Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0054.2019 (7).ACBK o o O cn o PLANT SCHEDULE 147. O PITKIN '�„"'' .. .„liw . • SOD COUNTY - z / • 175SF r fir- "'` I II d 3 i' MAY NIGHT SAGE BLONDE AMBITION BLUE GRAMA Z-' 8 • r O o 1 ...../....................... - ...... / II f i. \ � I '" riy ►4,, / co o- .... SOD I 4 ., -.,_-r-...„- Q N ,___:..•, ',. 6"• :.4„fo,l lr'e,.', ,.4... ' ,',,,, te,,„r.....,,,.,_,_,---_- ,,_1c—o 2= ',/ 22 4 F/::. 0 S 1 t� 0 ..........: / a 1 d r :.••.:::.•:.::::.::E::.-::::.:::_.:.::::.:.--.:-:.:-.::.--.:±:.:.•.;•:•:.•.:.•:.:.....•.:ii.•:;::•.::::•.::::.•.*:::.•.*:.:.:.*:„:....-:..-:.;::..::.::....::.•:::.:.•_:::.•.•••:.•.:::•.::.•.::.•.::.•.::.•..-.::•.:::•.:::::•.::::•.::::•.::::•.:::.:•.::.::•.::.::•.::.:::::.:::::.:::::.::::::.:::::.:::::.:::::.::::::.:::::.::::.:::::.:::::.::::.:::.:::.::.:::::.:::::...::...:.:..•::::::::.::.:-,::::,.:.:-,:.::.-::..:.::..:::.•:..:::.•:..::::,.;./,._.'<,°,.I....•:.::...::..::•....••:..•,:::..::..:.:..:::..:::..::.,:.:..:::•,:.:..:::-.:.:...-::-,:::..::::::..::-.:::..::::.:.::::::.:.:•:::i:.:i::i:..:::..i:...:::.,::..::::::.:•::::.:.:-:::::.:::::...:,::.:::.:.:•::::.::•:..:i..:i..::....::..:i....i..:i..:i..::...:-:..,:.....-:...:......................:...•:...:...•:....:...,•:...:..•:...:..•:........,:....„:....:.;,:,::„.,.....,......,......,......... r__I_ v. , •. 1.........................................:.�.......'............... SOD a a,e,. 3y.:aiF_.a. .... . , ,j. }' SALV KARL FOERESTER ROCKY MOUNTAIN COLUMBINE 'Aini ....... ...... 887 SF ..:,,,,,,,,_t) A UI ..„‘.,,,-t, .q . PITKIN COUNTY CONV' r COURTHOUSE r x r .l O / :.;*,7, i� ��c �+arr�rADDRESS: ......................... �I-"""" - "5 � ..+� 506 E. MAIN ST.STE.300 .. ...... ..... ........ t. '/ R .� ASPEN,CO 81611 / BOUT 3 ', •-, c s +r!/ ; ::::;,,,...:::,,„,t,,,,,,:i 1 �aPARCEL# MAINTENANCE BAND � '' I ' ol i4+ "" 1k' 27370734347851 / CALA SMALL GLOBE THISTLE LILY OF THE VALLEY DATE: / 2019.04.24 ISSUE: PURPOSES ONLY % EXISTING TREE,TYP. f PITKIN COUNTY FOR PLANNING / k (NOT FOR CONSTRUCTION) =t- ADMINISTRATION MAINTENANCE BAND / DRAWN BY:BA) CHECKED BY:CA � T BUILDING ,',' ,; - ECHI / '' I I, /' // BUFFALO GRASS HISTORY: / DATE ISSUE \ \ ' ` / 2019.05.08 BUILDING PERMIT r / PITKIN COUNTY / COURTHOUSE / 0/ .01,011111 • / it /kDf / ri 01 060 07/09/2014 On Dace 01 Deensure / � � /' ( / I %0 ' / / C / 4 O / • SHEET TITLE: PLANT SCHEDULE NOTE:ALL PROPOSED PLANTINGS PER GREEN CO.PLANT LIST DATE:MAY 08,2019 RE:PITKIN COUNTY COURTHOUSE QTY. ABBR. BOTANICAL NAME COMMON NAME SIZE SPACING NOTES PERENNIALS&ORNAMENTAL GRASSES ��'� LANDSCAPE 6 ECHI ECHINOPS RITRO SMALL GLOBE THISTLE #5 PER PLAN 5 CALA CALAMAGROSTIS X ACUTIFLORA KARL FOERSTER #5 PER PLAN SIGNED:BRITNI JOHNSON I ASLA PLAN 40 AQUI AQUILEGIA CAERULEA ROCKY MOUNTAIN COLUMBINE #1 