HomeMy WebLinkAboutFile Documents.1001 E Cooper Ave.0039.2019 (20).ARBK rowland+broughton
architecture/urban design/interior design
234 a hopkins ave. 1830 blake st,ste 200
cl) (I) O aspen,co 81611denver,co 80202
303.308.aspen,t nts:f 303.308.1375 f
Consultants:
004 KL&A,I ana n1.• Ilders
3P-2 1/4' T-5" /Il O% � .,..=,ft
.a
8'-11 3 (E)2-WYTHE .a.�..a.�a .aa�4
BRICK BEARING WALL Issue:
-_-__ 1 \\ \ N , , , , \N ,- - O
is
3
z-. b A :N
3 *• A (N)FN N WALL 1 N ,�
,,\ 3* S v
I A A A AA A .O VAA ��V -
- _riTS&EQUIPMENT ^I L
-42'_WW " �I— �� _ N
W c gQ r-- - I I rl 1 3/4'x7 1/4"LVL016'0C
(E)MASONRY WALL
HSS COL RE PLAN I�J j
4-r-- ——- A
W 9 (E)FLOOR FRAMING L__11 III
W Q 3/4 x6 x0'-8'BASE PL _ �H/ OSAL L - pV�
3/I6 W/(2)3/4'#EXPANSION k�tiTR `�
$o Z I ANCHORS INTO(E)FNDN WALL —�Al,Iy6 \ M
Pc'c�i 1 I/2'NON-SHRINK GROUT UP (N)ISOLATED FTG OFNDN WALL \,
In
mu
U „„
?o TV TV +a OfV
z COLUMN DURING,62 NOTE A ICONSTRUCTION, (E)FNDN WALL - 0 1 7I .LY BRACE ,
o PER OSHA REQ'S II ':I f�No J N
�� 0)7" OL 111 AI
m�W rP N
qi
g \1 O
,,o �������wvvvvvvvvvvvvvvvvv��� �vvvvvv) t -�
�o�o
0c500
�pDOIIIs
� I
�3y STa %. 389 �
W O STL COL BASEPLATE DETAIL O MAIN LEVEL FRAMING AND FOUNDATION PLAN j •-o:m Z:c zQ 3 1
''o 1"=1'-0" 1/4"=1'-0" I p%`•,05/14/2019 `
/IIII ss/DNA..•�*��
�,z
WZR
II `�
z g FOUNNATION PI AN NOTFS• 1`� ���
W>
m c� 1. TYPICAL FLOOR IS 4'SLAB-ON-GRADE W/f3018'OC,EW
z W CHAIRED TO MID-DEPTH.RE:PLAN FOR T/SOG
-m ELEVATIONS.RE:GENERAL NOTES FOR SUBGRADE
PREPARATION.
zo<2 2. TYPICAL FOUNDATIONS ARE SPREAD FOOTINGS.RE:
GENERAL NOTES AND 2/5-200 FOR ADDITIONAL
W INFORMATION.
i o ti 3. TYPICAL EXTERIOR WALL IS 8'CAST-IN-PLACE CONCRETE
z z S WALLS,UNO. REINF W//5015'OC EW,CENTERED.
E. 4. SEE PLANS FOR T/FTG AND T/CONC ELEVATIONS VILLAGER 2
4y R m 5. RE:SHEETS S101-S102 FOR GENERAL NOTES AND
LEGENDS.
S° 6. RE:SHEETS S103-S104 FOR TYPICAL DETAILS.
U412
ro"
z z w FOOTING NOTFSL
w w�3 1. FOOTINGS SHALL BEAR ON PROOF ROLLED NATIVE SOIL OR
a" COMPACTED FILL.
ti WD COLUMN RE:
z z c 2. ALL BEARING MATERIAL SHALL BE INSPECTED BY THE
0 0 PLAN;SIMPSON GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT.
POST BASE THE GEOTECHNICAL ENGINEER SHALL BE THE SOLE JUDGE
car,`o FOUNDATION WALL AS TO THE SUITABILITY OF THE BEARING MATERIAL.
W
z 3. CENTER CONTINUOUS FOOTING UNDER WALLS AND COLUMN
y s Do WL TO MATCH WALL VERT FOOTINGS UNDER COLUMNS,UNO.
'u o;ti REINF,ALTERNATE HOOK 4. BEARING ELEVATIONS ARE SUBJECT TO ADJUSTMENT AS
'_- ¢ DIRECTION IN FOOTING REQUIRED BY SUITABILITY OF BEARING MATERIAL.
