Loading...
HomeMy WebLinkAboutSub Permit.232 E Main St.0132.2018.ACBK 12/3/24,2:59 PM 0005-2020-RWRG—Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0005-2020-RWRG Number 0005-2020-RWRG Record Type Right of Way Address 232 E MAIN ST Owner Lorena Vargas Original Number 20-0701 Status Cancelled Type Right of Way Reason for Cancel or Comp!. work not completed under this permit Review Fail Subtype ROW Regular Staff Notes Applicant CAROLYN DEVAN Aspen Internal? No Account STUTSMAN-GERBAZ INC Required Bond Amount $30,000 Project Blanket Bond 0010-2020-BOND Permit Contractor Bluebeam Project Id 040-890-781 Valid Business License on Account Is This Associated wla Building Yes Permit? Imported Master Building Permit 0132.2018.ACBK Required Submissions HPC-ZON-EH-UTIL Review Documents Resubmitted Eng Review Approved Covid-19 Plan Parks-Prkng-San Review Conditional Inspections Conditional Final Insp Action Items Hold All Reviews Create Fees Hold Reason Create Fees 2 .7 ROW Flat Fee Formula Price Book 2020 Conditional Flat Fee Formula Discount All Fees(%) Conditional Tiered Fee Formula Fee Discount Reason Conditional Tiered SqFt Fee Formula ROW Dates Proposed Start Date of Work 5/5/2020 ROW on Seasonal Hold 7 Proposed End Date of Work 10/30/2020 Seasonal Hold Override Seasonal Hold Date 10/31/2024 Seasonal Hold Release Date 4/1/2025 Permit Dates New Application Date 3/27/2020 Due Date 4/4/2020 Application Complete Date 3/30/2020 Final Acceptance Date Application Accepted Date 3/30/2020 Last Activity Date 12/22/2022 Issue Date 4/17/2020 Expiration Date Days to Issue 18 Milestone Current Days in 0 Applicant Hand Probationary Acceptance Date 10/11/2022 Milestone Current Days in City 925 Hands Close/CO Issuance Date 12/22/2022 Additional Information Description Demolition,abandon water line,and service electric and communication line.Locate sewer and gas line and service. Curb and Gutter installation.Sidewalk installation. Permit Comments Engineering: **Fall ROW Season dates to finish spring work(9/21-10/30/2020)which could not be finished due to COVID shutdown** Work cannot start until Pitkin County Health shut down order is lifted.Notify the city a week prior to start of work. 1.Must maintain alternate one-way traffic at all times,fully open at night.No closures of road allowed. 2.Follow backfill and testing(subgrade and asphalt)standards per CoA. 3.Contractor to call CoA Engineering to determine limits of asphalt T-Top patches. 4.Call CoA Engineering—Jack Dannenberg for inspections. 5.Contractor to coordinate abandonment and new tap with Water Department. 6.Stormwater protections and Traffic Control Setup prior to starting work. 7.Notify uphill neighbors of alternate one-way and schedule for work prior to work. Job Location&Zoning Address 232 E MAIN ST 101,ASPEN:273707320008 Lot R Site Address Display on Map Zone District MU https://cityofaspen.my.Salesforce.com/a033s00000mVi78AAC/p 1/5 12/3/24,2:59 PM 0005-2020-RWRG—Salesforce-Enterprise Edition Historic Property? No Legal Description Subdivision:CITY AND TOWNSITE OF ASPEN Block:73 Lot: RAND:-Lot:S CONOCO Historic District? Yes Eden Address ROW Details Valuation $30,000.00 ROW Scope Alleyways Work Affects Tree/Drip Line? No Explain Other Impacts City Trails/Parks? No ROW Impact Category Adjacent to City Open Space? No Lot Size Sq.Ft. Located Within City Mall No Soil Disturbance Sq Ft Boundaries? Disturbs>200 Sq Ft? Affected Area Sq Ft 0 Is Work on Private Property? Emergency or Earth Retention Details(If Applicable) Nature of Emergency Work Work Completed? Earth Retention-Cubic Feet Financials Total Fees $401.70 Total Payments $401.70 Total Balance $0.00 System Information Created By CAROLYN DEVAN,3/25/2020 3:25 PM Last Modified By Aspen Avocette,9/28/2024 1:52 AM Number 0005-2020-RWRG VIP Form Tool VIP VIP ({"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAs"), Foreign Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAs"}, Language Status {"parentCategoryld":"a2E6A000000UwvKUAs","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwvc {"parentCategoryld":nul I,"isSubmit":n u II,"isCurrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {"parentCategoryld":nul I,"isSubmit":n u II,"isCurrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"}, {"parentCategoryld":nul I,"isSubmit":true,"isCurrent":nu II,"categoryStatusLabels":nu II,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] VIP 3/27/2020 VIP Permit Application Submitted 11:45 AM Form Template Action Items View/Print Permit Link Attachment Activity History Email:Approval for ROW permit#0005-2020-RWRG Type Billable Assigned To Lorena Vargas Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/24/2020 Days in Applicant's Hands To:carolyn.d@sgearthmoving.co CC:raquel.flinker@cityofaspen.com BCC: Attachment:ROW_20200424.pdf Subject:Approval for ROW permit#0005-2020-RWRG Body: Attached is your approved ROW permit copy. Please see approval notes on your permit and be mindful of the Construction&Excavation Standards for Work in the Public Right of Way. ROW Permits are required when a project involves excavation or performing other work in the public right of way.See Chapter 7 of the Engineering Standards(PDF) Comments for more information