Loading...
HomeMy WebLinkAboutFile Documents.975 Chatfield Rd.0104.2018 (3).ARBKMarkup Summary Page: 13 Capture: No File Name: 975 Chatfield Rd.2018.06 - Grading and Drainage Report_Change Order 2.pdf Provide design information for sand filter showing the design criteria from URMP has been met. 975 Chatfield Rd.2018.06 - Grading and Drainage Report_Change Order 2.pdf (5) Page: 13 Capture: No File Name: 975 Chatfield Rd.2018.06 - Grading and Drainage Report_Change Order 2.pdf Provide flow calculations showing how the discharge rate was calculated. Page: 14 Capture: No File Name: 975 Chatfield Rd.2018.06 - Grading and Drainage Report_Change Order 2.pdf This maintenance chart needs to reference Scarification of filter surface and media replacement. A recommended chart is provided on page 8-99 of the URMP. Page: 73 Capture: No File Name: 975 Chatfield Rd.2018.06 - Grading and Drainage Report_Change Order 2.pdf The project area is .387 Acres correct? why is the catchment basin .267? Page: 73 Capture: No File Name: 975 Chatfield Rd.2018.06 - Grading and Drainage Report_Change Order 2.pdf Are these calcs for the right project? The address is wrong. 9 Trench Drain 1 will be a grate adequate to provide 10 gpm/ft. 3.4.2 Trench Drain 2 Trench Drain 2 will be a grate adequate to provide 10 gpm/ft. 3.4.3 Trench Drain 3 Trench Drain 2 will be a grate adequate to provide 10 gpm/ft. 3.5 Outlet Calculations The outlet will be a 6-in stand pipe with a 5.24-in orifice set at the WQCV elevation of 7797.84. The pipe will discharge at the allowable rate of 0.594 cfs at elevation 7795. A planted scour stop pad will be lo- cated downstream of the outlet to prevent erosion. 3.6 Operation and Maintenance Operation and maintenance recommendations for the Sand Filter can be found in Table 4. These standards were acquired from Table 8.14 in the URMP, respectively. In addition, the weir outlet on the sand filter should be checked and cleared quarterly for debris buildup. Provide design information for sand filter showing the design criteria from URMP has been met. 9 3.3.5 Inlet E1 Inlet E1 will be an NDS 10” Round Structural Foam Grate, and will capture 0.048 cfs of runoff from Ba- sin PB:8. This inlet provides a 50% flow capacity of 0.074 cfs according to NDS. As a result, the inlet has adequate flow capacity. 3.4 Trench Drain Calculations Three trench drains will be installed to route runoff to the Sand Filter. Each trench drain is described be- low. 3.4.1 Trench Drain 1 Trench Drain 1 will be a grate adequate to provide 10 gpm/ft. 3.4.2 Trench Drain 2 Trench Drain 2 will be a grate adequate to provide 10 gpm/ft. 3.4.3 Trench Drain 3 Trench Drain 2 will be a grate adequate to provide 10 gpm/ft. 3.5 Outlet Calculations The outlet will be a 6-in stand pipe with a 5.24-in orifice set at the WQCV elevation of 7797.84. The pipe will discharge at the allowable rate of 0.594 cfs at elevation 7795. A planted scour stop pad will be lo- cated downstream of the outlet to prevent erosion. 