Page:A-106 FIRE PLAN ELEVATIONS These openings are no longer
Author:justinh required to be protected now
Color: • that the entire building is being
File Name: 210 S West End Architectural CO 1.pdf sprinklered.
Q o 0
I T o � The note has been removed from
Subject: PlanCheck
Page:A-401 STAIR DETAILS This is a type I handrail and the
TYPE HAN
BDRAIIL PER Author:justinh IBC reference would be
IRC ... Color: • 1014.3.1, revise note.
File Name: 210 S West End Architectural CO 1.pdf
STEEL FRAME VThe note on A-401 has been changed.
This is a type I handrail
and the IBC reference
would be 1014.3.1,
woo°TREAD- revise note.
WRAP STEEL
STRUCTURE AS
NECESSARY
Subject: PlanCheck Revise note to state type I
Page:A-401 STAIR DETAILS Revise note to state handrail,type II handrails
type l handrail,type II Author:justinh
handrails exceed a exceed a perimeter of 6.25"and
Perimeter of 6.25"and Color: •
have finger recesses have finger recesses.
/ File Name: 210 S West End Architectural CO 1.pdf
"' ''—'41 The note on A-401 has been changed.
T.7.2. NDRAIL
Ne
(fir 36'ABOVE NOSING
II GUARDRAIL /\
_il / c
,r - L ' ,;;-i..■ Subject: PlanCheck
i• 'i'l Imo` °! Page:A-402 BACK STAIR DETAILS The handrail extension is
11 required to extend to the bottom
W _- I - Author:justinh
q ' v riser,this is shown as stopping
Ill Wit �' � o-O ,.I Color: • just short of that. Revise to
��� File Name: 210 S West End Architectural CO 1.pdf comply.
E - a-
V/ The handrail has been changed on A-402
Subject: PlanCheck
Page:A-403 FIREPLACE DETAILS Provide an updated fireplace
Author:justinh registration form.
Color: •
File Name: 210 S West End Architectural CO 1.pdf
v The registration form has been updated and cutsheet
provided for master bedroom fireplace
RECEIVED
06/30/2020
ASPEN
BUILDING DEPARTMENT
1__=i Subject: PlanCheck
_ ti Page:A-403 FIREPLACE DETAILS Is this existing fireplace a site
o1 Author:justinh built masonry fireplace or is it a
Color: • factory build unit? A masonry
File Name: 210 S West End Architectural CO 1.pdf fireplace is required to be
completely supported by
non-combustible materials,
[ This fireplace is existing. The scope including the hearth extension,
of work has been removed from which I don't see shown in the
structural plan. Please clarify
°`�" what this fireplace is and show
this permit and will be addressed
how this alteration either
in future change order. complies with IBC 2111.10 if it is
a masonry fireplace or the unit's
installation instructions if it is a
factory built unit.
210 S West End REMP Rev..pdf(3)
Subject: PlanCheck
Page: 1
Fill this portion of the form out in
Author:justinh excel rather than by hand and it
Color: • will populate the refund cell, you
File Name: 210 S West End REMP Rev..pdf will want this filled out properly in
�" - 1,„,°.--- I�] order to request a refund for fees
This sheet was filled out in excel paid that are now being
�. n as requested. mitigated against.
Subject: PlanCheck
""' Page: 2 You did not fill out any inverter
Author:justinh capacity information. Provide
Color: • specs on the panels and
dd �ll y a;a=;rye P da File Name: 210 S West End REMP Rev..pdf inverters you are proposing and
i-specs on Me panels and Inverters you are proposing and
e;acluda;ntede,napanesyste produc,„awllEeal;m;gg' include inverter capacity on this
"� the energy t system produces form as that will be a limiting
The sheet was amended to show factor on the energy the system
inverter capacity and a cutsheet is produces.
attached under "solar".
Subject: PlanCheck
Page: 2 I get different measurements for
Author:justinh the degrees from true south per
�--. ' 1 Color: • the roof plan than what you
® ��� File Name: 210 S West End REMP Rev..pdf show here, please clarify how
; you are measuring your angle.
.
V This sheet has been amended. Provide a reference for true
north on the roof plan if the north
e
arrow shown is not
representative of that(I measure
the panels on the 4/12 pitch roof
as being 50 degrees from true
south, and the panels on 9/12
pitch as 40 degrees from true
south relative to your north
arrow).