Q01 T/FTG `� 5. DOWELS TO MATCH VERTICAL WALL AND PILASTER
Pg T/FTG REINFORCING,UNO.EXTEND DOWELS 24'MIN ABOVE
z m.- =T/(E)FTG FOOTING,UNO.
=o �i Eill
FOOTING 6. RE GENERAL NOTES FOR ADDITIONAL INFORMATION.
"'h? REINF FTC W/(3)/5
In
EW,BOTT
�'- oBREINF on
(2)/5 LONG,
o EQ EQ 3'CLR
��� 1.-, i.,1 1,-6' AI'
W z SQUARE
rWd
o y TYPICAL COLUMN FOOTING TYPICAL WALL FOOTING
,-,-3 c FOOTING NOTES: PROJECT NO:
e W o Fill out
�—''_' 1. FOOTINGS SHALL BEAR ON PROOF ROLLED NATIVE SOIL OR COMPACTED FILL.
W 2. ALL BEARING MATERIAL SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT.
c>S? THE GEOTECHNICAL ENGINEER SHALL BE THE SOLE JUDGE AS TO THE SUITABILITY OF THE BEARING MATERIAL.
z 3 3. FOOTINGS DESIGNED FOR ALLOWABLE BEARING PRESSURE OF 2.0 KSF.
vs 4. CENTER CONTINUOUS FOOTING UNDER WALLS AND CENTER COLUMN FOOTINGS UNDER COLUMNS,UNO. SHEET TITLE
o,L 0 5. BEARING ELEVATIONS ARE SUBJECT TO ADJUSTMENT AS REQUIRED BY SUITABILITY OF BEARING MATERIAL.
64-] 7. RE:w6. COLUMN SCHEDULE TO MATCH TAND WALL DETAILS FOR FOOTING DOWELS.ICAL WALL AND PILASTER REINF UNO END OWLS 24'MIN ABOVE FTC UNO. FOUNDATION PLAN
w= 8. RE:GENERAL NOTES FOR ADDITIONAL INFORMATION.
W
�Wy
HWy
t W c?> SCALE: As indicated
W�ZO
'i o O FOOTING DETAILS S-200
��=o NTS
U
0'` yWH_
It WOOD:
55Qo
o
®2018,KL&A,INC
d
rowland+broughton
architecture/urban design/interior design
234 a hopkins ave. 1830 blake st,ste 200
aspen,co 81611 denver,co 80202
970.544.9006 0 303.308.1373 0
970.544.3473 f 303.308.1375 f
Consultants:
pin, KL.AIn ethers
Issue:
qi c cl)
c-
1
31'-2 I/4' I _7.-5" y 31'-21/4"
.--c€i�hdc IX
(N)ROOF FRAMING ABOVE 1 EXTERIOR DOO
z 8'-11 3/4" "' 8'-11 3/4" 4
w
XI 5-40 �,� CONDENSER UNIT 5-400
a a 1 3 a x7 1 a Lm®2a'oc nE\Ess v. - Fy
fff
__� SEAT I 1 ABOVE \ M SIZE AND CONNECTION 1:11 __— _—_—_—_— — — �.1 13134x1178...LVL
2 M
:TH
Pc'
w¢ L.., „� DEMOLITION OF FINISHES S-40tl M
30t O — - rr - / / \ O
WEIGHTS&EQUIPMENT S - -- 3 —WEIGH _ ,EQUIPI - ---- 3
iz
w co., SIMPSON HUC HANGERS
imo j `°+ S-4 PERMANENT CUSTOM I13/ex71 44LVLO1r0C
o>y AT LVL-TO-LVL CONNECTION __ / COL FROM ABOVE;EXTENDS TO / / 1 \ d F:OA.,
_ FABRICATED EGRESS FNDN BELOW;PROVIDE NAILER II I I aeR
? = ^ I I J LADDER AT FACE OF COLUMN FORII ODE
- 1 3 4'x7 1/4 LVLO24"OC _ - ATTACHMENT OF(E)SHEATHING,
4,c z ,x / f (3 1 3/a x7_1/a"LVL _
III 11 EXTEND(E)CMU WALL BOTH DIRECTIONS --- --— ---ti
WOW N (E)ROOF FRAMING "'�I F- TO U/S(N)ROOF SHEATHING; ` -I N
mow ^ SIZE AND ADHESIVE DOWEL MECHANICAL v IV' °
o 3 rn Il ryI, �, .o CONNECTION INTO(E)SHALL CHASE �I 6Off' OP m
w \ BE DETERMINED UPON (E)FLOOR FRAMING - M1x
