HomeMy WebLinkAboutFile Documents.813 W Smuggler St.0253.2018 (20).ARBKMarkup Summary 813 W Smuggler Permit 0253.2018.ARBK CSI comments
Subject: Certificate of Occupancy Requirements
Page: 1
Author: aaronr
Date: 10/16/2019 3:28:39 PM
Capture: No
Certificate of Occupancy Requirements (1)
Subject: Dev Rev
Page: 2
Author: aaronr
Date: 10/16/2019 3:28:26 PM
Capture: No
Please provide Concrete
washout and associated Details.
Dev Rev (4)
Subject: Dev Rev
Page: 10
Author: aaronr
Date: 10/16/2019 3:23:25 PM
Capture: No
This is not consistent with micro
piling.
Subject: Dev Rev
Page: 12
Author: aaronr
Date: 10/16/2019 3:24:28 PM
Capture: No
Please provide Site Plan.
Subject: Dev Rev
Page: 8
Author: aaronr
Date: 10/16/2019 3:22:03 PM
Capture: No
Additional details are required.
Please provideConcrete washoutand associatedDetails.
10/1/2018 Page 10 of 14
WORK IS ALLOWED ON SATURDAY. 11.4 NOISE LEVEL MEASUREMENTS NOISE LEVEL MEASUREMENTS SHALL BE MADE WITH A SOUND LEVEL METER USING THE “A” WEIGHTING SCALE SET ON “SLOW” RESPONSE. MEASUREMENTS SHALL BE TAKEN AT THE PROPERTY LINE OF THE SITE. THE METERS SHALL BE USED ACCORDING TO MANUFACTURER SPECIFICATIONS. BACKGROUND NOISE LEVELS MAY BE TAKEN FOR COMPARISON WITH A GIVEN SOURCE FOR ACCURACY OF A MEASUREMENT. EXTRANEOUS OR MOMENTARY SPIKES IN THE BACKGROUND NOISE READINGS SHALL NOT BE USED TO COMPARE WITH THE SOURCE NOISE READINGS. ENFORCEMENT ACTIONS WILL BE TAKEN IF THE SOURCE OF THE NOISE IS GREATER THAN THE PERMISSIBLE LEVELS. 11.5 CONTINUED NOISE MONITORING MAJOR CONSTRUCTION SITES THAT REQUIRE REINFORCED EARTH STABILIZATION WILL BE REQUIRED TO PERFORM CONTINUED NOISE MONITORING. THIS PROJECT IS NOT A “MAJOR CONSTRUCTION SITE” AND NO REINFORCED EARTH STABILIZATION IS REQUIRED. NO CONTINUED NOISE MONITORING IS REQUIRED OR PLANNED. 11.6 SPECIFIC RESTRICTIONS RELATED TO MANUFACTURING ON SITE THERE WILL BE NO ON SITE MANUFACTURING OF MATERIALS. 12.0 ENFORCEMENT 12.1 CITY CONSTRUCTION MITIGATION OFFICER A CITY CONSTRUCTION MITIGATION OFFICER SHALL BE ASSIGNED TO EACH CONSTRUCTION PROJECT. THE CITY CONSTRUCTION MITIGATION OFFICER WILL COMPLETE RANDOM SITE VISITS TO DETERMINE IF THE PROJECT IS FOLLOWING APPROVED PLAN AND CITY REQUIREMENTS. THE OFFICER IS NOT INTENDED TO TAKE THE PLACE OF A CITY OF ASPEN BUILDING INSPECTOR.
This is not consistentwith micro piling.
10/1/2018 Page 12 of 14
Please provide SitePlan.
10/1/2018 Page 8 of 14
7.0 PEDESTRIAN PROTECTION 7.1 GENERAL PEDESTRIAN ACCESS PLAN SHALL COMPLY WITH PEDESTRIAN SAFETY PER CITY CODE 21.04.060 MUTCD CHAPETER 6D, THE ADA AND IBC CHAPTER 33. TEMPORARY ADA RAMPS WILL BE PROVIDED AS NECESSARY PER CMP SITE PLAN A2.2. COVERED PEDESTRIAN “WALKWAYS” WILL BE INSTALLED PER PHASE. 7.2 LIMITATIONS SIDEWALK CLOSURE IS REQUIRED FOR THE PHASED REPLACEMENT OF THE SUPERSTRUCTURE AS INDICATED ON OUR PHASING PLAN. SEE CMP SITE PLAN A2.2. 8.0 SEDIMENT AND EROSION CONTROL 8.1 REQUIREMENTS VERTICAL MICROPILE SHORING AT THE PERIMETER OF THE EXCAVATION WILL LIMIT ANY POTENTIAL EROSION. 8.2 SMUGGLER MOUNTAIN RESTRICTIONS N/A PROJECT IS NOT LOCATED ON SMUGGLER MOUNTAIN 9.0 FUGITIVE DUST CONTROL 9.1 FUGITIVE DUST CONTROL PLAN THERE IS NO EXCAVATION REQUIRED OR PLANNED UNDER THIS PERMIT APPLICATION. THEREFORE, THERE WILL BE NO SEDIMENT GENERATED AND NO FUGITIVE DUST CONTROL REQUIRED. 9.2 REQUIREMENTS THERE IS NO EXCAVATION REQUIRED OR PLANNED UNDER THIS PERMIT APPLICATION. THEREFORE, THERE WILL BE NO SEDIMENT GENERATED AND NO FUGITIVE DUST CONTROL REQUIRED.
Additional details arerequired.
C-of-O Requirements are for information
purposes only.
No response is necessary.
The Concrete Washout location is now shown
on revised Civil sheet C.1.002 (grading,
drainage & erosion control) near the NE
corner of the site. The washout is detailed on
revised Sheet C.6.001 (miscellaneous details)
Paragraph 11.5 in the CMP has been corrected
to read that, due to micro-pile installation, an
acoustic barrier (as shown on the CMP Plan
referenced below) is required. Note that a
barrier is currently installed on-site in
preparation for construction activity
The CMP Site Plan (Sheet A2.3) is included with
the resubmitted materials. This sheet has
always been included in the Architectural set
since the 1st submittal in 2018. As it was not a
separate document, it was not included with
the review materials for Wastewater/CMP
Paragraph 8.1 in the CMP has been corrected
to read that Sediment & Erosion control
measures are to follow the specifications &
details shown on revised Civil sheets C.1.002
(grading, drainage & erosion control) and
C.6.001 (miscellaneous details)