Loading...
HomeMy WebLinkAboutFile Documents.1001 E Cooper Ave.0039.2019 (20).ARBK rowland+broughton architecture/urban design/interior design 234 a hopkins ave. 1830 blake st,ste 200 cl) (I) O aspen,co 81611denver,co 80202 303.308.aspen,t nts:f 303.308.1375 f Consultants: 004 KL&A,I ana n1.• Ilders 3P-2 1/4' T-5" /Il O% � .,..=,ft .a 8'-11 3 (E)2-WYTHE .a.�..a.�a .aa�4 BRICK BEARING WALL Issue: -_-__ 1 \\ \ N , , , , \N ,- - O is 3 z-. b A :N 3 *• A (N)FN N WALL 1 N ,� ,,\ 3* S v I A A A AA A .O VAA ��V - - _riTS&EQUIPMENT ^I L -42'_WW " �I— �� _ N W c gQ r-- - I I rl 1 3/4'x7 1/4"LVL016'0C (E)MASONRY WALL HSS COL RE PLAN I�J j 4-r-- ——- A W 9 (E)FLOOR FRAMING L__11 III W Q 3/4 x6 x0'-8'BASE PL _ �H/ OSAL L - pV� 3/I6 W/(2)3/4'#EXPANSION k�tiTR `� $o Z I ANCHORS INTO(E)FNDN WALL —�Al,Iy6 \ M Pc'c�i 1 I/2'NON-SHRINK GROUT UP (N)ISOLATED FTG OFNDN WALL \, In mu U „„ ?o TV TV +a OfV z COLUMN DURING,62 NOTE A ICONSTRUCTION, (E)FNDN WALL - 0 1 7I .LY BRACE , o PER OSHA REQ'S II ':I f�No J N �� 0)7" OL 111 AI m�W rP N qi g \1 O ,,o �������wvvvvvvvvvvvvvvvvv��� �vvvvvv) t -� �o�o 0c500 �pDOIIIs � I �3y STa %. 389 � W O STL COL BASEPLATE DETAIL O MAIN LEVEL FRAMING AND FOUNDATION PLAN j •-o:m Z:c zQ 3 1 ''o 1"=1'-0" 1/4"=1'-0" I p%`•,05/14/2019 ` /IIII ss/DNA..•�*�� �,z WZR II `� z g FOUNNATION PI AN NOTFS• 1`� ��� W> m c� 1. TYPICAL FLOOR IS 4'SLAB-ON-GRADE W/f3018'OC,EW z W CHAIRED TO MID-DEPTH.RE:PLAN FOR T/SOG -m ELEVATIONS.RE:GENERAL NOTES FOR SUBGRADE PREPARATION. zo<2 2. TYPICAL FOUNDATIONS ARE SPREAD FOOTINGS.RE: GENERAL NOTES AND 2/5-200 FOR ADDITIONAL W INFORMATION. i o ti 3. TYPICAL EXTERIOR WALL IS 8'CAST-IN-PLACE CONCRETE z z S WALLS,UNO. REINF W//5015'OC EW,CENTERED. E. 4. SEE PLANS FOR T/FTG AND T/CONC ELEVATIONS VILLAGER 2 4y R m 5. RE:SHEETS S101-S102 FOR GENERAL NOTES AND LEGENDS. S° 6. RE:SHEETS S103-S104 FOR TYPICAL DETAILS. U412 ro" z z w FOOTING NOTFSL w w�3 1. FOOTINGS SHALL BEAR ON PROOF ROLLED NATIVE SOIL OR a" COMPACTED FILL. ti WD COLUMN RE: z z c 2. ALL BEARING MATERIAL SHALL BE INSPECTED BY THE 0 0 PLAN;SIMPSON GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT. POST BASE THE GEOTECHNICAL ENGINEER SHALL BE THE SOLE JUDGE car,`o FOUNDATION WALL AS TO THE SUITABILITY OF THE BEARING MATERIAL. W z 3. CENTER CONTINUOUS FOOTING UNDER WALLS AND COLUMN y s Do WL TO MATCH WALL VERT FOOTINGS UNDER COLUMNS,UNO. 'u o;ti REINF,ALTERNATE HOOK 4. BEARING ELEVATIONS ARE SUBJECT TO ADJUSTMENT AS '_- ¢ DIRECTION IN FOOTING REQUIRED BY SUITABILITY OF BEARING MATERIAL. Q01 T/FTG `� 5. DOWELS TO MATCH VERTICAL WALL AND PILASTER Pg T/FTG REINFORCING,UNO.EXTEND DOWELS 24'MIN ABOVE z m.