HomeMy WebLinkAboutFile Documents.150 Roaring Fork Dr.0010-2019-BCHO (8) C. Building Department Responsibilities:
1. Approve special-inspection program.The building department shall approve all special
inspectors and special-inspection requirements.
2. Enforce special inspection.Work requiring special inspection and the building inspector shall
monitor the performance of special inspectors. His/Her approval,in addition to that of the special
inspector,must be obtained prior to placement of concrete,covering of structural steel,or other
similar materials.
3. Review inspection reports.The building official should review special-inspection progress and
final reports.
4. Perform final inspection.The building official should perform the final inspection and approval
for a project[IBC Sec. 109.3.1]after the final special-inspection report has been reviewed and
approved.
Project Address: 150 Roaring Fork Drive Permit Number: 0010-2019-BCHO
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special inspection Signature Printed Name Date Email
Agency***
*riS aff6 _ I r r t�l . _ w
".ertSf4 t'(Ofi i5 , _s O k f tE} YVl —c..Cc)w\
Owner* Sign ture Printed Name Da e Email �1'
Design Professional in ignature Printed Nam Date Email
Responsible
Charge*/** 1
('-'&(...41,10, 2,e ., _ .51/40? Si'n e I?.le" /2////i, ,Shalt<115;e:e4//:AVe7/ ./
Contractor Signature Printed Name Date Email Ci`'
Myers&Company Dennis Clemons 12/10/2019 dclemons@mversandco.corn
Approved Signatu Printed Name Date Email
Fabricator***
Inspected Signature Printed Name Date Email
Fabricator***
City of Aspen Building
Department: Signature Printed Name Date Email
*Either the Owner or the Design Professional in Responsible Charge must sign
**The Design Professional in Responsible Charge is not required to sign if they perform the duties as described in item C above
•**Either the Approved Fabricator or Inspected Fabricator must sign If all work is performed in the shop of an Approved Fabricator.the Special
Inspection Agency signature is not required(no field work)
RECEIVED
05/05/2020
ASPEN
BUILDING DEPARTMENT
I WY 1 1
t.. fiuildin Department Responsibilities:
1. ppros special-inspection program. Inc butidutg dep.utmcut sh,i;l,;hl»u� sits spe�;al
. •
Libtut cc r,pu i iuspcatruu. 11.,tis reywuuF;spsi.1 i I sj>u it,.,rr auri iL, tsuridut ,u,lrct..l.'r suai,
nxmttor the performance of special inspectors. Ills lIer approval,in addition to that of the special
Inspector" must he obtained prior to placement of concrete,covering of structural steel.or other
?. Re%ten inspection reports.The building official should review special-inspection progress and
4. Perform final inspection.The hutldin official should pertirrm the final inspection and upnrnv,tl
II1( Sec. 1(00. .1 j after the final special-inspection report has been re%ie scd and
appro'.ed�
t'rttjcit kddress: �V Y �rl�.J/ Permit \umber:
cC
\('liAt)w1.i:I)(,\lf:s"14
I hav read and agrey4 cot ply with the co idnions of this agreement.
s'-
f-rn.trl
Si nature rioted Name Date Linn„
C ci C
.-,u i'rutt il\aisle Uatc S.tr,s;.
Signature Printed name Date h.mail
Date
i.. r.
ti,tnr,• Elate rvu
t tt, tl: ,lspcn Burldmg _Department. Signature Signature Printed Name Date Email
F..t «.,-r or hope-t d Fah..catur must sign It all uort:is perti ntted in the,ltop or an \pproi ed Fahieatm.the Spo:l..1
:+, n.1... scd t DO 6:ld' rt
RECEIVED
05/05/2020
ASPEN
BUILDING DEPARTMENT