Loading...
HomeMy WebLinkAboutFile Documents.1320 Mountain View Dr.0291.2018 (8).ARBK 1320 Mountain View_BuildingComments_2 1320 Mountain View Dr.ARCH.PERMIT SET.2019.05.pdf(2) Page: [21]A-301 SECTIONS File Name: 1320 Mountain View Dr.ARCH.PERMIT!,,,,,!,,,,!:,,I.:!:i- Include a for the slab edge e € SET.2019.05.pdf insulation. Slab-on-grade floors Author: bonniem with a floor surface less than 12" ,a.ns, .,o below grade must have _ • Subject: Slab edge insulation ;,�= I�' o Color: ■ insulation extending downward A-4i•°., from the top of the slab on the ii•t k _ _• .'_ i outside or inside of the - -� --' foundation wall.The insulation must be extended for by any /T CP,r111,1I combination of vertical insulation, insulation extending under the slab or insulation extending out from the building. See the details below for examples. The R-19 insulation called for in your RESCheck must extend 4'. (2015 IECC 402.2.10) Page: [28]A-700 INSULATION SCHEDULE File Name: 1320 Mountain View Dr.ARCH.PERMIT Correct instances where the SET.2019.05.pdf listed insulation values differ Milan Author: bonniem from what is listed in the M®MIN..YYY - Subject:..... PlanCheck RESCheck and shown in the ISBN r.- details: -- iN Color: • REScheck lists the basement ®®®111®.:: _ walls as R-38 insulated concrete -- forms and the insulation schedule lists below grade walls as R-15 cavity insulation + R-6 continuous exterior insulation. Detail 9 on A 501 for the crawl space only shows the exterior insulation. Correct for consistency. - RESCheck calls for R-19 insulation for the slab on grade, where the insulation schedule lists R-10. rc-report.1320 Mountain View.2019.05.pdf(2) Page: 1 On the RESCheck,the cavity C✓'Compliance Ce�uf1C0te File Name: rc-report.1320 Mountain View.2019.05.pdf Author: bonniem insulation needs to be separated Subject: PlanCheck out from the continuous a.°° a._ Color: • •r insulation. Per your insulation ° - , . schedule, R-21 batt insulation -== ---- should be listed as cavity, and R-6 outside the sheathing should be listed as continuous. Page: 1 File Name: rc-report.1320 Mountain View.2019.05.pdf Fill out owner and designer Co iancempl Ce rtHkate Author: bonniem information on the REScheck, Subject: PlanCheck and sign the signature line. Color: ■ Solar ProposalPKG.Solaria.1320 Mountain View Dr.2019.05.pdf(1) Page: 2 The renewable credit is based File Name: Solar ProposalPKG.Solaria.1320 Mountain View on the lesser of the labeled 9.05.pdf Author: bonniem panel output power or the input Author: Subject: PlanCheck power of the inverter. Because Color: • there are 2 X 6000 watt aam:r; inverters, the capacity of the • __-- system is limited to 12 kw which ~ = — is the REMP mitigation credit = m that will be given based on this proposal. (See Ordinance 40, 2011 Appendix RC Section 301)