Loading...
HomeMy WebLinkAboutSub Permit.610 S West End St.0068.2019 (9).ARBK1 Nick Thompson From:Hanna Werner <hanna@annegrice.com> Sent:Thursday, May 16, 2019 11:59 AM To:Nick Thompson Cc:Anne Grice; Denis Murray Subject:Re: Plan Review Comments for 610 S West End St #F304 Attachments:Asbestos Report The Gant F-304 Aspen, Co..pdf; Pella Window Schedule_REVISED 5.15.19.pdf; MILLS_F304_PROPOSED PLAN_.pdf; TMR Product data 072015.pdf Hi Nick, Please see below items w/ attachments. 1. Asbestos Report attached. 2. We are removing skylight at entryway and replacing with a Velux sun tunnel w/ (U-Factor 0.51) spec. attached 3. W&D duct route & vent termination shown on Electric/Mechanical plan. (A-ID.02) 4. See detail/ceiling assembly w/ 1-hr fire rated Type X board. (L-ID.03) 5. Quiet Rock ES specification is U309 & U340 compliant. (E-ID.03) 6. Combustible mantle material is 13" from fireplace opening. (J-ID.03) 7. Combustible material on the left side of fireplace does not project more than 1-1/2" from fire place face. 8. Existing hearth extension is being replaced by solid-stone (J-ID.03) 9. Exterior doors have a U-Value of 0.27 (see Pella schedule.) Thank you, Hanna Werner Anne Grice Interiors 408 ABC, Suite 201 Aspen, CO 81611 970-429-4148 www.annegrice.com To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. https://www.facebook.com/?ref=logo To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. https://www.instagram.com/annegriceinteriors/?hl=en To help protect your priv acy, Microsoft Office prevented automatic download of this picture from the Internet. https://www.houzz.com/user/annegriceinteriors 2 To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. 46.5 On Tue, May 14, 2019 at 5:49 AM Anne Grice <anne@annegrice.com> wrote: Sent from my iPhone Anne Grice Interiors www.annegrice.com Begin forwarded message: From: Nick Thompson <nick.thompson@cityofaspen.com> Date: May 13, 2019 at 2:47:17 PM CDT To: "anne@annegrice.com" <anne@annegrice.com> Cc: Denis Murray <denis.murray@cityofaspen.com> Subject: Plan Review Comments for 610 S West End St #F304 Hi Anne, I've reviewed your permit application; please see the attached comment list. Please contact me directly if you have any questions on the comments. Get in touch with your permit coordinator to schedule a resubmittal or for questions regarding the overall status in the queue of your permit. Address: 610 S West End St #F304 Permit Number: 0068.2019.ARBK Code: 2015 IBC These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen. State and Federal regulations are administered where applicable. You can find a copy of all adopted codes, ordinances, and policies on our website. The attached corrections are required to be addressed. Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list. Indicate which detail or specification page shows the required information. Responses such as "will comply with code" are not adequate. Revised drawings must clearly show code compliance. Re-submittal: When all items from all agencies have been addressed regarding the comments below, call 970-920-5090 to schedule a required appointment for re-submittal with your Permit Coordinator. You will be required to bring a copy of this letter with ALL responses and required documentation. If all items listed have not been addressed, the resubmittal will be deemed incomplete, and will not be accepted. 3 Building plan check is only one part of the often complex process by which projects are reviewed for approval. These parts are interrelated and are sometimes conflicting. It is ultimately the applicant's responsibility to coordinate these requirements. Thanks, Nick Thompson Plans Examiner City of Aspen Community Development (970) 429-2757 | cell (970) 456-5165 | fax (970)920-5440 www.aspenpitkin.com Stay up to date with Community Development changes and requirements by signing up for our newsletter. Our new 2015 code adoption went into effect February 9, 2017. Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current adopted building codes and code administration, which are subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance.