Loading...
HomeMy WebLinkAboutFile Documents.541 Race St.0084.2019.ARBKN 10/04/17 DATE OF PUBLICATION 200'400'800'100' 1" = 200'C-0.0 COVER SHEET 03/21/17 PERMIT 541 RACE STREET NOTES: 1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE CITY OF ASPEN ("COA") MUNICIPAL CODE, COA TECHNICAL MANUALS, AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE TECHNICAL MANUAL OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL UTILITY WORK SHALL BE INSPECTED AND APPROVED BY THE UTILITY. 2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. 3.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE CRITERIA AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ONSITE AT ALL TIMES. 4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING,TRAFFIC CONTROL, AND SECURITY. 5.IF DURING THE CONSTRUCTION PROCESS CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE WOODY CREEK ENGINEERING, LLC IMMEDIATELY. 6.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD UNLESS SPECIFICALLY STATED OTHERWISE. 7.THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN IN ACCORDANCE WITH MUTCD TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY (TOWN, COUNTY OR STATE) FOR APPROVAL PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 8.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR AS DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED UNLESS SPECIFICALLY NOTED OTHERWISE. 9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE. 10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE AND AVAILABLE AT ALL TIMES. 11.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT WOODY CREEK ENGINEERING, LLC FOR CLARIFICATION AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS. 15. THE CONTRACTOR SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE, THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN. 16.ALL STRUCTURAL EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO ANY OTHER EARTH-DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREA IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. 17.THE CONTRACTOR SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES. 18.HEAT TAPE ALL PIPES. 19.100'-0" = 7935'-1.2" VICINITY MAP 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O 10/04/17 CHECK SET 10/14/2017 10/4/2017 09/11/2019 I storm grates N89°20'00"W 85.41' N89°20'00"W 85.41' N0 0 ° 4 0 ' 0 0 " E 71 . 0 5 ' S0 0 ° 4 0 ' 0 0 " W 71 . 0 5 ' 6068.38 sq.ft.+/- LOT 6 RA C E A L L E Y 20 ' R I G H T O F W A Y B1 A1 A2 A3 A4 A5 A6 A7 C D E F B2 7933 79 3 3 7 9 3 5 7934 79 3 5 7935 7936 7937 7934 storm grates N89°20'00"W 85.41' N89°20'00"W 85.41' N0 0 ° 4 0 ' 0 0 " E 71 . 0 5 ' S0 0 ° 4 0 ' 0 0 " W 71 . 0 5 ' 6068.38 sq.ft.+/- LOT 6 RA C E A L L E Y 20 ' R I G H T O F W A Y 793 3 7932 79 3 4 79 3 6 79 3 7 793 6 79 3 7 79 3 8 793 7 7936 79 3 5 7 9 3 4 79 3 3 79 3 2 79 3 5 7931 7 9 3 2 EX1 EX2 79 3 8 N 10'20'40'5' 1" = 10' C-1.0 BASINS NOTES: 1.EXISTING DRAINAGE BASIN CONSISTS OF LOT. 2.PROPOSED DRAINAGE BASINS ARE DETERMINED BY TOPOGRAPHY AND STRUCTURE. HISTORICAL DRAINAGE BASINS PROPOSED DRAINAGE BASINS HISTORICAL DRAINAGE BASINS PROPOSED DRAINAGE BASINS 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O 10/04/17 DATE OF PUBLICATION 03/21/17 PERMIT CHECK SET10/04/17 10/14/201710/4/2017 09/11/2019 7935 7937.75 storm grates N89°20'00"W 85.41' N89°20'00"W N0 0 ° 4 0 ' 0 0 " E 71 . 0 5 ' S0 0 ° 4 0 ' 0 0 " W 71 . 