Loading...
HomeMy WebLinkAboutFile Documents.1411 Crystal Lake Rd.0062.2018 (29).ARBK 207 S IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM City of Aspen Version 1 1.3 Updated December 13, 2017 PROJECT ADDRESS: 1411 Crystal Lake Road Parcel ID#: 2737-181-00-018 Permit Number: 0062.2018.ARBK CONTACT INFORMATION : Owner: Name: Valley Group LLC City: Brentwood Address: 3001 Hillsboro Road State: TN Email: psmallwood@smallwoodnickle.com Zip Code: 37027 Phone_ Cell Phone: Owner's Representative: Name: Luis Menendez City: Aspen Address: 715 W.Main Street,Suite 104 State: CO Email: LAM@MenendezArchitects.com Zip Code: 81611 Phone: 970-544-4851 Cell Phone: 970-948-8347 A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt,pool,spa, and solar/GSHP information_ M001,M101,A101 Do you have snowmelt or a spa that has been exempted by the buiding official? O Yes(enter sqft below on the exempt row) Q No Hydro Snowmelt Electric Snowmelt Pool Spa Existing 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft To be Demoed 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(non-exempt) 866.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(exempt) 0.00 sqft 0.00 sqft 64.00 sqft Total New_ 866.00 sqft 0.00 sqft 0.00 sqft 64.00 sqft Total on site 866.00 sqft 0.00 sqft 0.00 sqft 64.00 sqft Total Snowmelt on site 866.00 sqft _ Boiler Efficiency 95.0% I 100% 95.0% 75.0% Mitigation Payment $30,993.68 $ - $ - Total Payment for Mitigation: $ 30,993.68 B. ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit Use PV Worksheet Photovoltaic System $ 35,239.69 Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ - Other Approved System $ - Total Mitigation Credits: $ 35,239.69 Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 4 51 or How many square feet of SHW(solar hot water)would I need? 137.96 R-REMP Payment: $ - Amount Previously Paid on This Permit: I TOTAL R-REMP PAYMENT: $ - Refund(includes minus$750): $ - C. PREPARED BY: Date! 2/21/19 Digitally signed by Lus Print Name: Buis Menendez Luis Menendez nu-..,,,„,,,,w..,n emaLAMoMenendezArdete tzcan,19«IS Signature: Menendez Date,200221093105 Phone&EMail: Phone:970-544-4851,Email:LAM@MenendezArchitects.com REVIEWED: NT 2/21/19 RECEIVED 02/21/2019 ASPEN BUILDING DEPARTMENT PV WORKSHEET City of Aspen Version 11.3 Updated December 13, 2017 PROJECT ADDRESS: Parcel ID#: Permit Number: 0062.2018.ARBK Collector Aspect, Solar Degress from Collector Tilt, Orientation True South Degrees From Adjustment DC side capacity Inverter capacity kW Mitigation Horizontal Factor (kW) (kW) kW for credit Credit Collector Group 1 90 1 8/00% (3 2 5 9 5 9 5.13 kW Collector Group 2 87.00% 0 0.00 kW Collector Group 3 87.00%' 0 0.00 kW Collector Group 4 87.00%' 0 0.00 kW Collector Group 5 8/.00% 0 0.00 kW Collector Group 6 87.00% 0 0.00 kW Collector Group 7 87.00% 0 0.00 kW Collector Group 8 87.00%' I_l 0.00 kW Collector Group 9 87.00% I_l 0.00 kW Collector Group 10 87.00%' I_l 0.00 kW Collector Group 11 87.00%' 0 0.00 kW Collector Group 12 8/00% I_l 0.00 kW Collector Group 13 87 00% I_l 0.00 kW Collector Group 14 87 00%' I_l 0.00 kW Collector Group 15 87.00% 0 i 0.00 kW Collector Group 16 87.00%' 0 i 0.00 kW Collector Group 17 87.00%' 0 i 0.00 kW Collector Group 18 87.00%' I l 0.00 kW Collector Group 19 8/00% I l 0 00 kW Collector Group 20 8/00%' I l 0 00 kW Total: 5.13 kW $Mitigation Credit: $ 35,239.69 Instructions: 1)Determine how many collector groups you have.Groups are used to differentiate between collectors(panels) with different tilts,aspects,sizing,or inverters.If all your collectors are installed similarily,you might*�E IVE D one group. 2)Enter the aspect and tilt for each group.The solar orientation adjustment factor is automatically calcu a 3)DC side capacity is the total fabled panel output kW in a group. 0 2/21/2 019 4)Inverter capacity is the recommended input power in kW of your inverter(s). 5)You will be given credit for the lesser of the labeled panel output or the inverter. ASPEN 6)The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit. BUILDING DEPARTMENT 7)The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the$Mitigation Credit 8)The mitigation credit will be automatically entered into your RREMP or CREMP form.If your project has both RREMP and CREMP,it will automatically divide the credits up,with priority given to mitigating the CREMP payment. PREPARED BY: Date: 3/15/18 Print Name: Mike Tierneyh Signature: Phone&EMail:Phone:970-925-3659 Email:mike@aspensolar.com REVIEWED: NT Date: 2/21/19