3.6 Operation and Maintenance Operation and maintenance recommendations for the Sand Filter can be found in Table 4. These standards were acquired from Table 8.14 in the URMP, respectively. In addition, the weir outlet on the sand filter should be checked and cleared quarterly for debris buildup. Provide flow calculations showing how the discharge rate was calculated. Table 4. URMP Sand Filter Maintenance Recommendations This maintenance chart needs to reference Scarification of filter surface and media replacement. A recommended chart is provided on page 8-99 of the URMP. Project: Basin ID: Design Information (Input):Desig Catchment Drainage Imperviousness Ia =60.22 percent Catchm Catchment Drainage Area A =0.267 acres Catchm Predevelopment NRCS Soil Group Type =B A, B, C, or D Predev Return Period for Detention Control T =5 years (2, 5, 10, 25, 50, or 100)Return Time of Concentration of Watershed Tc =5.45 minutes Time o Allowable Unit Release Rate q =cfs/acre Allowa One-hour Precipitation P1 =0.64 inches One-ho Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Design Coefficient One C1 =88.80 Coeffic Coefficient Two C2 =10 Coeffic Coefficient Three C3 =1.052 Coeffic Determination of Average Outflow from the Basin (Calculated):Deter Runoff Coefficient C =Runoff Inflow Peak Runoff Qp-in =cfs Inflow Allowable Peak Outflow Rate Qp-out =cfs Allowa Mod. FAA Minor Storage Volume = 0 cubic feet Mod. FAA Minor Storage Volume = 0.000 acre-ft 1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfa Duration Intensity Volume Factor Outflow Volume Volume Duratio minutes inches / hr acre-feet "m"cfs acre-feet acre-feet minute (input)(output)(output)(output)(output)(output)(output)(input) 0 0.00 0.000 0.00 0 1 4.56 0.000 0.00 1 2 4.16 0.000 0.00 2 DETENTION VOLUME BY THE MOD 1300 riverside Drywell (For catchments less than 160 acres only. For larger catch (NOTE: for catchments larger than 90 acres, CUHP hydr Determination of MINOR Detention Volume Using Modified FAA MethodThe project area is .387 Acres correct? why is the catchment basin .267? Project: Basin ID: Design Information (Input):Design Information (Input): Catchment Drainage Imperviousness Ia =60.22 percent Catchment Drainage Imperviousness Ia =60.22 percent Catchment Drainage Area A =0.267 acres Catchment Drainage Area A =0.267 acres Predevelopment NRCS Soil Group Type =B A, B, C, or D Predevelopment NRCS Soil Group Type =B A, B, C, or D Return Period for Detention Control T =5 years (2, 5, 10, 25, 50, or 100)Return Period for Detention Control T =100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc =5.45 minutes Time of Concentration of Watershed Tc =5.45 minutes Allowable Unit Release Rate q =cfs/acre Allowable Unit Release Rate q =2.222 cfs/acre One-hour Precipitation P1 =0.64 inches One-hour Precipitation P1 =1.23 inches Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Coefficient One C1 =88.80 Coefficient One C1 =88.80 Coefficient Two C2 =10 Coefficient Two C2 =10 Coefficient Three C3 =1.052 Coefficient Three C3 =1.052 Determination of Average Outflow from