HomeMy WebLinkAboutFile Documents.81 Exhibition Ln.0143.2019.ARBK
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalUse of Building Class of Work
New
Repair
________
YesNo
Will there be
NOTICE: This permit becomes null and void if work
work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
IFFRTenant Finish
Change Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Zoning
Review (50%)
CMP (50%)TDM Impact
Review
REMP Pedestrian
CMP (50%) GIS Housing Cash in Lieu
Parks Review Tax Water Tap
Tax
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub
____Shower____Kitchen Sink (+Disposal)____Dishwasher
____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Env. Health
Parks
Landscape
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewer
NEW SQ FT
Exterior area of the lot where the ground is disturbed
Square footage of impervious lot surface.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review• Projects involving less than 50%
• Projects involving greater than 50% hardscape area and work
• soil disturbance area
• Projects that trigger a major engineering review • Projects involving interior
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
06/06/2019
0143.2019.arbk
X
X
X
X
X
X
LL 6/6/2019
2697.50
527.63
361.20
322.61
322.61
527.63
52.50
4150.00
262.50
R-MF / PD
BN 7/16/19
0
1,325.67
0
0
0
BM 8/13/19
CK 6/25/19
PM 6/20/19
SW 8/16/19
DAM 8/22/19