Loading...
HomeMy WebLinkAboutFile Documents.210 S West End St.0111.2019 (14).ARBK May 19,2019 G A L A M B O 5 ARCHITECTS INC. Drainage Narrative for 210 S West End Street—Sack Proposed work for this project includes all new roofing, gutters and downspouts. Downspouts will discharge water in the same location as existing downspouts. New roof areas will tie into existing gutters and/or downspouts to discharge in a similar location. A new Flo-Well is proposed to handle runoff from a driveway replacement. The driveway is shorter than existing due to the proposed expansion of the garage. Any disturbance of site(excavation for new waterline)will be graded and revegetated to match existing. Reviewed by Engineering 10/09/2019 9:00:21 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen.The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements."The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. RECEIVED Bldg 314 Suite D AABC•Aspen,Colorado 81611 0 5/2 0/2 019 P:970-429-1286• F:970-429-1296 E:gainc@galambosarchitects.net ASPEN BUILDING DEPARTMENT