12"0.C. HAVE COMPLIED WITH THE CRITERIA OF THE WATER EFFICIENT LANDSCAPING STANDARDS AND APPLIED THEM FOR THE 57 BOUT BOUTELOUA GRACILIS'BLONDE AMBITION BLONDE AMBITION BLUE GRAMA #1 12"0.C. EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLAN. 115 SALV SALVIA NEMOROSA MAY NIGHT SAGE #1 12"O.C. n 115 CONV CONVALLARIA MAJALIS LILY OF THE VALLEY F15 12"O.C. 0' L 44'' 81_ 16' 32' 1 O NORTH SCALE:,"=a'-o" RECEIVED GROUNDCOVERS&TURF GRASS 3,266 SF SOD BUCHLOE DACTYLOIDES BUFFALO GRASS 06/17/2019 ASPEN BUILDING DEPARTMENT 06 mi 66 mi 03 CO • PITKIN N 01 CJ.7 COUNTY �� O JAIL we , __ _ ___ ___ _ __ w iii �@ @ a C/J U m Zy rs3 O d :75NSEF1 ¢� Fit �1:....:, % i a , aiii r � of n,f d- _ ZONE 1 i i �a 2204 SF ��- � ZONE 3 PITKIN COUNTY i . j 110SFCOURTHOUSE ADDRESS: illi �- -/ 506 E.MAIN ST.STE.300 7 - 7 J40.,,.,,,;.i, ASPEN,CO 81611 a/, ZONE 1 �� PARCEL# 887 SF 27370734347851 / , I °,;- a /-,._a '.. ,` - ./ ' ,° _ - a • DATE: 2019.04.24 I� / ISSUE: j FOR A I PURPOSESPLNNING LY ON / \ / _ (NOT FOR CONSTRUCTION) / -� r\• ' \ DRAWN BY:BAJ CHECKED BY:CA Ne // HISTORY: 0 111 \\ -ZONE 3 DATE ISSUE 2019.05.08 BUILDING PERMIT �'� , ZONE 2 �� �� � 172 SF / , 4/".------""---....._7 01060 r ��� 07/09/2014 Od' Date of Dcensure ti COA WORKSHEET---WATER BUDGET ANALYSIS 09oFca HYDROZONE SCHEDULE PQ ° City of Aspen Water Efficient Landscaping Ordinance City of Aspen Parksssp and Recreation Dept. HYDROZONE WATER BUDGET CALCULATION Complete the hydrozone table for each hydrozone,CO 81611 .Use as many rows as necessary to provide the square footage of landscape are per hydrozone. ZONE SF WATER DEMAND IRRIGATION METHOD NOTES Lane re Pre-Submission Packet Completeness Review ZONE_I 3,266 SF VL_VERY LOW OVERHEAD EMERGENCY ACCESS AREA T„.cmxremu WATER EFFICIENT LANDSCAPE WORKSHEET--WATER BUDGET ANALYSIS 9709205582 ZONE_2 172 SF L_LOW DRIP PLANTINGS OVER 12"HT Total area of irrigated public right-of-way: 0 Sq.Ft. Note:Project Applicant must complete this worksheet as it is a required element of the Landscape&Irrigation Documentation Package. Total area of non-irrigated landscape: 1372 sq.Ft ZONE_3 487 SF L_LOW DRIP PLANTINGS OVER I2"HT Address:I506 E.Main St.Ste.300,Aspen,Colorado 81611 I Contact Info:IBritni Johnson,Stan Clawson Associates 970.925.2323 I m Hydrozone mn TOTAL 3,925 SF rax uxnu+rs CALCULATING GALLONS OF WATER NEEDED BY PLANT CATEGORY AND IRRIGATION TYPE Directions for Use Hydrozone Plant Water Use Type(s( Plant Factor Irrigation Method Irrigation Efficiency Area Plant Water Need SHEET TITLE: The specific irrigation water needs of each hydrozone in the design should be determined using the following formula and factors: (Sq.Ft.] (gal/season) DATE:MAY 08,2019 Irrigation Water Budget=[(ETo x Plant Factor]-Re]x Irrigated Area/Irrigation Efficiency 80.623 Fill in these blue sections