Loading...
HomeMy WebLinkAboutFile Documents.134 Maple Ln.0138.2019 (5).ARBK Redline Answers to Comments 0138-2019-ARBK_134 Maple Ln_BuildingCommentl 134 MAPLE_BLDG PERMIT DRAWINGS.pdf(4) Subject: PlanCheck Skylights on roofs with a pitch Page Label: 9 Author:justinh flatter than 3:12 require a 4"curb File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf per IRC 308.6.8, please note this Color: • requirement with your other I *A note has been added to show skylight curbs. skylight notes. Subject: PlanCheck This pitch is shown in the wrong Page Label: 9 Author:justinh direction, please revise. - . File Name: 134 MAPLE BLDG PERMIT DRAWINGS.pdf v__ Tq ''' Color: ■ d i�� _o *Arrow direction has been changed to remain with increased N�Ira .., now with roof pitch change and additions �\`1/ + -1,779sf(88,9%ofTotal Drainage) LI '' Subject: PlanCheck I believe you mean to be Page Label: 12 Author:justinh specifying DensDeck rather than File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf DensGlass. Provide �"`— Color: • documentation that this is a =='=' � .F class A roof assembly(ESR *Good Catch. Documentation has been added to = v=�- -- � >--- q -A- -w_ show class A roof assembly. revise if needed. •--°—°_y_�� w Subject: PlanCheck "` .� �' ,/Page Label: 12 The max U value of.28 also Author:justinh applies to all new exterior doors __ y File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf (including the new garage door), ______ Color: ■ please revise this note to be for , both windows and doors. -_ _ *Note has been changed on the plans. d ,° --- 1 34Maple_AsbestosReport.pdf(1) V Subject: PlanCheck Page Label: 1 Please provide the actual full inspection report from Ecos for _ Author:justinh 5' this asbestos test. This lab test File Name: 134Maple_AsbestosReport.pdf Color: • report does not describe where : the test samples were taken or �__ . - * Please see new asbestos test from ECOS even provide the address that the samples were taken from. _ .__-._m_.w_ RECEIVED 08/29/2019 ASPEN BUILDING DEPARTMENT 134Maple_StructuralDrawings.pdf(2) _ 1 -_. s/Subject: PlanCheck Page Label: 1 Please provide information regarding how these columns ' lat is m„ ® Author:justinh are to be attached to the �S FIB �1 File Name: 134Maple_StructuralDrawings.pdf .. ar°�j,�„®,..- adjacent structure above and MCA — Color: ■ footings below. ++ *Attachment details have been added. ; -f - t 41- Subject: PlanCheck Page Label: 2 You list an option for steel -sigg ' ® Author:justinh construction for this beam but no 1111151110111111111 detailing for that option is IPIM_ File Name: 134Maple_StructuralDrawings.pdf Color: • provided nor is structrual steel Imentioned in any of your general *Steel construction option has been removed merle "` _ notes. Provide the associated i �� jj from the plan. low I - - © detailing and information for this iimm i structural steel option (will most ll o likely also require a special inspection agreement)or remove this option from the plan. RECEIVED 08/29/2019 ASPEN BUILDING DEPARTMENT