Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.134 Maple Ln.0138.2019 (5).ARBK
Redline Answers to Comments 0138-2019-ARBK_134 Maple Ln_BuildingCommentl 134 MAPLE_BLDG PERMIT DRAWINGS.pdf(4) Subject: PlanCheck Skylights on roofs with a pitch Page Label: 9 Author:justinh flatter than 3:12 require a 4"curb File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf per IRC 308.6.8, please note this Color: • requirement with your other I *A note has been added to show skylight curbs. skylight notes. Subject: PlanCheck This pitch is shown in the wrong Page Label: 9 Author:justinh direction, please revise. - . File Name: 134 MAPLE BLDG PERMIT DRAWINGS.pdf v__ Tq ''' Color: ■ d i�� _o *Arrow direction has been changed to remain with increased N�Ira .., now with roof pitch change and additions �\`1/ + -1,779sf(88,9%ofTotal Drainage) LI '' Subject: PlanCheck I believe you mean to be Page Label: 12 Author:justinh specifying DensDeck rather than File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf DensGlass. Provide �"`— Color: • documentation that this is a =='=' � .F class A roof assembly(ESR *Good Catch. Documentation has been added to = v=�- -- � >--- q -A- -w_ show class A roof assembly. revise if needed. •--°—°_y_�� w Subject: PlanCheck "` .� �' ,/Page Label: 12 The max U value of.28 also Author:justinh applies to all new exterior doors __ y File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf (including the new garage door), ______ Color: ■ please revise this note to be for , both windows and doors. -_ _ *Note has been changed on the plans. d ,° --- 1 34Maple_AsbestosReport.pdf(1) V Subject: PlanCheck Page Label: 1 Please provide the actual full inspection report from Ecos for _ Author:justinh 5' this asbestos test. This lab test File Name: 134Maple_AsbestosReport.pdf Color: • report does not describe where : the test samples were taken or �__ . - * Please see new asbestos test from ECOS even provide the address that the samples were taken from. _ .__-._m_.w_ RECEIVED 08/29/2019 ASPEN BUILDING DEPARTMENT 134Maple_StructuralDrawings.pdf(2) _ 1 -_. s/Subject: PlanCheck Page Label: 1 Please provide information regarding how these columns ' lat is m„ ® Author:justinh are to be attached to the �S FIB �1 File Name: 134Maple_StructuralDrawings.pdf .. ar°�j,�„®,..- adjacent structure above and MCA — Color: ■ footings below. ++ *Attachment details have been added. ; -f - t 41- Subject: PlanCheck Page Label: 2 You list an option for steel -sigg ' ® Author:justinh construction for this beam but no 1111151110111111111 detailing for that option is IPIM_ File Name: 134Maple_StructuralDrawings.pdf Color: • provided nor is structrual steel Imentioned in any of your general *Steel construction option has been removed merle "` _ notes. Provide the associated i �� jj from the plan. low I - - © detailing and information for this iimm i structural steel option (will most ll o likely also require a special inspection agreement)or remove this option from the plan. RECEIVED 08/29/2019 ASPEN BUILDING DEPARTMENT