HomeMy WebLinkAboutFile Documents.63 Smuggler Grove Rd.0086.2019 (7).ARBK04/18/2019
04/30/2019
04/18/2019
04/30/2019
04/18/2019
04/30/2019
04/18/2019
04/30/2019
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
04/18/2019
04/30/2019
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
EE
SA
SA CO
V
EU
HR
GR
SG
CO
separate permit req'd
SG
V
V
DE ET
04/30/2019
SEE NOTES #1 PLANS
Max 9 sf allowed
05/10/2019
tonyf
04/18/2019
SG SG
SG
HR
GR
04/30/2019
SEE NOTES #1 PLANS
F
EE req'd
SEE NOTES #1 PLANS
SG
SG
V
05/10/2019
tonyf
04/18/2019
04/30/2019
SEE NOTES #1 PLANS
F
EE req'd
V
SG SG SG
SG
SG
SG
GR
HR
Separate permit req'd
from NWCCOG
05/10/2019
tonyf
04/18/2019
04/30/2019
F
GR
GR
GR If the spa is located less than 18"
from the guardrail, then the
guardrail must be 18" higher than
the top of the spa. If the edge of the
spa is 18" or more in depth and is
within 18" of the GR, the guardrail
must be 36" higher than the top of
the spa.
05/10/2019
tonyf
04/18/2019
04/30/2019
GR
GR
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
Update plans
as necessary
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf
04/18/2019
04/30/2019
4" max opening
typical
05/10/2019
tonyf
04/18/2019
04/30/2019
05/10/2019
tonyf