Loading...
HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0235.2018 (19).ARBK 0235-2018-ARBK_BuildingComments_1 Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf(1) Page:A0.0 PROPOSED SITE PLAN &RREMP The snowmelt totals do not File Name: Plan Set Change Order.805 Roaring Fork match between the plans,the ° Road.2018.09.pdf ° / Subject: PlanCheck REMP worksheet, or the Author: nickt mechanical plans/schedule. Revise to all match. Color: • snowmelt totals have been revised on all sheets to match Structural Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf(1) Page: 14 Insulate the spa vault per 2015 File Name: Structural Plan Set Change Order.805 Roaring ,, Fork Road.2018.09.pdf Subject: PlanCheck IECC R402.1 I This is required _ because of the heater Author: nickt - I` ° l Color: ■ spa vault has been insulated RECEIVED 02/11/2019 ASPEN BUILDING DEPARTMENT