HomeMy WebLinkAboutFile Documents.536 Walnut St.0118.2019 (12).ARBK EXISTING SINGLE/MULTI FAMILY RESIDENCE CONDITIONS
FOLLOW THE INSTRUCTIONS BELOW:
STEP 1:Click the CLEAR INPUT VALUES button to the right.
STEP 2:Select a quantity from the drop down menu for the categories KITCHEN-SPA/HOT TUB in the existing residence in the table below.The pool and irrigated landscape categories do not have drop down menus,enter gallons and square feet respectively.
CATEGORY INPUT
KITCHEN 1 STEP 2B:Select the existing domestic line size and tap size at the main from the drop down menus in the table below.
LAUNDRY ROOM 1
APPLICANT INPUT CELL=- BEDROOM 4 CATEGORY METER SIZING CHART
OFFICE 0 EXISTING DOMESTIC LINE SIZE(in) UNKNOWN SERVICE LINE SIZE(in) MINIMUM ECU
BATHROOM 4 EXISTING TAP SIZE AT THE MAIN(in) UNKNOWN 3/4 1.0
HALF BATHROOM/POWDER ROOM 2 1.0 2.0
KITCHEN EFFICIENCY 1 1 1/2 4.0
HOSE BIB 0 2.0 8.0
SPA/HOT TUB 0
POOL(GALLONS)
IRRIGATED LANDSCAPING(SF)
STEP 3:Click the GENERATE REPORT button to the right.
This button creates a table for additional required information for each quantity of Kitchens,Laundry Rooms,Bathrooms,and Spa/Hot Tub for the proposed residence.
STEP 4:Select a value from the drop down menu for each fixture type in the tables created below.Use the Down Arrow button to navigate the applicant input cells instead of the Tab button.
KITCHEN:ENTER QUANTITY OF FIXTURES
KITCHEN 1
SINK iREFRIGERATOR
DISHWASHER
GARBAGE DISPOSAL
POT FILLER/ADDITIONAL SINK
BAR/HAND SINK
STAND ALONE ICE MACHINE
LAUNDRY ROOM:ENTER QUANTITY OF FIXTURES
LAUNDRY ROOM 1
LAUNDRY/UTILITY SINK/DOG WASH
WASHING MACHINE
BATHROOM:ENTER QUANTITY OF FIXTURES
BATHROOM 1 BATHROOM 2 BATHROOM 3 BATHROOM 4
TOILET 1 TOILET 1 TOILET 1 TOILET 1
SINK 1 SINK 1 SINK 1 SINK
WASHING FACILITY 1 WASHING FACILITY 1 WASHING FACILITY 1 WASHING FACILITY 1
URINALIIIL URINAL URINAL URINAL
BIDET BIDET BIDET BIDET
ADDITIONAL TOILET ADDITIONAL TOILET ADDITIONAL TOILET ADDITIONAL TOILET
ADDITIONAL SINK ADDITIONAL SINK ADDITIONAL SINK ADDITIONAL SINK
ADDITIONAL WASHING FACILITY ADDITIONAL WASHING FACILITY ADDITIONAL WASHING FACILITY ADDITIONAL WASHING FACILITY
OVERSIZED BATHTUB OVERSIZED BATHTUB OVERSIZED BATHTUB OVERSIZED BATHTUB 1
WHIRLPOOL UPGRADE/JETS WHIRLPOOL UPGRADE/JETS WHIRLPOOL UPGRADE/JETS WHIRLPOOL UPGRADE/JETS
STEAM ROOM/SHOWER STEAM ROOM/SHOWER STEAM ROOM/SHOWER STEAM ROOM/SHOWER
STEAM SHOWER UPGRADE STEAM SHOWER UPGRADE STEAM SHOWER UPGRADE STEAM SHOWER UPGRADE
HALF BATHROOM:
HALF BATHROOM 1 HALF BATHROOM 2
TOILET 1 TOILET 1
SINK 1 SINK 1
STEP 5:Proceed to the INTERIOR REMODEL sheet or NEW-REDEVELOPMENT sheet at the bottom of the screen and follow the directions to enter values for the proposed residence.
RECEIVED
04/17/2019
ASPEN
BUILDING DEPARTMENT