Loading...
HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0235.2018 (18).ARBK 0235.2018.arbk_engineeringl_803 roaring fork road Civil Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf(2) oRYwE«B Page: [7] C.06 SITE LAYOUT ® Does inlet Cl capture and \ i,sia Author: pjm p y �'� 1a File Name: Civil Plan Set Change Order.805 Roaring Fork runoff? N5010.1- ai \ Road.2018.09.pdf - E5110.25 \ / As shown in the detail on sheet C.08,the drywells are proposed with grass access trays.This \ ( 03 prevents the drywells from collecting the low point in the yard,so this inlet was added to the design 'Does inlet Cl capture N5000.00 F for drainage as well as for the emergency overflow. yard runoff? E5095.3(0 � Page: [7] C.06 SITE LAYOUT N. ✓ Author: pjm Provide sizing calcs for the ' File Name: Civil Plan Set Change Order.805 Roaring Fork second drywell. Road.2018.09.pdf It is not recommended to have \ , utilities located so close to the agvN, drywells,they shall be outside the gravel perimeter of the .. r drywells at a minimum. � \ Drywell sizing calcs are shown on C.03. The location of the two drywells was determined to keep excavation out of driplines. It was coordinated with the contractor to bend the conduits away from the drywells as much as possible during backfilling to ensure the most clearance possible. RECEIVED 02/11/2019 ASPEN BUILDING DEPARTMENT