the Basin (Calculated):Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C =Runoff Coefficient C =0.57 Inflow Peak Runoff Qp-in =cfs Inflow Peak Runoff Qp-in =0.93 cfs Allowable Peak Outflow Rate Qp-out =cfs Allowable Peak Outflow Rate Qp-out =0.594 cfsMod. FAA Minor Storage Volume = 0 cubic feet Mod. FAA Major Storage Volume = 153 cubic feet Mod. FAA Minor Storage Volume = 0.000 acre-ft Mod. FAA Major Storage Volume = 0.004 acre-ft 1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m"cfs acre-feet acre-feet minutes inches / hr acre-feet "m"cfs acre-feet acre-feet (input)(output)(output)(output)(output)(output)(output)(input)(output)(output)(output)(output)(output)(output) 0 0.00 0.000 0.00 0 0.00 0.000 0.00 0.00 0.000 0.000 1 4.56 0.000 0.00 1 8.77 0.002 1.00 0.59 0.001 0.001 2 4.16 0.000 0.00 2 8.00 0.003 1.00 0.59 0.002 0.002 3 3.83 0.000 0.00 3 7.35 0.005 1.00 0.59 0.002 0.002 4 3.54 0.000 0.00 4 6.80 0.006 1.00 0.59 0.003 0.002 5 3.29 0.000 0.00 5 6.33 0.007 1.00 0.59 0.004 0.003 6 3.08 0.000 0.00 6 5.91 0.007 0.95 0.57 0.005 0.003 DETENTION VOLUME BY THE MODIFIED FAA METHOD 1300 riverside Drywell Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Are these calcs for the right project? The address is wrong. We have added information to the report describing how the URMP requirements are met. An orifice will provide the flow control. An orifice calculation was added to the appendix and language was added to the body of the report. The plans were not updated as the orifice was already called out. Additionally, a pipe flow capacity calculation was added to the report. Lastly, the allowable out is discussed based on the existing flowrate minus PB:5.0. The correct table was added to the report. PB:5 is allowed to flow offsite undetained as there is not hardscape to treat. Yes, it is the correct project. We have updated the title. 10/12/2018 Page: [1] Bernsten-Cover Sheet C0.0 Capture: No File Name: PlanSet.975 Chatfield Rd.2018.06.Civil_Change Order 2.pdf Provide survey. PlanSet.975 Chatfield Rd.2018.06.Civil_Change Order 2.pdf (6) Page: [3] Bernsten-C200 Capture: No File Name: PlanSet.975 Chatfield Rd.2018.06.Civil_Change Order 2.pdf Provide level spreader for sand filter. Page: [3] Bernsten-C200 Capture: No File Name: PlanSet.975 Chatfield Rd.2018.06.Civil_Change Order 2.pdf Max slope is 3:1. Specify how this area will be restabilized. Page: [5] Bernsten-C400 Capture: No File Name: PlanSet.975 Chatfield Rd.2018.06.Civil_Change Order 2.pdf Show inlet structure for sand filter. Provide energy dispersion for inlet. Page: [7] Bernsten-C600 Capture: No File Name: PlanSet.975 Chatfield Rd.2018.06.Civil_Change Order 2.pdf Specify existing and proposed utility lines. NOTES: 1.ALL MATERIALS CONSTRUCTION OF P MEET OR EXCEED TH SPECIFICATIONS SET ("COA") MUNICIPAL CO AND APPLICABLESTATE AND FEDERAL IS CONFLICT BETWEE TECHNICAL MANUAL STANDARDS, THE HIG APPLY. ALL UTILITY W APPROVED BY THE U 2.THE CONTRACT THAT THE LOCATION UTILITIES AS SHOWN RECORDS OF THE VA WHERE POSSIBLE, M FIELD. THE INFORMAT AS BEING EXACT OR 3.THE CONTRACT COPY OF THE APPRO THE APPROPRIATE C SPECIFICATIONS, AN EXTENSION AGREEM ONSITE AT ALL TIMES 4.THE CONTRACT ALL ASPECTS OF SAF LIMITED TO, EXCAVAT SHORING,TRAFFIC CO 5.IF DURING THE CONDITIONS ARE EN INDICATE A SITUATIO THE PLANS OR SPEC SHALL CONTACT THE LLC IMMEDIATELY. 