Loading...
HomeMy WebLinkAboutFile Documents.533 W Hallam St.0058-2020-BCHOEngineering 1 - 533 W Hallam - 0058.2020.BCHO Page: [6] C3 Utility Plan File Name: 0285.2018.ARBK_533 W HALLAM CIVIL.pdf Provide a drainage memo that shows the WQCV is met with the added impervious area and tree removal. Per the paver detail F-10 on sheet A801 of the issued architectural plan set the pavers are not pervious. The grass buffer BMP seems to be maxed out treating other impervious area. An additional tree is proposed to be removed. This results in less tree canopy credit for runoff treatment. Update the tree credits with the removal of the tree. Please show the WQCV is met with required BMPs. 0285.2018.ARBK_533 W HALLAM CIVIL.pdf (1) Provide a drainage memo that shows the WQCV is met with the added impervious area and tree removal. Per the paver detail F-10 on sheet A801 of the issued architectural plan set the pavers are not pervious. The grass buffer BMP seems to be maxed out treating other impervious area. An additional tree is proposed to be removed. This results in less tree canopy credit for runoff treatment. Update the tree credits with the removal of the tree. Please show the WQCV is met with required BMPs.