Loading...
HomeMy WebLinkAboutFile Documents.81 Exhibition Ln.0143.2019.ARBK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalUse of Building Class of Work New Repair ________ YesNo Will there be NOTICE: This permit becomes null and void if work work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) IFFRTenant Finish Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Zoning Review (50%) CMP (50%)TDM Impact Review REMP Pedestrian CMP (50%) GIS Housing Cash in Lieu Parks Review Tax Water Tap Tax SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Shower____Kitchen Sink (+Disposal)____Dishwasher ____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Env. Health Parks Landscape Approved To Issue Issuance Date ApprovedReviewingDepartmentReviewer NEW SQ FT Exterior area of the lot where the ground is disturbed Square footage of impervious lot surface. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review• Projects involving less than 50% • Projects involving greater than 50% hardscape area and work • soil disturbance area • Projects that trigger a major engineering review • Projects involving interior THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 06/06/2019 0143.2019.arbk X X X X X X LL 6/6/2019 2697.50 527.63 361.20 322.61 322.61 527.63 52.50 4150.00 262.50 R-MF / PD BN 7/16/19 0 1,325.67 0 0 0 BM 8/13/19 CK 6/25/19 PM 6/20/19 SW 8/16/19 DAM 8/22/19