W c I-.-1 DEMOLITION '„ I Lh�
- i a- -- (4)1 3/4"x7 1/4"LVL 1 11 f � W8x24 ^
s=omo ��
:142 -- TV 0 00 al --® TV \
�3a� -- III' 'I Iry / / ° � ar ��A�����\
,/,..,,//:
Leg
ll
UO / 134x714"LVL®24"O y ,.m `�� \‘\
=�= I I I / u Izo O \ =0PD.C/llFlllll
�� 0
I
HI
�-
- C
j�o - % �'/r389 6 zI-H
od 1 2'-6" I 2'-10"/ I / 8'-81/4" 8'-101/4" SN4 4 t 05/14/2019
SZ 1Il1ONAL AW DOOR
FNFATH DOOR
RFNFATH \ �� p.Ed ICI
,AIRS STAIRS
m��
>2'W
m�`2 ROOF FRAMING PLAN UPPER LEVEL FRAMING PLAN
2
1/4"=1'-0" 1/4"=1'-0"
111
=m VILLAGER 2
0 0 ROOF PLAN NOTES: LIPPFR LEVEL/IOW ROOF PLAN NOTES:
1;!', 1. TYPICAL ROOF IS FINISHES AND INSULATION OVER 3/4'
OSB/PLYWOOD ROOF SHEATHING OVER WOOD JOISTS. I, TYPICAL FLOOR IS ARCHITECTURAL FINISHES OVER 3/4"
T&G OSB/PLYWOOD FLOOR SHEATHING OVER WOOD I-
ATTACH ROOF SHEATHING WITH 8dO6"OC AT EDGES AND JOISTS.TYPICAL FLOOR SHEATHING ATTACHMENT IS GLUE
w w 011'OC IN FIELD,UNO. AND NAIL WITH 8d06"0C AT EDGES AND 012"0C IN FIELD,
a " 2. RE:TYPICAL WOOD HEADER TABLE"FOR HEADER SIZING WO.
z z AND NUMBER OF TRIMMER STUDS WHERE INDICATED 2. TYPICAL(N)EXTERIOR WALL IS 1/2"OSB/PLYWOOD WALL
N o z HDR"ON PLAN. SHEATHING ON 2x6 DFL STUDO16"OC,UNO.ATTACH WALL
5 g S 3. WHEN NOT SPECIFIED AS NOV,MINIMUM NUMBER OF SHEATHING WITH 8d®6'OC AT EDGES AND 012"0C IN
o m KING STUDS EACH SIDE OF OPENING IS EQUAL TO HALF FIELD.
J H w THE NUMBER OF STUDS INTERRUPTED BY HEADER PLUS 3. TYPICAL INTERIOR STRUCTURAL WALL IS 2x6 DFLSTUDO
y ONE,(2)MIN.RE:TYPICAL WOOD HEADER TABLE"FOR 16"0C,UNO.
Lg m 5 ATTACHMENT OF HEADER TO KING STUDS. 4. TYPICAL COLUMN IS(3)2x6 DFL STUD,UNO.
�'� 4. COORDINATE JOIST LAYOUT WITH LIGHTING LOCATIONS, 5. RE:TYPICAL WOOD HEADER TABLE'FOR HEADER SIZING
Q 5 c RE:ARCH. AND NUMBER OF TRIMMER STUDS WHERE INDICATED NOR"
5. RE:SHEETS S101-S102 FOR GENERAL NOTES AND ON PLAN,
z 9?.. LEGENDS. 6. WHEN NOT SPECIFIED AS'HDR",MINIMUM NUMBER OF
o z y 6. RE:SHEETS S103-S104 FOR TYPICAL DETAILS. KING STUDS EACH SIDE OF OPENING IS EQUAL TO HALF
y a z THE NUMBER OF STUDS INTERRUPTED BY HEADER PLUS
z W-- ONE,(2)MIN.RE:TYPICAL WOOD HEADER TABLE"FOR
o>o ATTACHMENT OF HEADER TO KING STUDS.
7. RE:ARCH FOR WINDOW AND DOOR LOCATIONS.
c s ra 8. COORDINATE JOIST LAYOUT WITH LIGHTING LOCATIONS,RE:
i W ARCH.
W O 9. RE:SHEETS S101-S102 FOR GENERAL NOTES AND
LEGENDS.
o 0 10. RE:SHEETS S103-S104 FOR TYPICAL DETAILS.
�'Oy
so
D,a PROJECT NO:
e W Fill out
U�
C
W
Z8,
o z c SHEET TITLE:
y0 j
iW-i FRAMING PLANS
g'
UW
,Wy
yWy
W o
§ ?? SCALE: As indicated
Mil Wwoz S �//\/l 0 1
5Q ���Q
W
®® Uo
n L.L.
§o ��QO
62018,KL&A,INC
d