HomeMy WebLinkAboutFile Documents.210 E Cooper Ave.0169.2018.ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
06/15/2018
0169.2018.ARBK
KH 6/15/18
X
X
X
X
400-803-045
TF
TF
7/19/18
7/19/18
CS 08/13/20180
0
0
n/a
0
L
DR 6/15
750.00
2100.00
351.00
06/15/2018
0169.2018.ARBK
210 COOPER CONDO ASSOC
210 E COOPER
273513108800
DAM 8/30/18
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15