6.ALL REFERENC STANDARDS SHALL R OF SAID STANDARD U OTHERWISE.7.THE CONTRACT CONTROL PLAN IN AC THE APPROPRIATE R AUTHORITY (TOWN, C APPROVAL PRIOR TO WITHIN OR AFFECTIN THE CONTRACTOR S PROVIDING ANY AND AS MAY BE REQUIRE CONSTRUCTION ACT 8.THE CONTRACT PROVIDING ALL LABO FOR THE COMPLETIO IMPROVEMENTS SHO DESIGNATED TO BE P CONSTRUCTED UNLE NOTED OTHERWISE. 9.THE CONTRACT KEEPING ROADWAYS CONSTRUCTION DEB BERNSTEN RESIDENCE 975 CHATFIELD ROAD ASPEN, CO Provide survey. -25.0 78 7803 7795.00 7796.00 7 9 7 P I P E E 3 N 0 2 D E G R E E S 0 6 ' 0 0 " E 4 8 . 0 8 ' TO W : 7 8 0 4 7 7 9 5 7 RIM:7804.12 INV IN:7800.00 4" PVC INV IN:7800.00 6" PVC INV OUT:7795.28 6" PVC TO W : 7 8 0 1 . 5 Provide level spreader for sand filter. 78 1 9 . 8 0 78 2 0 . 8 0 78 2 1 . 3 0 EX:AVG: 39.5% MAX 48.5% -45.1% -38.1% -25.0% -31.9% 7806.59 7813.00 7813.00 7806.59 7806.78 7806.99 7806.50 7804.00 7803.00 1.50 7806.63 7806.62 7806.21 7806.66 7806.08 7806.21 78 0 78 0 4 78 2 0 78 1 9 78 2 1 78 1 0 78 1 5 78 2 0 7 8 2 5 782 2 782 3 782 4 78 2 6 7827 78 2 8 78 2 9 7830 78 3 1 78 3 2 78 3 3 INLET A1 RIM:7829.97 INV IN:7828.16 4" PVC INV OUT:7828.16 4" PVC PIPE A2 P I P E A 3 PIPE A4 INLET A2 RIM:7828.71 INV IN:7826.88 4" PVC INV OUT:7826.88 4" PVC PIP P I P E E 2 INLET D1 RIM:7806.29 INV OUT:7804.34 4" PVC PIPE D PIPE A9 PIP E B 1 P I P E C 1 PIPE A 8 5.1 % 783 2 7832 7831 78297829.50 7830 7830. 5 0 7831. 5 0 78 78 3 2 . 5 0 P I P E A 5 PIPE A6 PIP E A 7 P I P E E 3 PIPE A10 -38.7% -35.3 % -40.8% 7806.59 N 77 DEGREES 33'54" W 1 7 0 . 6 7 ' DECK: 7827.20 EDGE:7826.86 WALKOUT:7827.00 FFE:7837.1 FFE:7814.90 EX:7814.40 TR E N C H D R A I N N O . 1 78 0 7 . 6 5 78 0 8 . 6 5 78 0 9 . 6 5 78 1 0 . 6 5 78 1 1 . 7 1 78 1 2 . 7 1 78 1 3 . 7 1 78 1 4 . 7 1 7814.1 78 1 4 . 8 0 78 1 5 . 8 0 78 1 6 . 8 0 78 1 7 . 8 0 78 1 8 . 8 0 78 2 1 . 5 0 DE C K : 7 8 0 6 . 5 8 78 1 0 . 7 1 TOW:7807 TO W : 7 8 0 4 TO W : 7 8 1 0 782 6 . 9 TO W : 7 7 9 8 . 6 5 -19.9% 78 0 0 780 5 7810 7 8 1 5 7 8 2 0 7 8 2 5 783 0 77 9 6 7 7 9 7 77 9 8 77 9 9 78 0 1 780 2 780 3 780 4 780 6 780 7 7808 780 9 7811 7812 7813 7 8 1 4 7 8 1 6 78 1 7 78 1 8 7 8 1 9 7 8 2 1 7 8 2 2 7 8 2 3 7 8 2 4 7 8 2 6 7 8 2 7 7 8 2 8 782 9 783 1 7806.71 7806.71 FFE:7805.5 EX : 7 8 0 6 . 8 9 6 7806.66 7806.29 TR E N C H D R A I N 2 : 7 8 0 6 . 5 6 INLET A3 RIM:7820.00 INV IN:7816.59 4" PVC INV OUT:7816.58 6" PVC JUNCTION 1 RIM:15615.48 INV IN:7805.43 6" PVC INV IN:7805.50 4" PVC INV IN:7805.50 4" PVC INV OUT:7805.43 6" PVC JUNCTION 3 RIM:7803.77 INV IN:7803.22 6" PVC INV IN:7803.22 4" PVC INV OUT:7803.22 6" PVC 7806.71 7806.71 7806.71 7806.71 7806.717806.71 PIPE A9a Feet 1:119.99999966 201005 Max slope is 3:1. Specify how this area will be restabilized. MIN 1.5 FT C-33 SAND 7795 7800 WELL DRAINED NATIVE SOIL SAND FILTER WATER ELEVATIONS AND OUTLET DETAIL Show inlet structure for sand filter. Provide energy dispersion for inlet. 