0 5 ' 6068.38 sq.ft.+/- LOT 6 RA C E A L L E Y 20 ' R I G H T O F W A Y 79 3 3 7932 79 3 4 79 3 6 79 3 7 79 3 6 79 3 7 79 3 5 7 9 3 4 79 3 3 79 3 2 79 3 5 7931 7 9 3 2 -2.0% 4" TRENCH DRAIN PIPE B PIPE C 1X SILVA CELLS COVER = 2 FT AREA = 204 SF PIPE D PUMP VAULT -2.0% -2.1% TW=7935 TW=7937.33 -12.5% -0 . 0 % 6" TRENCH DRAIN -8.0% -2.0% 2.0% 7933 79 3 3 7 9 3 5 7934 7936 7937 7 9 3 5 7935 7934 79 3 2 -7 . 7 % -1 . 8 % -2.3% FOUR RISERS FF=7935 FT FF=7937.6 FT FF=7935 FT FF=7935.1 FT FOUR RISERS FLOW LINE TBC CONNECT TO TRENCH DRAIN PIPE E OUTLET -1.9% -2.7% -2.4% TW=7927.87GREEN ROOF: 7935 SLOPE > 2% TW=7937.27 TW=7936 7935TW=7938 TW=7938 TW = 7928.91 PIPE F PIPE G 6" PERF. PVC PIPE TD=7937.19 TD=7924.56 TD=7934.85 TOW = 7934.0 PLANTER -3 . 8 % 7933.16 7935.20 7935.48 7935.30 7934.89 7933.08 7933.39 7933.83 7934.70 7935.05 7935.10 7934.85 7934.96 7934.98 7934.85 7937.60 7934.89 7934.89 7935.10 7935.08 7934.98 WO: 7924.77 BW = 7924.55 WO: 7924.77 BW = 7924.55 TW = 7927.87 TW = 7927.87 BW = 7927.58 BW = 7927.87 BW = 7927.87 7934 7937.60 TBC = 7937.19 7937.75 FLOW LINE = 7937.42 7933.00 7935.20 7936.28 7937.60 7937.60 FLOW LINE = 7937.48 TD = 7927.58 7935.43 7935.72 BW = 7929.05 BW = 7929.05 BW = 7929.05 TW = 7927.87 BW = 7927.87 7932.81 7933.47 7934.98 DRAINAGE EASEMENT (HATCHED) TIE INTO EXISTING STRUCTURE 1.56 IN ORIFICE INV = 7919.13 FT EXISTING STRUCTURE GR=7928.83 FT INV IN=7926.45 FT (E) INV IN = 7919.14 FT (N) INV OUT = 7919.07 FT (W) OUTLET IE=7926.97 FT 7932.65 7932.99 INLET IE=7929.15 FT TBC = 7937.14 TBC = 7937.37 -3 . 2 % 1. 6 % CURB TOW:7935.5 TOW:7935.8 79 3 8 7935.06 7935.06 7935.06 7935.06 -1.04% -1.04% 7935.06 7935.06 7935.15 7935.26 7935.29 7935.48 7935.09 7933 DO NOT GRADE ON ADJACENT PROPERTY OTHER SIDE OF SWALE SHOWN FOR REFERNCE INSTALL TYPE A CURB AND GUTTER INSTALL TYPE A CURB AND GUTTER INSTALL TYPE A CURB AND GUTTER TOW = 7940.25 7936 7937 7937 7936 ERRANT VEHICLE PROTECTION WALL PROVIDE MINIMUM 2-FT DISTANCE FROM FACE OF CURB TO FACE OF WALL WIDTH=10-IN SEE STRUCTURAL PLANS (SDA-01) FOR DETAIL 7938.5 7938.5 TREE DRIPLINE 79 3 2 . 5 0 79 3 2 . 7 5 7 9 3 2 . 2 5 79 3 3 SWALE N 5'10'20'2.5' 1" = 5' C-2.0 GRADING & DRAINAGE 54 1 R A C E EXISTING TREE REMOVED EXISTING TREE KEPT EXISTING CONTOUR PROPOSED CONTOUR NOTES: 1.ROOF AREA = 3089 SF 2.TOTAL IMPERVIOUS AREA= 3873 SF. 3.UTILITY LOCATIONS UNKNOWN AND ASSUMED. REPLACE CURB AND GUTTER IF DAMANGED DURING CONSTRUCTION. 4.ALL INLETS ARE NDS 6" ROUND GRATES WITH SPEE-D CATCH BASINS 7910 SPOT ELEVATION XXXX.XX CONC. = CONCRETE HP = HIGH POINT TD = TRENCH DRAIN UTILITY SERVICE E=ELECTRIC UG=UNDERGROUND GAS SS=SANITARY SEWER W=WATER 54 1 R A C E S T R E E T , A S P E N , C O DATE OF PUBLICATION 03/21/17 PERMIT STRUCTURE IMPERVIOUS PERMIT 6/20/2019 6/28//18 PROGRESS--CHANGE2/11/19 MOVE PIPE PER PARKS DEPT6/4/19 Pipe Deleted Pump vault location changed. Courtwell yard trench drain changed to inlets. Discharge line routed north instead of south. Moved Pipe out of Tree Dripline. Added Dripline. Regraded to a swale. 