Loading...
HomeMy WebLinkAboutFile Documents.134 Maple Ln.0138.2019 (7).ARBK Redline Answers to Comments 0138.2019.ARBK_134 Maple_Engineering1 134 MAPLE_BLDG PERMIT DRAWINGS.pdf(9) SEW Jk Page:4 Do not provide optional shoring , 71 File Name: 134 MAPLE BLDG PERMIT DRAWINGS.pdf nD„�;„,_„� — methods. Provide one plan. If °"` additional soil information is *Optional shoring methods have been removed and needed to determine the II 1,Nclarified in the plans.As Depicted in the plans the appropriate plan that information 1 East Side will use trench box shoring and the North needs to be obtained prior to A --- / L Side will use site built shoring per stamped permit issuance. OPTIONAL SHORING METHOD ID=��• °.Ien.I°°I structural drawings. 5.B rL ON SOILS OBSERVATIONS,UPPER FOUNDAT PROVIDED ADDED Page:4 No utilities are depicted on the JELLED PRIORTO LOWERIXCAVATIONSTO PROVIDED ADDEDSHOR File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf excavation stabilization plan. I Shallow and deep utilities need f` No utilities are depicted on the excavation stabilization ` *Utilities are now depicted on the excavation to be depicted in order to ensure plan.Shallow and deep utilities need to be depicted in stabilization plan. no conflicts exist. Please depict order to ensure no conflicts exist.Please depict all Ig utilities on the stabilization plan. all utilities on the stabilization jj plan. ;i 5 ORING MAY ME REQ'D. Page:4 Provide written documentation of JKSTO PREVENT SATURATION DURING RAID File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf JILDING FOUNDATIONS+SLAB ON GRADE neighbor approval for 4N,N=IGHBOR APPROVAL HAS BEEN GRANT *Neighbor approval letter was included on the construction access/layback. cover sheet of the plans and is now also Provide written documentation added to the excavation stabilization plan. of neighbor approval for construction access/layback. T.L EXISTING FNDTO REMAIN ' Page:4 v Note 7 for the North Side ---- F."1! File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf excavation indicates the area *North Side Shoring detail will be used for may be layed back as opposed,N,I,ote 7 forthe North Sideexcavation indicates north side stabilization and to shored. Please show limits of ACKe area may be layed back as opposed to la back excavation as well as hored.Pleaseshowlimits oflayback stamped engineering does are included y xcavation as well as side slopes. side slopes. 4 la with the drawings. 'CUT HERE =5'-6-5'-I w fin e a -U anIt.Slab on Grad I P PTH FROM BOSIA6=5Vx I n '! Page:4 File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf Engineering cannot sign off on a permit that says existing =R°°.°° *Excavation stabilization plan has been foundations may be used for °'I"w�e"°° shoring. Please solidify the plan fPROPERTY IJ�I� ° clarified and has been reviewed and approved and only submit what will be ommea °�°'° • by our structural engineer. See new drawings done during construction. If :PERIENctSO E and stamped shoring details. T5 !% during construction an I USEf7TO ASSIST IN SHORING (I,;',;=a,6„ alternative plan is determined, a t CONSTRUCTION ACCESS/LAYBACK on change order needs to be NI O - submitted. RECEIVED 08/29/2019 ASPEN BUILDING DEPARTMENT Page:4 Per OSHA standards vertical Per OSHA standards vertical File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf cuts cannot exceed 5' in depth. If cuts cannot exceed 5'in depth. If 6'is needed the soli must be 6'is needed the soil must be laid laid back at 1.5:1 sloe or a * Lay back will not be necessary with shoring system must be back at 1.5:1 sloe or a shoring provided. updated shoring system. system must be provided. NG NORTH SIDE 'Max.TO FOUNDA ALL LOCATED Min.2'8 t N GRA H STRADDLES PROPERTY LIN IEPTH )RING PER DETAILS+SITE OBSERVATIONS Page:4 Without a soils report, it is Withoutasoils report,it is assumed the File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf assumed the site has type C site has type C soils.Type C soils require a minimum 1.5:1 layback.Please refer to *Type C soils will be assumed.Trench box shoring soils.Type C soils require a OSHA Regulations(Standards-29 CFR). minimum 1.5:1 layback. Please Sloping and Benching-1926 Subpart P method will be used on the East Side of the App B. excavation. Bench cut will not be needed. refer to OSHA Regulations If 1.5:1 layback is not achievable,a (Standards-29 CFR). Sloping shoring system must be utilized.The 4' and Benching- 1926 Subpart P and 5'bench do not meet the OSHA standard. App B. If 1.5:1 layback is not achievable, a shoring system must be utilized. The 4'and 5' bench do not meet the OSHA standard. Page:4 File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf There is no sheet S6.002.All shoring systems need to be SEE S6.002 FOR STAMPED VERSION * Excavation Stabilization(EX 1) plan has been stamped by a professional updated and now EX 2.0 has the stamped engineer. drawings from our structural engineer. There is no sheet S6.002.All shoring systems need to be stamped by a professional engineer. Page:4 _ \ File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf Clarify where each of these shoring methods are going to be "-"""" * Plan has been updated to visually show where utilized. each shoring method will be used. av 1 o as BXIBOR•SitleStl RECEIVED 08/29/2019 ASPEN BUILDING DEPARTMENT