1037837.329 CKRC25947 SILVER KING DRIVE CH A T F I E L D R O A D 2407836.117 WK CL 2' 2417835.171 WK CL 2' 2427833.656 WK CL 2' 2437832.871 WK CL 2' 1027837.333 RC25947 1047837.404 SMH 1087836.668 UG MARK 17837.361 RC 25947 PROX. PATH Specify existing and proposed utility lines. Survey included. (Previously submitted with Permit Documents) A level spreader has been added to the western extent of the scour stop pad. We have called out in a note for erosion control matting to be used where disturbed slopes exceed 33%. We have added a UDFCD detail. The inlet and energy dissipation device have been added. The linework has been revised to clarify proposed versus existing utilities. 10/12/2018 Page: [7] Bernsten-C600 Capture: No File Name: PlanSet.975 Chatfield Rd.2018.06.Civil_Change Order 2.pdf Utility lines on utility sheet are hard to interpret. Clarify location. 1037837.329CKRC25947 SILVER KING DRIVE WV CH A T F I E L D R O A D WV WV 57835.677RC25947 2017842.392 UE 2027842.505UE1 2037842.335UC 2047842.072UC 2057842.346UC1 2067842.377UC1 2077842.570UC2 2087842.437UC3 2097843.470UC3 2107842.316 TP 2117842.310 EP 2127842.602ETP 2137841.871UE 2147842.076UE12157841.982UC2167842.240CE 2177841.891 UE 2187842.018UE12197842.061 UC 2207841.810 CE2217841.602UE 2227841.862UE1 2237841.958UC 2247841.001UE 2257841.126UE1 2267841.412UC 2277840.059UE 2287840.264 UE12297839.429UE12307839.177UE 2317841.228UC 2327842.281 UC 2337842.198 TP 2347839.270UG 2357839.800UG 2367839.755UG 2377840.213CE 2387840.551CE 2397840.577UG 2407836.117 WK CL 2' 2417835.171WK CL 2' 2427833.656 WK CL 2' 2437832.871WK CL 2'2447832.203WK CL 2' 2457831.385WK CL 2' 2467829.279WK CL 2' 2477828.813WK CL 2' 2487828.289WK CL 2'2497828.020WK CL 2' 2507827.451 WK CL 2' 2517826.615WK CL 2' 2817828.851UC 2827834.479UC 2837834.676UE 1017839.020TS FRONT 1027837.333 RC25947 1047837.404SMH 1057837.209FF GARAGE 1067837.316FF SILL 1077837.193FF 1087836.668UG MARK 1097835.101TS WALK 1107838.987CKTSDRIVE 1117835.946 CLWK 1157835.102CKTSWALK 17837.361 RC 25947 67838.993TS FRONT EX-UE EX-UE EX-UE EX-UE EX-UE EX-UE EX-UE EX-UE EX-UE EX-UE G G G G G G G CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV T T T T T T T T T T T T T T T T T T T T T T F.F. GARA G E 7837.2' SILL 7837.3' F.F. 7837.2' WOOD WALK 7835.9' APPROX. PATH TELEPHO N E LINE CABLE TV L I N E ELECTRI C LINE GASLINE CONCRET E DRIVEWA Y ELECTRIC TRANSFO R M E R & PED. TELEPHO N E PEDESTAL TELEPHO N E PEDESTAL PI P E A 1 INLET A1 RIM:7829.9728.16 4" PVC28.16 4" PVC PIPE A2 P I P E A 3 INLET A2 RIM:7828.7126.88 4" PVC26.88 4" PVC E G SILVER KING DRIV WV 1017839.020TS FRONT 1047837.404MH 1057837.209 FF GARAGE 1107838.987CKTSDRIVE67838.993TS FRONT F.F. GAR A G E 7837.2' NO Utility lines on utility sheet are hard to interpret. Clarify location. The linework has been revised to clarify proposed versus existing utilities. 10/12/2018