Loading...
HomeMy WebLinkAboutFile Documents.210 E Cooper Ave.0169.2018.ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 06/15/2018 0169.2018.ARBK KH 6/15/18 X X X X 400-803-045 TF TF 7/19/18 7/19/18 CS 08/13/20180 0 0 n/a 0 L DR 6/15 750.00 2100.00 351.00 06/15/2018 0169.2018.ARBK 210 COOPER CONDO ASSOC 210 E COOPER 273513108800 DAM 8/30/18 SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15