below.Some Example L 0.40 Drip 0.90 2000 5759 HYDROZONE NOTES RE:PITKIN COUNTY COURTHOUSE columns have drop down menus to assist Zone 1 VL 0.25 Overhead 0.75 3266 136 Where: fillipZone 2 M 0.65 Drip 0.90 172 1311 you it gout The annual �-- ETo=Reference Evapotranspiration in inches/season(May-Sept) Reference Evapotranspiration calculate the site average annual water Zone 3 L 0.40 Drip 0.90 487 1402 1. IRRIGATION SYSTEM TO BE INSTALLED IN ALL ZONES AS NOTED ABOVE ��/n ^ -^ HYDROZONE Be=Effective Precipitation Jr inches/season(May-Sept.) 27.4 inches/year use.once completed you may either Zone 4 NDIV/0 2. AREA OF DISTURBANCE IS ENTIRETY OF SITE,LESS HISTORIC STRUCTURE AND INCLUDING ADJACENT Irrigated Area=Hydrozone Area in Square Feet 17.1 gallons/square foot attach this document to the submital Zone 5 NDIV/0 RIGHT OF WAYS. packet or insert it into the design set. Zone 6 NDIV/0 3. TOTAL IRRIGATED LANDSCAPED AREA:3,925 SF SIGNED:BRITNI JOHNSON ASLA PLAN Hydrozones Efficiency Effective Precipitation Zone 7 NDIV/0 4. WATER SUPPLY-CITY OF ASPEN. water Use Category Plant Factor Code 6.8 inches/year Zone 8 NDIV/0 5. REMOVING SOD AND AMENDING SOIL UNDER PROTECTED TREES REQUIRES HAND GRUBBING NO DEEPER I HAVE COMPLIED WITH THE CRITERIA OF THE WATER EFFICIENT Cool Season Turf 0.90 VH 4.2 gallons/square foot Zone 9 NDIV/0 THAN 4 INCHES(4").ANY ADDITIONAL SOIL ABOVE EXISTING GRADE LIMITED TO A MAXIMUM 3 INCHES(3"). High 0.80 H Zone 10 NDIV/0. 6. ALL IRRIGATION WORK PREFORMED UNDER PROTECTED TREES REQUIRES HAND GRUBBING NO DEEPER LANDSCAPING STANDARDS AND APPLIED THEM FOR THE Medium 0.65 M Irrigation Efficiency THAN 4 INCHES(4") EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLAN. TOTAL 3925 2899 Low 0.40 L Irrigation Method Default Efficiency 7. ALL PLANT MATERIALS SHALL RECEIVE ADEQUATE WATERING BY THE LANDSCAPE CONTRACTOR AS AVERAGE IRRIGATION WATER NEED-ALL ZONES"-In gallons/sq.ft./season 0.7 Very Low 0.25 VL Overhead 75% ^rne average must be 1000shot the Maximum applied water Badger 0f7.s gallons/sq.ft/season. REQUIRED UNTIL THE LANDSCAPE IRRIGATION SYSTEM IS FULLY OPERATIONAL AND UNTIL FINAL n Drip 90% ACCEPTANCE BY THE OWNER. 0' 2.5' 5' 10' 20 0 NORTH SCALE:1,5-0" ECEIVED 06/17/2019 ASPEN BUILDING DEPARTMENT GENERAL NOTES PLANTING NOTES COA WATER EFFICIENT LANDSCAPE STANDARD NOTES 1. ALL NOTES APPLY TO ALL DRAWINGS AND ALL TRADES. 1. CONTRACTOR IS RESPONSIBLE FOR INSPECTION OF EXISTING CONDITIONS AND PROMPTLY REPORTING ANY 5.1.1_SOIL AMENDMENT 2. IT IS THE RESPONSIBILITY OF ALL CONTRACTORS TO COORDINATE THE INSTALLATION OF THEIR WORK WITH DISCREPANCIES OR CONFLICTS WITH PLANTING AREAS TO HE OWNER, OWNER'S REPRESENTATIVE AND 1. TOPSOIL OF IRRIGATED GRASSES(INCLUDING TURF),SHRUBS,PERENNIALS,AND ANNUIALS SHALL BE A SANDY THAT TO BE INSTALLED BY ALL OTHER