Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0014-2021-BCHO 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM I CITY OF ASPEN VERSION I I UPDATED MARCH 2.2017 PROJECT ADDRESS: Parcel ID#: Permit Number: ADD INFO 0014-2021-BCHO CONTACT INFORMATION : Owner: Name: Aspen Extreme II,LLC City: Aspen Address: 395 Thunderbowl Lane State: CO Email: Zip Code: 81611 Phone: 970-925-3444 Cell Phone: Owner's Representative: Name: David Johnston City: Aspen I Address: 119 S Spring St. State: CO Email: david@djarchitects.com Zip Code: 81611 Phone: 970-925-3444 Cell Phone: A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool,spa,and solar/GSHP information: M-124, M-602, M-603, E-104, E-501,A-2.1, L-100 Do you have snowmelt or a spa that has been exempted by the buiding official? O Yes(enter soft below on the exempt row) 0 No Hydro Snowmelt Electric Snowmelt Pool Spa Existing To be Removed Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New 4367.28 sqft 215.00 sqft 80.00 sqft New(exempt) 18.00 sqft Total on site 4385.28 sqft 0.00 sqft 215.00 sqft 80.00 sqft Total Snowmelt on site 4385.28 sqft Boiler Efficiency 98.0% I 100% 98.0% 98.0% Mitigation Fee $151,517.88 $ 29,836.73 $ 14,367.35 Total Fee for Mitigation: $ 195,721.96 B. ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit Use PV Worksheet Photovoltaic System $ 64,874.87 Use Thermal Worksheet Hot Water Panels $ - Use GSHP Cert Ground Source Heat Pump $ - Other Approved System $ - Total Mitigation Credits: $ 64,874.87 Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 28.51 or How many square feet of SHW(solar hot water)would I need? 871.23 R-REMP Fee: $ 130,847.09 Amount Previously viously Paid on This Permit: m 7 6.47..Q9 TOTAL R-REMP FEE : $ 1 Refund(includes minus$750): $ 6,050.00 C. PREPARED BY: Date: 1/2/2021 Print Name: David Denio I t' Signature: — c l,e ` `' REFUND AVAILABLE Phone&EMail: 970-748-8520,david@aec-vail.com REVIEWED: s i C 0 VS ate: mi 03/30/2021 j FORCODELXMLIARCE ASPEN nickt BUILDING DEPARTMENT