- =T/(E)FTG FOOTING,UNO. =o �i Eill FOOTING 6. RE GENERAL NOTES FOR ADDITIONAL INFORMATION. "'h? REINF FTC W/(3)/5 In EW,BOTT �'- oBREINF on (2)/5 LONG, o EQ EQ 3'CLR ��� 1.-, i.,1 1,-6' AI' W z SQUARE rWd o y TYPICAL COLUMN FOOTING TYPICAL WALL FOOTING ,-,-3 c FOOTING NOTES: PROJECT NO: e W o Fill out �—''_' 1. FOOTINGS SHALL BEAR ON PROOF ROLLED NATIVE SOIL OR COMPACTED FILL. W 2. ALL BEARING MATERIAL SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT. c>S? THE GEOTECHNICAL ENGINEER SHALL BE THE SOLE JUDGE AS TO THE SUITABILITY OF THE BEARING MATERIAL. z 3 3. FOOTINGS DESIGNED FOR ALLOWABLE BEARING PRESSURE OF 2.0 KSF. vs 4. CENTER CONTINUOUS FOOTING UNDER WALLS AND CENTER COLUMN FOOTINGS UNDER COLUMNS,UNO. SHEET TITLE o,L 0 5. BEARING ELEVATIONS ARE SUBJECT TO ADJUSTMENT AS REQUIRED BY SUITABILITY OF BEARING MATERIAL. 64-] 7. RE:w6. COLUMN SCHEDULE TO MATCH TAND WALL DETAILS FOR FOOTING DOWELS.ICAL WALL AND PILASTER REINF UNO END OWLS 24'MIN ABOVE FTC UNO. FOUNDATION PLAN w= 8. RE:GENERAL NOTES FOR ADDITIONAL INFORMATION. W �Wy HWy t W c?> SCALE: As indicated W�ZO 'i o O FOOTING DETAILS S-200 ��=o NTS U 0'` yWH_ It WOOD: 55Qo o ®2018,KL&A,INC d rowland+broughton architecture/urban design/interior design 234 a hopkins ave. 1830 blake st,ste 200 aspen,co 81611 denver,co 80202 970.544.9006 0 303.308.1373 0 970.544.3473 f 303.308.1375 f Consultants: pin, KL.AIn ethers Issue: qi c cl) c- 1 31'-2 I/4' I _7.-5" y 31'-21/4" .--c€i�hdc IX (N)ROOF FRAMING ABOVE 1 EXTERIOR DOO z 8'-11 3/4" "' 8'-11 3/4" 4 w XI 5-40 �,� CONDENSER UNIT 5-400 a a 1 3 a x7 1 a Lm®2a'oc nE\Ess v. - Fy fff __� SEAT I 1 ABOVE \ M SIZE AND CONNECTION 1:11 __— _—_—_—_— — — �.1 13134x1178...LVL 2 M :TH Pc' w¢ L.., „� DEMOLITION OF FINISHES S-40tl M 30t O — - rr - / / \ O WEIGHTS&EQUIPMENT S - -- 3 —WEIGH _ ,EQUIPI - ---- 3 iz w co., SIMPSON HUC HANGERS imo j `°+ S-4 PERMANENT CUSTOM I13/ex71 44LVLO1r0C o>y AT LVL-TO-LVL CONNECTION __ / COL FROM ABOVE;EXTENDS TO / / 1 \ d F:OA., _ FABRICATED EGRESS FNDN BELOW;PROVIDE NAILER II I I aeR ? = ^ I I J LADDER AT FACE OF COLUMN FORII ODE - 1 3 4'x7 1/4 LVLO24"OC _ - ATTACHMENT OF(E)SHEATHING, 4,c z ,x / f (3 1 3/a x7_1/a"LVL _ III 11 EXTEND(E)CMU WALL BOTH DIRECTIONS --- --— ---ti WOW N (E)ROOF FRAMING "'�I F- TO U/S(N)ROOF SHEATHING; ` -I N mow ^ SIZE AND ADHESIVE DOWEL MECHANICAL v IV' ° o 3 rn Il ryI, �, .o CONNECTION INTO(E)SHALL CHASE �I 6Off' OP m w \ BE DETERMINED UPON (E)FLOOR FRAMING - M1x W c I-.