HomeMy WebLinkAboutFile Documents.210 E Hyman Ave.0110.2019 (8).ARBKPark Central West - Drainage
The work being done to the site at 210 E. Hyman Avenue (Park Central West) will have no impact on the
drainage of the site. The new stamped concrete areas are all occurring in locations that are currently
hardscape. The drainage from the roof of the new enclosure will drain to the green space on either side
of the shed.
05/13/2019
The drainage narrative shall include
all requirements outlined in Appendix
A of the URMP for minor projects.
Include existing and proposed
drainage routes, etc.