CONTRACTORS. LANDSCAPE ARCHITECT. LOAM TO A DEPTH OF AT LEAST 6 INCHES(6")CONTAINING AT LEAST 5 PERCENT(5%)ORGANIC MATTER BY °' 3. EACH CONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS OF THE CONTRACT DOCUMENTS FOR HIS/HER 2. CONTRACTOR IS RESPONSIBLE FOR LOCATING ANY EXISTING UTILITIES,ANY DAMAGE THAT MAY OCCUR DURING VOLUME EMPLOYEES USE ON SITE, TO ASSURE THAT ALL WORK IS PROPERLY COORDINATED,AND FOR REVIEWS BY CONSTRUCTION,AND ALL NECESSARY REPAIRS BE IN ACCORDANCE WITH NATIONAL,STATE AND LOCAL CODES. 2. TREE SOIL SHOULD HAVE A MINIMUM DEPTH OF 3 FEET(3'). BOTH TOPSOIL AND SUBSOIL LAYERS SHALL BE 11 MUNICIPALITY OFFICIALS FOR INSPECTIONS. 3. LANDSCAPE PLANTING BEDS AND/OR MULCHED AREAS TO BE FINE GRADED,HAND RAKED SMOOTH,AND FREE SANDY LOA,.THE TOP SOIL SHALL BE AT LEAST 6 INCHES(6")AND HAVE 5 PERCENT(5%)ORGANIC MATTER BY H ,0 4. ALL CONTRACTORS AND TRADES ARE RESPONSIBLE FOR OBTAINING ANY AND ALL NECESSARY PERMITS AND OF DEBRIS. WEIGHT AND SUBSOIL SHALL HAVE AT LEAST ONE TO THREE PERCENT(1-3%)ORGANIC MATTER BY WEIGHT. z a INSPECTIONS PRIOR TO CONSTRUCTION AS REQUIRED BY LOCAL PLANNING,ZONING,BUILDING CODE OR ANY 4. CONTRACTOR TO PERFORM SOIL TESTS AS NECESSARY TO ASSURE PLANT HEALTH AND GROWTH. 3. A MINIMUM OF FOUR (4) CUBIC YARDS 0 FORGANIC MATTER SOIL AMENDMENT PER ONE-THOUSAND (1000) -o OTHER APPLICABLE AUTHORITY. 5. ALL PLANTING BEDS TO BE MULCHED UNLESS OTHERWISE SPECIFIED. SQUARE FEET OF LANDSCAPED AREA SHALL BE REQUIRED AS NECESSARY TO MEET THE 5 PERCENT (5%) up d 5. STAN CLAUSON ASSOCIATES INC.,THE OWNER AND/OR THE OWNER'S REPRESENTATIVE SHALL BE NOTIFIED OF 6. CONTRACTOR SHALL VERIFY THAT ALL PROPOSED PLANT MATERIAL IS DETERMINED AVAILABLE AS SPECIFIED ORGANIC MATTER SPECIFICATION. i- o ANY SITE CONDITIONS WHICH MAY NECESSITATE MODIFICATION TO THE PLAN. THE OWNER OR OWNER'S AT TIME BID/PROPOSAL IS SUBMITTED. 4. SOIL AMENDMENT ORGANIC MATTER SHALL CONSIST OF EITHE CLASS I AND CLASS II COMPOST. ¢o, REPRESENTATIVE SHALL MAKE INFIELD MODIFICATIONS AS NECESSARY. 7. PLANT SCHEDULE IS FOR ESTIMATING PURPOSES ONLY. CONTRACTOR SHALL CONFIRM QUANTITY TAKEOFFS -` .7.0-= o'_ 6. CONTRACTOR SHALL PROVIDE ALL MATERIALS,EQUIPMENT,AND LABOR NECESSARY FOR ALL CONSTRUCTION, AND PROMPTLY REPORT ANY DISCREPANCIES WHICH MAY AFFECT BIDDING TO THE LANDSCAPE ARCHITECT AND 5.1.2 SOIL PREP ` PROTECTION,MAINTENANCE AND RELATED ITEMS TO COMPLETE WORK INDICATED ON THE DRAWINGS. OWNER OR OWNER'S REPRESENTATIVE. cn a s` °- 7. BEFORE COMMENCING ANY WORK CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES, 8. GALLON SIZES ARE FOR PRICING PURPOSES ONLY. PLANT MATERIAL MUST MEET OR EXCEED HEIGHTS AND 1. AMENDMENT SHALL BE TILLED TO A MINIMUM DEPTH OF 6 INCHES(6"). cn . t B SUB-SURFACE DRAINAGE,AND UNDERGROUND CONSTRUCTION SO THAT PROPER PRECAUTIONS MAY BE TAKEN WIDTHS SPECIFIED WITHIN THE PLANT SCHEDULE. 