1/11/20186/22/2019 09/11/2019 PROPOSED SURFACE 7900.00 7910.00 7920.00 7930.00 7940.00 7950.00 7960.00 0+00.00 0+25.00 0+50.00 0+75.00 JUNCTION 3.1 7920.00 7930.00 7940.00 0+00.00 0+25.00 0+29.90 PIPE B 2% SLOPE TRENCH DRAIN PIPE D 2% SLOPE PIPE C 2% SLOPE STA:0+10.57 ELEV:7924.56 STA:0+22.42 ELEV:7927.58 STA:0+09.79 ELEV:7935.06 STA:0+10.40 ELEV:7923.24 STA:0+17.46 ELEV:7925.42 STA:0+22.58 ELEV:7925.51 2 MUNRO FS E 13 HP SUMP PUMPS FLOAT SWITCHES AT 7922.04 STA:0+14.09 ELEV:7923.17 STA:0+17.83 ELEV:7922.19 STA:0+20.94 ELEV:7922.28 STA:0+13.83 ELEV:7921.18 C-3.1 PROFILES & CROSS-SECTIONS COURTWELL PROFILE AND PUMP VAULT INCLUDING PIPE B,C,D PIPE A PROFILE NOTES: 1.TRENCH DRAIN IS ZURN Z-706 WITH HEAVY DUTY DUCTILE IRON SLOTTED GRATE - TRAFFIC RATED SEE DETAILS C-4.0. 2.INLETS AND INLET GRATES ARE NDS 9" CATCH BASIN SERIES AND NDS 980-9" SQ. GRATES. SEE DETAILS C-4.0. DATE OF PUBLICATION 03/21/17 PERMIT 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O CHECK SET 6/20/19 10/04/17 MOVE PIPE PER PARKS DEPT6/4/19 PROPOSED SWALE PROFILE 1/11/20186/22/2019 Changed to allow different runoff routing. Added swale to collect runoff. 09/11/2019 7910.00 7920.00 7930.00 7940.00 7950.00 7960.00 0+00.00 0+15.00 7900.00 7910.00 7920.00 7930.00 7940.00 7950.00 7960.00 0+00.00 0+21.00 7900.00 7910.00 7920.00 7930.00 7940.00 7950.00 7960.00 0+00.00 0+21.00 7930.00 7940.00 0+00.00 0+25.00 0+40.00 C-3.2 PROFILES & CROSS-SECTIONS PIPE F PROFILE PIPE H PROFILE PIPE G PROFILE DATE OF PUBLICATION 03/21/17 PERMIT 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O CHECK SET 2/21/19 10/04/17 PIPE K PROFILE CHANGE ORDER 12/21/19 1/11/20182/21/2018 New pump vault discharge line. 09/11/2019 7900.00 7910.00 7920.00 7930.00 7940.00 7950.00 7960.00 0+00.00 0+25.00 0+50.00 0+75.00 0+76.69 PROPOSED SURFACE 7915.00 7920.00 7930.00 0+00.00 0+25.00 0+50.00 0+60.00 STA:0+17.03 ELEV:7926.76 STA:0+00.00 ELEV:7926.97 STA:0+00.00 ELEV:7928.83 STA:0+00.00 ELEV:7930.22 STA:0+58.72 ELEV:7919.13 STA:0+00.00 ELEV:7926.76 C-3.3 PROFILES & CROSS-SECTIONS PIPE E PROFILE NOTES: 1.TRENCH DRAIN IS ZURN Z-706 WITH HEAVY DUTY DUCTILE IRON SLOTTED GRATE - TRAFFIC RATED SEE DETAILS C-4.0. 2.INLETS AND INLET GRATES ARE NDS 9" CATCH BASIN SERIES AND NDS 980-9" SQ. GRATES. SEE DETAILS C-4.0. PIPE I PROFILE DATE OF PUBLICATION 03/21/17 PERMIT 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O CHECK SET 2/21/19 10/04/17 2/21/19 CHANGE ORDER 1 1/11/20182/21/2018 Changed due to rerouting of runoff. 09/11/2019 7935 7935.50 TW =7928.91 7935 TW = 7928.91 7935.06 7935.06 7935.06 7935.06 -1.04% -1.04% 7935.06 7935.06 N 5'10'20'2.5' 1" = 5' C-4.0 UTILITIES DATE OF PUBLICATION 03/21/17 PERMIT 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O PERMIT 10/04/17 4/12/18 1/11/20182/21/2018 09/11/2019 TRENCH DRAIN DETAIL CATCH BASIN AND GRATE DETAIL DECK DRAIN SILVA CELL DETAIL C-5.1 DETAILS DATE OF PUBLICATION 03/21/17 PERMIT 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O 2'4'8'1' SCALE: 1" = 2' CURB AND GUTTER DETAIL CHECK SET 10/04/17 10/04/17 10/14/201710/4/2017 09/11/2019 C-5.2 DETAILS SEDIMENT FENCE DETAIL TRACK PAD DETAIL DATE OF PUBLICATION 03/21/17 PERMIT 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O ORIFICE PLATE DETAIL PUMP DETAIL PERMIT 10/04/17 4/12/18 2/21/19 CHANGE ORDER 1 CURB AND GUTTER DETAIL GRATE DETAIL 1/11/20182/21/2018 Additional grate sizes due to rerouting of flow. Alternative pump spec. 09/11/2019 I RA C E A L L E Y 20 ' R I G H T O F W A Y TR A C K P A D 18 ' X 5 ' N 5'10'20'2.5' 1" = 5' C-6.0 SEDIMENT AND EROSION CONTROL DATE OF PUBLICATION 03/21/17 PERMIT 54 1 R A C E 54 1 R A C E S T R E E T , A S P E N , C O CHECK SET 10/04/17 10/04/17 10/14/201710/4/2017 09/11/2019