HomeMy WebLinkAboutFile Documents.210 S West End St.0111.2019 (14).ARBK May 19,2019
G A L A M B O 5
ARCHITECTS INC.
Drainage Narrative for 210 S West End Street—Sack
Proposed work for this project includes all new roofing, gutters and downspouts. Downspouts will
discharge water in the same location as existing downspouts. New roof areas will tie into existing gutters
and/or downspouts to discharge in a similar location.
A new Flo-Well is proposed to handle runoff from a driveway replacement. The driveway is shorter than
existing due to the proposed expansion of the garage.
Any disturbance of site(excavation for new waterline)will be graded and revegetated to match existing.
Reviewed by Engineering
10/09/2019 9:00:21 AM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen.The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements."The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.
RECEIVED
Bldg 314 Suite D AABC•Aspen,Colorado 81611 0 5/2 0/2 019
P:970-429-1286• F:970-429-1296
E:gainc@galambosarchitects.net ASPEN
BUILDING DEPARTMENT