-1 DEMOLITION '„ I Lh� - i a- -- (4)1 3/4"x7 1/4"LVL 1 11 f � W8x24 ^ s=omo �� :142 -- TV 0 00 al --® TV \ �3a� -- III' 'I Iry / / ° � ar ��A�����\ ,/,..,,//: Leg ll UO / 134x714"LVL®24"O y ,.m `�� \‘\ =�= I I I / u Izo O \ =0PD.C/llFlllll �� 0 I HI �- - C j�o - % �'/r389 6 zI-H od 1 2'-6" I 2'-10"/ I / 8'-81/4" 8'-101/4" SN4 4 t 05/14/2019 SZ 1Il1ONAL AW DOOR FNFATH DOOR RFNFATH \ �� p.Ed ICI ,AIRS STAIRS m�� >2'W m�`2 ROOF FRAMING PLAN UPPER LEVEL FRAMING PLAN 2 1/4"=1'-0" 1/4"=1'-0" 111 =m VILLAGER 2 0 0 ROOF PLAN NOTES: LIPPFR LEVEL/IOW ROOF PLAN NOTES: 1;!', 1. TYPICAL ROOF IS FINISHES AND INSULATION OVER 3/4' OSB/PLYWOOD ROOF SHEATHING OVER WOOD JOISTS. I, TYPICAL FLOOR IS ARCHITECTURAL FINISHES OVER 3/4" T&G OSB/PLYWOOD FLOOR SHEATHING OVER WOOD I- ATTACH ROOF SHEATHING WITH 8dO6"OC AT EDGES AND JOISTS.TYPICAL FLOOR SHEATHING ATTACHMENT IS GLUE w w 011'OC IN FIELD,UNO. AND NAIL WITH 8d06"0C AT EDGES AND 012"0C IN FIELD, a " 2. RE:TYPICAL WOOD HEADER TABLE"FOR HEADER SIZING WO. z z AND NUMBER OF TRIMMER STUDS WHERE INDICATED 2. TYPICAL(N)EXTERIOR WALL IS 1/2"OSB/PLYWOOD WALL N o z HDR"ON PLAN. SHEATHING ON 2x6 DFL STUDO16"OC,UNO.ATTACH WALL 5 g S 3. WHEN NOT SPECIFIED AS NOV,MINIMUM NUMBER OF SHEATHING WITH 8d®6'OC AT EDGES AND 012"0C IN o m KING STUDS EACH SIDE OF OPENING IS EQUAL TO HALF FIELD. J H w THE NUMBER OF STUDS INTERRUPTED BY HEADER PLUS 3. TYPICAL INTERIOR STRUCTURAL WALL IS 2x6 DFLSTUDO y ONE,(2)MIN.RE:TYPICAL WOOD HEADER TABLE"FOR 16"0C,UNO. Lg m 5 ATTACHMENT OF HEADER TO KING STUDS. 4. TYPICAL COLUMN IS(3)2x6 DFL STUD,UNO. �'� 4. COORDINATE JOIST LAYOUT WITH LIGHTING LOCATIONS, 5. RE:TYPICAL WOOD HEADER TABLE'FOR HEADER SIZING Q 5 c RE:ARCH. AND NUMBER OF TRIMMER STUDS WHERE INDICATED NOR" 5. RE:SHEETS S101-S102 FOR GENERAL NOTES AND ON PLAN, z 9?.. LEGENDS. 6. WHEN NOT SPECIFIED AS'HDR",MINIMUM NUMBER OF o z y 6. RE:SHEETS S103-S104 FOR TYPICAL DETAILS. KING STUDS EACH SIDE OF OPENING IS EQUAL TO HALF y a z THE NUMBER OF STUDS INTERRUPTED BY HEADER PLUS z W-- ONE,(2)MIN.RE:TYPICAL WOOD HEADER TABLE"FOR o>o ATTACHMENT OF HEADER TO KING STUDS. 7. RE:ARCH FOR WINDOW AND DOOR LOCATIONS. c s ra 8. COORDINATE JOIST LAYOUT WITH LIGHTING LOCATIONS,RE: i W ARCH. W O 9. RE:SHEETS S101-S102 FOR GENERAL NOTES AND LEGENDS. o 0 10. RE:SHEETS S103-S104 FOR TYPICAL DETAILS. �'Oy so D,a PROJECT NO: e W Fill out U� C W Z8, o z c SHEET TITLE: y0 j iW-i FRAMING PLANS g' UW ,Wy yWy W o § ?? SCALE: As indicated Mil Wwoz S �//\/l 0 1 5Q ���Q W ®® Uo n L.L. §o ��QO 62018,KL&A,INC d