2. SITE SHALL BE GRADED TO WITHIN TWO TENTHS OF A FOOT(2/10TH)OF THE GRADING PLAN. ¢' d A NOT TO DISTURB. 9. BALLED AND BURLAPPED AND CONTAINER GROWN MAY BE FREELY SUBSTITUTED WITH OTHER SPECIFICATIONS 3. SITE SHALL BE FREE OF ROCKS AND DEBRIS OVER ONE INCH(1")DIAMETER IN SIZE.ROCKS AND DEBRIS 0.5 INCH Z-'• a 3 8. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS IN BRINGING EQUIPMENT ON TO AND OFF OF THE REMAINING UNCHANGED. (0.5")TO ONE INCH(1")SHALL NOT EXCEED 5 PERCENT(5%)BY VOLUME.AND GRAVEL 0.6 INCH(0.6")TO 1.25 ON SITE. PROTECTING ALL EXISTING HARDSCAPE AND ANY OTHER EXISTING CONSTRUCTION ON THE SITE. 10.INSTALL ALL PLANTING PER THE PLANTING DETAILS.PLANTING MATERIAL SHALL BE INSPECTED ON SITE BY THE INCHES(1.25")SHALL NOT EXCEED 5 PERCENT(5%)BY VOLUME.PARTICLES SUCH AS CONCRETE,BRICK,GLASS, 4r°', CONTRACTOR SHALL MAKE CONTACT WITH PROPER AUTHORITIES BEFORE AND DURING THIS WORK SO AS TO LANDSCAPE ARCHITECT AND ANY UNACCEPTABLE STOCK SHALL BE IMMEDIATELY REMOVED AND REPLACED AT METAL, WOOD OR PLASTIC GREATER THAN ONE INCH (1")SHALL NOT BE ALLOWED. THE TOTAL VOLUME OF ¢R v m COMPLY WITH ALL REGULATIONS AND ORDINANCES. THE CONTRACTOR'S EXPENSE. THESE MATERIALS SMALLER THAN ONE INCH(1")SHALL NOT EXCEED 5 PERCENT(5%). U 1.' `m 9. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE 11.ACTUAL PLANT LOCATIONS TO BE ADJUSTED IN THE FIELD UNDER THE SUPERVISION OF THE LANDSCAPE 4. SITE SHALL BE FREE OF DIRT CLODS OVER THREE-QUARTER INCH (3/4") DIAMETER IN SIZE. DRYLAND SEED Z ' FOR ANY AND ALL DAMAGE CAUSED DURING CONSTRUCTION AND SHALL MAKE REPAIRS AT THEIR OWN ARCHITECT.PLANTS SHALL BE LOCATED AWAY FROM SPRINKLER HEADS,DRAINS,UTILITY VAULTS&ANY OTHER AREAS MAY CONTAIN DIRT CLODS UP TO TWO INCH(2")DIAMETER IN SIZE. . z. a EXPENSE.ANY NECESSARY REPAIRS TO EXISTING UTILITIES SHALL BE IN ACCORDANCE WITH NATIONAL,STATE OBSTRUCTIONS. i-= w o AND LOCAL CODES. 12.ANY LAWN AREAS THAT DO NOT SHOW SATISFACTORY GROWTH WITHIN 21 DAYS AFTER PLANTING SHALL BE 5. STRIPPING AND STOCKPILING OF INDIGENOUS SOIL (TOPSOIL) SHALL BE REQUIRED DURING CONSTRUCTION m 10.CONTRACTOR SHALL VERIFY ALL EXISTING TREE CONDITIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. RE-PLANTED AND RE-FERTILIZED UNTIL A SATISFACTORY LAWN IS ESTABLISHED. THE LAWN SHALL BE (EXCEPT AS WAIVED BY THE CITY OF ASPEN). THE REPLACEMENT OF THIS SOIL, PLUS ADDITIONAL SOIL II,..CONTRACTOR SHALL NOTIFY THE OWNER OR OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO CONSIDERED ESTABLISHED WHEN IT IS REASONABLY FREE FROM WEED GROWTH,GREEN IN APPEARANCE AND AMENDMENTS ARE CRITICAL TO SUCCESSFUL PLANT MATERIAL ESTABLISHMENT, ONGOING HEALTH AND THEIR REMOVAL. THE SPECIFIED GRASS IS VIGOROUS AND AND GROWING WELL ON EACH SQ.FT.OF LAWN AREA. EFFICIENT USE OF WATER THROUGH THE LIFE