at this link:https://www.cityofaspen.com/DocumentCenter/View/505/Engineering-Standards-PDF?bidld= Please print the approved ROW permit copy as well as the supporting documents and have it onsite. Thank you, Lorena Vargas City of Aspen-Engineering 201 N Mill St Ste 203 Aspen,CO 81611 T:(970)920-5080 Email:Approval for ROW permit#0005-2020-RWRG Type Billable Assigned To Lorena Vargas https://cityofaspen.my.salesforce.com/a033s00000mVi78AAC/p 2/5 12/3/24,2:59 PM 0005-2020-RWRG—Salesforce-Enterprise Edition Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/24/2020 Days in Applicant's Hands To:carolyn.d@sgearthmoving.co CC:raquel.flinker@cityofaspen.com BCC: Attachment:--none-- Subject:Approval for ROW permit#0005-2020-RWRG Body: Attached is your approved ROW permit copy. Please see approval notes on your permit and be mindful of the Construction&Excavation Standards for Work in the Public Right of Way. ROW Permits are required when a project involves excavation or performing other work in the public right of way.See Chapter 7 of the Engineering Standards(PDF) Comments for more information at this link:https://www.cityofaspen.com/DocumentCenter/View/505/Engineering-Standards-PDF?bidld= Please print the approved ROW permit copy as well as the supporting documents and have it onsite. Thank you, Lorena Vargas City of Aspen-Engineering 201 N Mill St Ste 203 Aspen,CO 81611 T:(970)920-5080 Email:Permit Fees Due Type Billable Assigned To Laura Flores Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/27/2020 Days in Applicant's Hands To:carolyn.d@sgearthmoving.co CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit or land use application 20-0701 at 232 W MAIN ST.Please be aware that credit card transaction fees will apply. To pay by check,please drop off checks at the Information Office on the first floor of City Hall.Checks should be in an envelope printed with your name,phone number,permit/case number,and address associated with the permit/case.Or you can mail checks to: Community Development Department C/O Comments 130 S.Galena Street,Third floor Aspen,CO 81611 Current Amount Due:$401.70 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) If you have already paid your fees,please disregard this message. Thank you! City of Aspen Permit Review Type Engineering Billable Assigned To Raquel Flinker Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/3/2020 Days in Applicant's Hands Comments Bonds/Deposits x Record Type Non-Cash Bond Agreement Type Letter of Credit Required Amount $100,000.00 Paid Amount $100,000.00 Used Amount $30,000.00 Available Amount $70,000.00 Expiration Date 12/22/2024 https://cityofaspen.my.salesforce.com/a033s00000mVi78AAC/p 3/5 12/3/24,2:59 PM 0005-2020-RWRG—Salesforce-Enterprise Edition Contacts CAROLYN DEVAN Account STUTSMAN-GERBAZ INC Type Applicant Active Contractor License Count 0.00 Number 0026050 Account Type Asphalt Provider Active Contractor License Count 0.00 Number 0026051 Account Type Excavator Active Contractor License Count 0.00 Number 0026052 Account Type Owner Active Contractor License Count 0.00 Number 0026053 Fees 0048128 Type Right of Way Permit Fee Total $401.70 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full V. Fee Paid Date/Time Files Update Maintenance bond FALL ROW 2020 Last Modified 12/22/2022 2:19 PM Last Modified 9/29/2020 3:41 PM Created By Scott Wenning Created By CAROLYN DEVAN CCO20-CENTAUR CONSTRUCTION-232 E MAIN STREET-HWY 82-AL ROW_20200424.pdf Last Modified 9/29/2020 3:41 PM Last Modified 4/24/2020 9:47 AM Created By CAROLYN DEVAN Created By Lorena Vargas ROW_20200420.pdf ROW_20200417.pdf Last Modified 4/20/2020 12:31 PM Last Modified 4/17/2020 12:11 PM Created By Lorena Vargas Created By Lorena Vargas Permit Application 2020-03-27 17:45:48.pdf Last Modified 3/27/2020 11:45 AM Created By CAROLYN DEVAN Inspections INS-0006323-20 Status Pending Type Engineering ROW/Encr/Gr Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE Milestones Review Round 1-0005-2020-RWRG Status Open Due Date Created Date 3/30/2020 Payments PY-005697 Related To 0005-2020-RWRG Amount $401.70 Created Date 3/27/2020 Payment Source R-0005400 Receipt-Amount Remaining R-0005400:$0 Reviews REV-012210 Milestone Review Round 1-0005-2020-RWRG https://cityofaspen.my.salesforce.com/a033s00000mVi78AAC/p 4/5 12/3/24,2:59 PM 0005-2020-RWRG—Salesforce-Enterprise Edition Status Approved with Conditions Type Engineering ROW/Encr/Gr Due Date Completed Date 4/3/2020 8:58 AM Owner Alias JDann On Hold Created Date 3/30/2020 REV-012211 Milestone Review Round 1-0005-2020-RWRG Status Approved Type Parking Due Date Completed Date 3/30/2020 4:33 PM Owner Alias Parking-Review On Hold Created Date 3/30/2020 Submissions Maintenance Bond or Equivalent Actions Submission Date 3/26/2020 2:30 PM Status Pending Required V. Description Traffic Control Plan Actions Submission Date 3/27/2020 7:14 AM Status Pending Required ✓ Description Site Plan Actions Submission Date 3/25/2020 3:35 PM Status Pending Required ✓ Description STUTSMAN GERBAZ 232 E.MAIN ST Revised Part 2.pdf Actions Submission Date 4/16/2020 10:03 AM Status Required Description Copyright©2000-2024 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000mVi78AAC/p 5/5