HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0235.2018 (19).ARBK 0235-2018-ARBK_BuildingComments_1
Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf(1)
Page:A0.0 PROPOSED SITE PLAN &RREMP
The snowmelt totals do not
File Name: Plan Set Change Order.805 Roaring Fork match between the plans,the
° Road.2018.09.pdf
° / Subject: PlanCheck REMP worksheet, or the
Author: nickt mechanical plans/schedule.
Revise to all match.
Color: •
snowmelt totals have been
revised on all sheets to match
Structural Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf(1)
Page: 14 Insulate the spa vault per 2015
File Name: Structural Plan Set Change Order.805 Roaring
,, Fork Road.2018.09.pdf
Subject: PlanCheck IECC R402.1 I This is required
_
because of the heater
Author: nickt
- I` °
l Color: ■
spa vault has been insulated
RECEIVED
02/11/2019
ASPEN
BUILDING DEPARTMENT