Loading...
HomeMy WebLinkAboutFile Documents.210 S West End St.0020-2020-BCHO (3) 0020-2020-BCHO_BuildingCommentl 210 S West End Architectural CO 1.pdf(6) Subject: PlanCheck Page:A-106 FIRE PLAN ELEVATIONS These openings are no longer Author:justinh required to be protected now Color: • that the entire building is being File Name: 210 S West End Architectural CO 1.pdf sprinklered. Q o 0 I T o � The note has been removed from Subject: PlanCheck Page:A-401 STAIR DETAILS This is a type I handrail and the TYPE HAN BDRAIIL PER Author:justinh IBC reference would be IRC ... Color: • 1014.3.1, revise note. File Name: 210 S West End Architectural CO 1.pdf STEEL FRAME VThe note on A-401 has been changed. This is a type I handrail and the IBC reference would be 1014.3.1, woo°TREAD- revise note. WRAP STEEL STRUCTURE AS NECESSARY Subject: PlanCheck Revise note to state type I Page:A-401 STAIR DETAILS Revise note to state handrail,type II handrails type l handrail,type II Author:justinh handrails exceed a exceed a perimeter of 6.25"and Perimeter of 6.25"and Color: • have finger recesses have finger recesses. / File Name: 210 S West End Architectural CO 1.pdf "' ''—'41 The note on A-401 has been changed. T.7.2. NDRAIL Ne (fir 36'ABOVE NOSING II GUARDRAIL /\ _il / c ,r - L ' ,;;-i..■ Subject: PlanCheck i• 'i'l Imo` °! Page:A-402 BACK STAIR DETAILS The handrail extension is 11 required to extend to the bottom W _- I - Author:justinh q ' v riser,this is shown as stopping Ill Wit �' � o-O ,.I Color: • just short of that. Revise to ��� File Name: 210 S West End Architectural CO 1.pdf comply. E - a- V/ The handrail has been changed on A-402 Subject: PlanCheck Page:A-403 FIREPLACE DETAILS Provide an updated fireplace Author:justinh registration form. Color: • File Name: 210 S West End Architectural CO 1.pdf v The registration form has been updated and cutsheet provided for master bedroom fireplace RECEIVED 06/30/2020 ASPEN BUILDING DEPARTMENT 1__=i Subject: PlanCheck _ ti Page:A-403 FIREPLACE DETAILS Is this existing fireplace a site o1 Author:justinh built masonry fireplace or is it a Color: • factory build unit? A masonry File Name: 210 S West End Architectural CO 1.pdf fireplace is required to be completely supported by non-combustible materials, [ This fireplace is existing. The scope including the hearth extension, of work has been removed from which I don't see shown in the structural plan. Please clarify °`�" what this fireplace is and show this permit and will be addressed how this alteration either in future change order. complies with IBC 2111.10 if it is a masonry fireplace or the unit's installation instructions if it is a factory built unit. 210 S West End REMP Rev..pdf(3) Subject: PlanCheck Page: 1 Fill this portion of the form out in Author:justinh excel rather than by hand and it Color: • will populate the refund cell, you File Name: 210 S West End REMP Rev..pdf will want this filled out properly in �" - 1,„,°.--- I�] order to request a refund for fees This sheet was filled out in excel paid that are now being �. n as requested. mitigated against. Subject: PlanCheck ""' Page: 2 You did not fill out any inverter Author:justinh capacity information. Provide Color: • specs on the panels and dd �ll y a;a=;rye P da File Name: 210 S West End REMP Rev..pdf inverters you are proposing and i-specs on Me panels and Inverters you are proposing and e;acluda;ntede,napanesyste produc,„awllEeal;m;gg' include inverter capacity on this "� the energy t system produces form as that will be a limiting The sheet was amended to show factor on the energy the system inverter capacity and a cutsheet is produces. attached under "solar". Subject: PlanCheck Page: 2 I get different measurements for Author:justinh the degrees from true south per �--. ' 1 Color: • the roof plan than what you ® ��� File Name: 210 S West End REMP Rev..pdf show here, please clarify how ; you are measuring your angle. . V This sheet has been amended. Provide a reference for true north on the roof plan if the north e arrow shown is not representative of that(I measure the panels on the 4/12 pitch roof as being 50 degrees from true south, and the panels on 9/12 pitch as 40 degrees from true south relative to your north arrow). RECEIVED 06/30/2020 ASPEN BUILDING DEPARTMENT