OF THE PROJECT. �j 11.CONTRACTOR SHALL INSTALL AND MAINTAIN TREE PROTECTION FENCE THROUGHOUT CONSTRUCTION.TREE 13.CONTRACTOR SHALL PROVIDE AUTOMATIC IRRIGATION SYSTEM AS REQUIRED,COMPLETE AND INSTALLED.100% 6. THE SOIL SHALL HAVE NO HERBICIDES,HEAVY METALS,BIOLIGICAL TOXINS OR HYDROCARBONS THAT IMPACT N. r iq / PROTECTION FENCE SHALL BE LOCATED AROUND THE DRIP LINE OF ALL TREES AND NATURAL AREAS TO COVERAGE SHALL BE PROVIDED FOR ALL NEW PLANTINGS. PLANT GROWTH OR EXCEED THE EPA'S STANDARDS FOR SOIL CONTAMINANTS. REMAIN. 14.CONTRACTOR SHALL SUBMIT IRRIGATION PLAN FOR APPROVAL BY LANDSCAPE ARCHITECT AND OWNER OR IP 12.CONTRACTOR SHALL STAKE ALL WORK TO BE CONSTRUCTED AND OBTAIN APPROVAL FROM THE OWNER OR OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. 5.3.1_ORGANIC MULCH PITKIN COUNTY OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION.ANY DISCREPANCIES SHALL BE RESOLVED WITH THE 15.CONTRACTOR SHALL GUARANTEE AND REPLACE AS NECESSARY ALL PLANT MATERIAL FOR ONE YEAR FROM 1. SHALL BE APPLIED AT ONE(1)CUBIC YARD PER EIGHTY(80)SQUARE FEET AT A DEPTH OF FOUR(4")INCHES,AND OWNER OR OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. DATE OF INSTALLATION. AS APPROPRIATE TO EACH SPECIES. COURTHOUSE 13.ALL CONSTRUCTION FOR ALL TRADES SHALL CONFORM TO OR EXCEED THE PRODUCT MANUFACTURER'S 16.FINAL APPROVAL &ACCEPTANCE WILL BE GIVEN IN WRITING BY THE LANDSCAPE ARCHITECT FOLLOWING A RECOMMENDATIONS,REGULATIONS OF THE COUNTY AND THE AMERICANS WITH DISABILITIES ACT,AS WELL AS FINAL ACCEPTANCE INSPECTION. THE LANDSCAPE ARCHITECT RESERVES THE OPTION TO EXTEND THE 2. SHALL BE APPLIED TO THE SOILS SURFACE, NOT AGAINST THE PLANT STEM OR HIGH AGAINST THE BASE OF ADDRESS: ANY OTHER APPLICABLE NATIONAL,STATE,AND/OR LOCAL CODES AND ANY OTHER GOVERNING AUTHORITIES. MAINTENANCE IF HE DETERMINES THAT IS REQUIRED BY CONTRACT. TRUNKS TO MINIMIZE DISEASE. 506 E.MAIN ST.STE.300 14.CONTRACTOR ACCESS FOR CONSTRUCTION SHALL BE AS DIRECTED BY THE OWNER OR OWNER'S 3. ORGANIC MULCH MATERIAL SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND NOT INCLUDE LARGE WOOD ASPEN,CO 81611 REPRESENTATIVE. CHIPS OR CONSTRUCTION DEBRIS SUCH AS PALLETS 15.CONTRACTOR SHALL PROTECT THE GENERAL PUBLIC FROM CONSTRUCTION AREAS THROUGHOUT PARCEL# CONSTRUCTION. 5.3.1 INORGANIC MULCH 27370734347851 16.ANY DEVIATION FROM THESE PLANS MUST BE SPECIFICALLY APPROVED BY THE LANDSCAPE ARCHITECT AND 1. INORGANIC MULCH INCLUDING ROCK,GRAVEL,OR PEBBLES SHALL HAVE A MINIMUM DEPTH OF TWO(2")INCHES. THE OWNER OR OWNER'S REPRESENTATIVE. DATE: 2019.04.24 ISSUE: FOR PLANNING PURPOSES ONLY (NOT FOR CONSTRUCTION) DRAWN BY:BAJ CHECKED BY:CA HISTORY: DATE ISSUE 2019.05.08 BUILDING PERMIT 01060 07/09/2014 On Date of L,censure (IT 9 OF We/ SHEET TITLE: GENERAL NOTES L_3 0 -RECEIVED 06/17/2019 ASPEN BUILDING DEPARTMENT