Loading...
HomeMy WebLinkAboutFile Documents.150 Roaring Fork Dr.0010-2019-BCHO (9) C. Building Department Responsibilities: 1. Approve special-inspection program.The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection.Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. His/Her approval,in addition to that of the special inspector,must be obtained prior to placement of concrete,covering of structural steel,or other similar materials. 3. Review inspection reports.The building official should review special-inspection progress and final reports. 4. Perform final inspection.The building official should perform the final inspection and approval for a project[IBC Sec. 109.3.1]after the final special-inspection report has been reviewed and approved. Project Address: 150 Roaring Fork Drive Permit Number: 0010-2019-BCHO ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special inspection Signature Printed Name Date Email Agency*** *riS aff6 _ I r r t�l . _ w ".ertSf4 t'(Ofi iS , _s O k f tE} �'l —c..Cc)y \ Owner* Sign ture Printed Name Da e Email v. -sC-6.1ci, rv, .'€t/. ,-,PAAAL h 11 e)c/ MO I (LO,Dn Ve 4n Design Professional in ignature Printed Nam Date Email Responsible Charge*/** 1 ('-'&(...41,10, 2,e ., _ .51/40? Si'n e I?.le" /2////i, ,Shalt<115;e:e4//:AVe7/ ./ Contractor Signature Printed Name Date Email Ci`' Myers&Company Dennis Clemons 12/10/2019 dclemons@mversandco.corn Approved Signatu Printed Name Date Email Fabricator*** Inspected Signature Printed Name Date Email Fabricator*** City of Aspen Building Department: Signature Printed Name Date Email *Either the Owner or the Design Professional in Responsible Charge must sign **The Design Professional in Responsible Charge is not required to sign if they perform the duties as described in item C above •**Either the Approved Fabricator or Inspected Fabricator must sign If all work is performed in the shop of an Approved Fabricator.the Special Inspection Agency signature is not required(no field work) I WY 1 i I.. Ruildin;; Department Responsibilities: 1. tpprutir special-inspection program. Inc buildrn .lep.utmcut ,h,r;l,.hp.io' .r,,,h.:,.;.11 . • . _ , ,m ,,,w,,,Cmt„t, _. Li+tut cc m.pu•i.►i iuspcarwu. 11.,ti.I.:Lowui sl:�.iai Iriapcui.,rr anoi il.: ouriuniE.111Npvtri.N .uai, monitor the performance of special inspectors. Ills ller approval,in addition to that of the special tnsnector, roust he obtained prior to placement of concrete,covering of structural steel.or other ?. Re%ten inspection reports.The building official should review special-inspection progress and 4. Perform final inspection.The huildinu official should pertirrm the final inspection and upnrnv,il . ..;-: ,I lit Sec. 1(00.3.1 i after the final special-inspection report has been re%ie scd and approt,ed� Pi t)leit '.ddress: 1 'DV Y ��rl�.J_ . Permit \umber: \('liAt)w1.i:1)(,\lf:s"14 % I hay read and agreej05 cot ply with the co idnions oldie,agreement. r 1 i ' ' s'- , n _ ;�e ., . „ rr 4 r., s n / D� tJT 1�� f-rn.rrl Signature tinted Name Date Linn„ C C r .-.u. y,,,,,,ril\aisle Uatc l.ri;s;. Signature Printed name Date Finail -.1 F.. .it.. .a. Piii.tsd\.clue Date Liii.t;, i.. r. .. _ '' ,{ti,inr,• Elate Fnitiii t ti, t,t .lspcn Builrisng _Department. Signature Signature Printed Name Date Email . .,;i F..t «.,r or i -pe-t d Fahricatur must sign It all uort:is perti ntted in the shop of an \pproied Fahicatoi.the Spec z ,.:,•, . I,.1... .rYd I rill 6:Id'a„rt l