Loading...
HomeMy WebLinkAboutFile Documents.536 Walnut St.0118.2019 (12).ARBK EXISTING SINGLE/MULTI FAMILY RESIDENCE CONDITIONS FOLLOW THE INSTRUCTIONS BELOW: STEP 1:Click the CLEAR INPUT VALUES button to the right. STEP 2:Select a quantity from the drop down menu for the categories KITCHEN-SPA/HOT TUB in the existing residence in the table below.The pool and irrigated landscape categories do not have drop down menus,enter gallons and square feet respectively. CATEGORY INPUT KITCHEN 1 STEP 2B:Select the existing domestic line size and tap size at the main from the drop down menus in the table below. LAUNDRY ROOM 1 APPLICANT INPUT CELL=- BEDROOM 4 CATEGORY METER SIZING CHART OFFICE 0 EXISTING DOMESTIC LINE SIZE(in) UNKNOWN SERVICE LINE SIZE(in) MINIMUM ECU BATHROOM 4 EXISTING TAP SIZE AT THE MAIN(in) UNKNOWN 3/4 1.0 HALF BATHROOM/POWDER ROOM 2 1.0 2.0 KITCHEN EFFICIENCY 1 1 1/2 4.0 HOSE BIB 0 2.0 8.0 SPA/HOT TUB 0 POOL(GALLONS) IRRIGATED LANDSCAPING(SF) STEP 3:Click the GENERATE REPORT button to the right. This button creates a table for additional required information for each quantity of Kitchens,Laundry Rooms,Bathrooms,and Spa/Hot Tub for the proposed residence. STEP 4:Select a value from the drop down menu for each fixture type in the tables created below.Use the Down Arrow button to navigate the applicant input cells instead of the Tab button. KITCHEN:ENTER QUANTITY OF FIXTURES KITCHEN 1 SINK iREFRIGERATOR DISHWASHER GARBAGE DISPOSAL POT FILLER/ADDITIONAL SINK BAR/HAND SINK STAND ALONE ICE MACHINE LAUNDRY ROOM:ENTER QUANTITY OF FIXTURES LAUNDRY ROOM 1 LAUNDRY/UTILITY SINK/DOG WASH WASHING MACHINE BATHROOM:ENTER QUANTITY OF FIXTURES BATHROOM 1 BATHROOM 2 BATHROOM 3 BATHROOM 4 TOILET 1 TOILET 1 TOILET 1 TOILET 1 SINK 1 SINK 1 SINK 1 SINK WASHING FACILITY 1 WASHING FACILITY 1 WASHING FACILITY 1 WASHING FACILITY 1 URINALIIIL URINAL URINAL URINAL BIDET BIDET BIDET BIDET ADDITIONAL TOILET ADDITIONAL TOILET ADDITIONAL TOILET ADDITIONAL TOILET ADDITIONAL SINK ADDITIONAL SINK ADDITIONAL SINK ADDITIONAL SINK ADDITIONAL WASHING FACILITY ADDITIONAL WASHING FACILITY ADDITIONAL WASHING FACILITY ADDITIONAL WASHING FACILITY OVERSIZED BATHTUB OVERSIZED BATHTUB OVERSIZED BATHTUB OVERSIZED BATHTUB 1 WHIRLPOOL UPGRADE/JETS WHIRLPOOL UPGRADE/JETS WHIRLPOOL UPGRADE/JETS WHIRLPOOL UPGRADE/JETS STEAM ROOM/SHOWER STEAM ROOM/SHOWER STEAM ROOM/SHOWER STEAM ROOM/SHOWER STEAM SHOWER UPGRADE STEAM SHOWER UPGRADE STEAM SHOWER UPGRADE STEAM SHOWER UPGRADE HALF BATHROOM: HALF BATHROOM 1 HALF BATHROOM 2 TOILET 1 TOILET 1 SINK 1 SINK 1 STEP 5:Proceed to the INTERIOR REMODEL sheet or NEW-REDEVELOPMENT sheet at the bottom of the screen and follow the directions to enter values for the proposed residence. RECEIVED 04/17/2019 ASPEN BUILDING DEPARTMENT