
lists R-10.
rc-report.1320 Mountain View.2019.05.pdf(2)
Page: 1 On the RESCheck,the cavity
C✓'Compliance Ce�uf1C0te File Name: rc-report.1320 Mountain View.2019.05.pdf
Author: bonniem insulation needs to be separated
Subject: PlanCheck out from the continuous
a.°° a._ Color: •
•r insulation. Per your insulation
° - , . schedule, R-21 batt insulation
-== ---- should be listed as cavity, and
R-6 outside the sheathing should
be listed as continuous.
Page: 1
File Name: rc-report.1320 Mountain View.2019.05.pdf Fill out owner and designer
Co iancempl Ce rtHkate Author: bonniem information on the REScheck,
Subject: PlanCheck and sign the signature line.
Color: ■
Solar ProposalPKG.Solaria.1320 Mountain View Dr.2019.05.pdf(1)
Page: 2 The renewable credit is based
File Name: Solar ProposalPKG.Solaria.1320 Mountain View on the lesser of the labeled
9.05.pdf
Author: bonniem
panel output power or the input
Author:
Subject: PlanCheck power of the inverter. Because
Color: • there are 2 X 6000 watt
aam:r; inverters, the capacity of the
• __-- system is limited to 12 kw which
~ = — is the REMP mitigation credit
= m that will be given based on this
proposal. (See Ordinance 40,
2011 Appendix RC Section 301)